Conditions Revision Memo to PC 11-8-2023
CITY OF MENIFEE
MEMORANDUM
DATE: November 8, 2023
TO: City of Menifee Planning Commission
FROM: Russell Brown, Senior Planner
CC: Stephanie Roseen, Deputy City Clerk
SUBJECT: Minor Changes to Project Supplemental Conditions of Approval
REFERENCE: Golden Meadows Major Modification (PLN21-0199) and Zoning Code
Amendment (PLN21-0201)
Staff is proposing the following changes to the Applicant proposed Conditions of Approval:
Supplemental Condition No. 1
1. The developer shall work with the City staff and surrounding property ownersneighbors located at
parcels (xxx-xx-xxx through xxx-xx-xxx) 360-200-001, -002, -003, -005, -006, -010, -011, -014, -019, -020,
-021, -022, -023 and 360-710-040 to design an acceptable method to deter daily vehicular traffic, on
Garbani Road and Country Haven Lane. Both of these roadway surfaces are unpaved, and the grades
and sightlines are unsafe for daily commuting traffic by the public. Construction or an in-lieu fee shall
occur be paid by the developer prior to the final occupancyissuance of the 11005th building permit (all
phases)unit. Developers an in-lieu fee shall, in no event, exceed $85,000. The developer shall be
responsible for the design and construction costs of an acceptable alternative (see attached Exhibit A)
through traffic deterrent method for the section of Garbani Road from Country Haven Lane to Daniel
Road. Any required easements associated with the implementation of this condition shall not be
unreasonably withheld. If easements cannot be obtained, that portion of the condition will be deemed
infeasible. If a) 75% of the residents (see APNs listed above) do not agree on a method or b) the
Development Director deems the proposed method infeasible, then the project is exempt from this
condition. Developer shall continue to work with residences to resolve the issues with through traffic,
however in no event shall the actual costs for the gates, improvements and easements (total project
costs) incurred exceed $85,000.00.