2023/11/06 Pavement Coatings, Co. Change of Order No. 001, PMP 23-01M:\Public Works Department\_Public Works Projects\PMP Projects\PMP 23-01 FY 22-23 Slurry Seal Program\C- Construction\C-11 Change orders\co 1\co 1 CITY OF MENIFEE DEPARTMENT OF PUBLIC WORKS DATE: 11/6/2023 CONTRACT CHANGE ORDER NO. 001 Page 1 of 2 PROJECT DESCRIPTION: FY 22-23 SLURRY SEAL PROGRAM PROJECT NO: PMP 23-01 PURCHASE ORDER NO: 04814 CONTRACTOR: Pavement Coatings Co. DESCRIPTION OF CHANGES AND/OR EXTRA WORK: The Contractor is hereby directed to make the herein described changes from the plans and specifications and/or perform the following described work not included in the Plans and Specifications for this project. ITEM DESCRIPTION U/M QUANTITY UNIT PRICE TOTAL 1 INSTALL TYPE IV TRAFFIC ARROWS NOT IN THE ORIGINAL CONTRACT EA 2 $120.75 $241.50 2 BID ITEM 1 ADDITIONAL MOBILIZATION FOR LINDENBERGER DRIVE LS 1 $2,362.50 $2,362.50 3 INSTALL PAVEMENT MARKERS W/ EPOXY (TYPES D&G) NOT IN ORIGINAL CONTRACT EA 51 $15.50 $790.50 4 BID ITEM 9 INSTALL THERMOPLASTIC 12" LIMIT LINE OVER THE ORIGINAL CONTRACT QUANTITY LF 26 $5.10 $132.60 5 BID ITEM 11 INSTALL DOUBLE YELLOW LINE OVER THE ORIGINAL CONTRACT QUANTITY LF 540 $2.60 $1,404.00 6 8" STRIPE DETAIL 38 (LINDENBERGER DRIVE) NOT IN CONTRACT LF 200 $1.58 $316.00 7 BID ITEM 7 INSTALL BLUE DOT TYPE 1 MARKER OVER THE ORIGINAL CONTRACT QUANTITY EA 59 $15.50 $914.50 8 BID ITEM 9 INSTALL THERMOPLASTIC 12" LIMIT LINE OVER THE ORIGINAL CONTRACT QUANTITY LF 7 $5.10 $35.70 9 BID ITEM 11 INSTALLED DOUBLE YELLOW LINES OVER THE ORIGINAL CONTRACT QUANTITY LF 1632.00 $2.60 $4,243.20 10 BID ITEM 6 INSTALL TYPE II SLURRY QUANTITIES OVER THE ORIGINAL CONTRACT QUANTITY TN (28.00) $230.00 ($6,440.00) 11 BIT ITEM 8 INSTALL THERMOPLASTIC "STOP" QUANTITY WAS UNDER THE ORIGINAL CONTRACT QUANTITY EA (1.00) $292.00 ($292.00) TOTAL ESTIMATED PRICE FOR THIS CHANGE ORDER: $3,708.50 This document shall become an amendment to the Contract and all provisions of the Contract will apply hereto. This Change Order constitutes a complete and final resolution of all claims of the Contract for additional time or additional compensation related to or affected by work that is the subject of this Change Order. Quantities of items other than Lump Sum are not to exceed the amounts indicated. JUSTIFICATION: (Be specific on each item. Attach supporting documents as necessary) Due to meeting ADA regulations the cross walk push button needed to be relocated. This required the coring of the newly placed concrete, boring and placintg new conduit, wires, and a foundation for the pole and the pole itself. In addition and unrelated to push button the contractor had to relocate a 1 inch water line to avoid the new storm drain head wall. ITEM 1) TYPE IV ARROWS WERE NOT IN THE ORIGINAL CONTRACT AND WERE REQUIRED AND VERIFIED BY CITY STAFF ITEM 2) THE STRIPING ON LINDENBERGER DRIVE WAS NOT REQUIRED BY THE ORIGINAL CONTRACT THE CONTRACTOR HAD TO REMOBOLIZE TO THE SITE A SECOND TIME. THIS WAS FIELD VERIFIED BY THE CITY INSPECTOR. ITEM 3) THE CONTRACTOR WAS DIRECTED BY CITY STAFF TO INSTALL PAVEMENT MARKERS NOT WITHIN THE SCOPE OF THE ORIGINAL CONTRACT. THE INSTALLATION OF THE MARKERS WAS FIELD VERIFIED BY THE CITY INSPECTOR. ITEM 4-6) LINDENBERGER STRIPING QUANTITIES WERE NOT PART OF THE ORIGINAL BID ITEM QUANTITIES AND WERE ADDED BY CITY STAFF. THIS WAS FIELD VERIFIED BY THE CITY INSPECTOR. ITEM 7) THE FIRE HYDRANT BLUE DOT LOCATOR DEVICE QUANTITIES IN THE FIELD EXCEEDED THE ORIGINAL CONTRACT QUANTITIES. THIS WAS FIELD VERIFIED BY THE CITY INSPECTOR. ITEM 8) THE 12" LIMIT LINE LINEAR FOOTAGE IN THE FIELD EXCEEDED THE ORIGINAL CONTRACT AMOUNT AS VERIFIED BY THE CITY INSPECTOR. ITEM 9) THE DOUBLE YELLOW LINES' ORIGINAL CONTRACT QUANTITIES WERE EXCEEDED BY ACTUAL FIELD QUANTITIES AS VERIFIED BY THE CITY INSPECTOR. ITEMS 10-11) ARE DEDUCTIVE ITEMS IN WHICH THE CONTRACT QUANTITIES WERE LOWER THAN ACTUAL FIELD QUANTITIES AS VERIFIED BY THE CITY INSPECTOR No additional Working Days will be required to perform this work. DocuSign Envelope ID: B42DE9BB-E86E-44F5-84EE-E594BFDFAB0A M:\Public Works Department\_Public Works Projects\PMP Projects\PMP 23-01 FY 22-23 Slurry Seal Program\C- Construction\C-11 Change orders\co 1\co 1 Original Contract Amount: $409,703.50 Previous Change Order Amounts: $0.00 Current Change Order Amount: $3,708.50 Revised Contract Amount: $413,412.00 Date Started: August 7, 2023 Original Completion Date: October 9, 2023 Additional Time (Working Days) 0 Revised Completion Date: October 9, 2023 CITY OF MENIFEE DEPARTMENT OF PUBLIC WORKS CONTRACT CHANGE ORDER NO. 001 Page 2 of 2 CONTRACT VARIANCE SUMMARY CCO # Description Amount % Additional Time Date Approved 1 THE CONTRACT QUANTITES EITHER WERE UNDER OR EXCEEDED IN SEVERAL BID ITEMS AND SOME ITEMS WERE ADDED BECAUSE THEY WERE NOT INT THE ORIGINAL CONTRACT $3,708.50 0.91% 0 Totals $3,708.50 0.91% 0 AUTHORIZATION BY CITY: Recommended for approval by: Date: Date: Carlos Geronimo Project Manager , PE Don Sharp Construction Manager Approved by: Date: Date: Nicolas Fidler Director of Public Works Rebekah Kramer, Acting City Manager ACCEPTANCE BY CONTRACTOR: We, the undersigned Contractor, have given careful consideration to the above described changes and/or extra work and hereby agree that said work is a supplement to the contract and all provisions will apply hereto. Accepted by: Date: Signature Please print name and title DocuSign Envelope ID: B42DE9BB-E86E-44F5-84EE-E594BFDFAB0A James Wu, Vice President 11/7/2023 11/8/2023 11/8/2023 11/9/2023 11/11/2023 Pavement Coatings Co 10240 San Sevaine Way Jurupa Valley, CA 91752 Phone: 714.826.3011 I Fax: 714.826.3129 CA Lie. #303609 CONTRACT CHANGE ORDER REQUEST TO: City of Menifee ATTN: 29844 Haun Rd Menifee, CA 92586 Chad Anema DATE: 9/5/2023 City Inspector (562) 743-1711 PROJECT: PMP 23-01 Slurry Seal Project PCCJob#: PJC003543 RE: Striping On Lindenberger Dr PCC Change Order Req # : Contract Change Order #: I CC0-001 I ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL AMOUNT Install Type IV Arrow 2 EA $ 120.75 $ 241.50 Additional Mobilization 1 LS $ 2,362.50 $ 2,362.50 IAS!all "Blt:1e 9et" =Fype l MaFIEeFP eAifee 5ff!. il95. 51 EA $ 15.50 $ 790.50 9 / Install Thermoplastic 12" Limit Line Per City of Menifee 26 LF $ 5.10 $ 132.60 11 / Install Double Yellow Line Per Caltrans Std. A20A 540 LF $ 2.60 $ 1,404.00 / $ - LJinstall Pavement Markers W/ Epoxy (45 Each D) (6 Each G) I $ - $ - $ - LINE A--> TOTAL CHANGE ORDER REQUEST $ 4,931.10 LINE B --> PREVIOUS CONTRACT AMOUNT $ 409,703.50 LINE A+ B --> PROPOSED REVISED CONTRACT AMOUNT' $ 414,634.60 (ADD'L WORKING DAYS) CONDITIONSLSCOPE: NAME/ TITLE (PRINTED): Krystal Jerome/ Project Manager NAME/ TITLE (PRINTED): SIGNED: SIGNED: DATE: 9/5/2023 DATE: OWNER/PRIME REPRESENTATIVE DocuSign Envelope ID: B42DE9BB-E86E-44F5-84EE-E594BFDFAB0A Page 1 of 2 8/30/2023 1:02:58 PM CAT TRACKING INC. LOCAL UNION 111184 DIR# l 0001)I l7S0 sn(},·licro)li 20(10409 VIBBfl 200.Sl 27974 WOSl:311 \.VOSll170241 DBE/!4324:?- CA'f TRACKING INC. 1? Commcn;fal Avenue Riverside, CA 92507 om...: (951) 682-1494 Fax: (951)682-1491 CA LiceMe //9 1122 To: Address: Pavement Coatings Company 10240 San Senaine Way Mira Loma, CA 91752 Contact: Phone: Fax: Estimating Department (714) 826-3011 (714) 826-3129 Project Name: Lindenberger Dr Change Order Slurry Seal Project PMP No. 23-01 Bid Number: 23603 Project Location: Menifee, CA Bid Date: 8/30/2023 Item DescrIpt1on Estimated Quantity Unit Unit Price Total Price! 1 Install Type IV Arrow 2.00 EACH $115.00 $230.00 7 Install Pavement Markers W/ Epoxy (45 Each D) (6 Each 51.00 EACH $15.00 $765.00 9 G) Jnstall 12 " Limit Line 26.00 LF $5.00 $130.00 11 Install Double Yellow Line Detail 21 ( Markers Are Separate Line Item # 7 ) 540.00 LF $2.50 $1,350.00 12 Mobilization 1.00 LS $2,250.00 $2,250.00 Total Bid Price: $4,725.00 Notes: • Striping Proposal A. A minimum of ten (10) working days prior notification is required for each mobilization. B. The following materials and services are INCLUDED in this quote: Extruded/Ribbon Thermoplastic [Yes] [ YES ] [ 3 m Bonded core Glass beads] Markers [No] Traffic Signs [No] Mast Arm Signs [No] Existing Thermo/Paint Removal [No] Existing Marker Removal [No] Temporary Striping [No] Temp Tab Removal [No] Temporary Signage [No] Post "No Parking" Advance Warning Signage [No] Curb Painting [No] Curb Addresses [No] Pedestrian Barricades [No] Channelizers/Delineators [No] Wheelstops [No] As-Built Plans [No] Lead Compliance [No] C. [ 1 ] Total mobilization is INCLUDED in this quote for permanent striping. Additional mobilization charge: $2,250.00 each. D Traffic control is INCLUDED in this quote for Cat Tracking Inc operations only (Per W.A.T.C.H. Manual). The design and/or supply of Traffic Control Plans are NOT INCLUDED in our price. Additional equipment/labor required to implement customer/agency supplied traffic control plans are both NOT INCLUDED in our price. E If General Contractor or any of its sub-contractors work within Cat Tracking Inc traffic control, the expense will be shared accordingly at Cat Tracking Inc discretion. No advance posting, signing, flagging operations and/or CMS is included for Cat Tracking Inc traffic control. F Pre-striping pavement preparation, Including power sweeping, removal of concrete curing compound, steam cleaning and/or pressure washing if required, is to be done by others prior Cat Tracking Inc's arrival. G Removal of existing striping/pavement markings and/or temporary striping are both NOT lNCLUDED in our price. Fog/slurry seal or asphalt repair of removal areas is NOT INCLUDED in our price. H Video recording and/or photographing of pre-existing conditions is NOT INCLUDED in our price. I This proposal is to be INCLUDED as an attachment to the subcontract if awarded to Cat Tracking Inc. No exceptions. Payment Terms: 1. Contractor to provide monthly progress payments for all completed work in accordance with the bid pricing schedule. Monthly progress payments must be received in full by Cat Tracking Inc no later than Net 30 days after Cat Tracking Inc's invoice date. Delinquent payments will be subject to a 3% interest rate charge per month until payment is received by Cat Tracking Inc. 2. Retainage percentage on monthly progress payments to be no greater than the percentage retained by the Owner on its payments to the Contractor. If Owner reduces the retainage percentages on payments to the Contractor, the Contractor shall likewise reduce the retainage percentage on payments to Cat Tracking Jnc. Full retention to be released no later than thirty (30) days after completion of Cat Tracking Inc's work. Excessive or delinquent retainage will be subject to the highest interest rate allowed by law. DocuSign Envelope ID: B42DE9BB-E86E-44F5-84EE-E594BFDFAB0A Page 2 of 2 8/30/2023 1:02:58 PM Authorized Estimator: Jake Tonkinson 714-227-5029 PM@cattracki11ginc.com CONFIRMED: Cat Tracking Inc. ACCEPTED: are hereby accepted. Date of Acceptance: --------------c----- DocuSign Envelope ID: B42DE9BB-E86E-44F5-84EE-E594BFDFAB0A Pavement Coatings Co 10240 San Sevaine Way Jurupa Valley, CA 91752 Phone: 714.826.3011 I Fax: 714.826.3129 CA Lie. #303609 CONTRACT CHANGE ORDER REQUEST TO: City of Menifee ATTN: Chad Anema DATE: 10/3/2023 29844 Haun Rd City Inspector Menifee, CA 92586 (562) 743-1711 PROJECT: PMP 23-01 Slurry Seal Project PCCJob#: PJC003543 RE: Additional Striping Item On Lindenberger Dr & Striping Quantity Overages PCC Change Order Req # : Contract Change Order#: I CC0-002 I ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL AMOUNT 8" STRIPE DETAIL 38 (LINDENBERGER DR) 200 J_f' $ 1.58 $ 316.00 7 QUANTITY OVERAGE INSTALL "BLUE DOT" TYPE I MARKER PE 59 EA $ 15.50 $ 914.50 9 QUANTITY OVERAGE INSTALL THERMOPLASTIC 12" LIMIT LIi\ 7 LF $ 5.10 $ 35.70 11 QUANTITY OVERAGE INSTALL DOUBLE YELLOW LINE PER CAI 1632 LF $ 2.60 $ 4,243.20 $ - $ - $ - $ . $ - LINE A--> TOTAL CHANGE ORDER REQUEST $ 5,509.40 LINE B --> PREVIOUS CONTRACT AMOUNT $ 414,634.60 LINE A+ B --> PROPOSED REVISED CONTRACT AMOUNl $ 420,144.00 (ADD'L WORKING DAYS) CONDITIONSlSCOPE: NAME/ TITLE (PRINTED): Krystal Jerome/ Project Manager NAME/ TITLE (PRINTED): SIGNED: SIGNED: DATE: 10/2/2023 DATE: OWNER/PRIME REPRESENTATIVE DocuSign Envelope ID: B42DE9BB-E86E-44F5-84EE-E594BFDFAB0A