Loading...
27615 ARDEN ST FIRE20-1545 ROCKPORTIliana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: FIRE20-1545 TR37136 SPK FINAL LOT 80 27615 ARDEN ST Mon 4/26/2021 2:30 PM Mon 4/26/2021 3:00 PM (none) Menifee OFM 2 Rep. Name: HECTOR Co. Name: ----------------FSS Phone#: 951-84 7-2908 Cell#: CrossSt: ROCKPORT HYDRANT SYSTEM Thrust block pre-pour Underoround rough Underground hydro Flush Final SPRINKLER U.G. Thrust block pre-pour Underground rough Underoround hydro Flush Final FIRE SPRINKLER / Weld inspection / Overhead rough piping / Overhead hydro / A/ UG flush / OK to connect /...., Main drain/Inspect. Test / \. T - High pile storage / � In-rack sprinklers / FA' Hose racks / u X Final / -, KITCHENJ('OOD EXTINGUISHING Detectiol)Aystem Funcfudfi Test Gas7Electrical shut-off Nozzle model/placement Fire alarm connection Final SPRAY BOOTHS Installation Air flow test Mechanical interlock Extinguishing system Fire alarm connection Final Start Time: I ::JfT fT I Finish Time: Start Time: I -----------I Finish Time: PASS FAIL � FIRE ALARM PASS Roual:f-"wire inspection Fi,v(ction test ..tJ'uct detectors/velocity / 24 hr. battery test � Sprinkler monitoring / Final / SPECIAL SUPPRESSION , Door fan test / Abort test / Mechanical shutdown / Detector test Deluge/pre-action Final UST/AST TANK Installation Removal Emergency shut off Primary pipino Secondary piping � Dispensers & shear valves X Final ..... MISC. INSPECTION Spray booths Hood/duct extinguishing High pile rack storage H.P. vents/access/corridors Tract access/hydrant verification Other: KNOX SYSTEM Building Knox box Gate access Knox box/padlock BUILDING INSPECTIONS T/1 final Shell final Final for occupancy I ru � I � � ..- 37 FAIL -711n Iliana Gutierrez Subject: Location: FIRE20-1545 TR37136 O/H ROUGH/HYDRO LOT 80 27615 ARDEN ST Start: End: Recurrence: Organizer: Mon 2/8/2021 2:00 PM Mon 2/8/2021 2:30 PM (none) Menifee OFM Call Handling Mode 2: 2 Rep. Name: HECTOR Co. Name:----------------FSS Phone#: 951-847-2908 Cell#: CrossSt: ROCKPORT --------- HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS Thrust block pre-pour Rough-wire inspection Underground rough Function test Underi:iround hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitorinQ SPRINKLER U.G. Final Thrust block pre-pour SPECIAL SUPPRESSION Underi:iround rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping I/ UST/AST TANK X Overhead hydro '\J Installation UG flush / OK to connect /" Removal Main drain/Inspect. Test Emeri:iency shut off High pile storage Primary piping In-rack sprinklers Secondary pipinQ Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extini:iuishinQ Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation BuildinQ Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS ExtinguishinQ system T/1 final Fire alarm connection Shell final Final Final for occupancy Start Time: I ::c:: ""'==="= I Finish Time: I � - Start Time: I I Finish Time: I II-I 29 FAIL n