27615 ARDEN ST FIRE20-1545 ROCKPORTIliana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
FIRE20-1545 TR37136 SPK FINAL LOT 80
27615 ARDEN ST
Mon 4/26/2021 2:30 PM
Mon 4/26/2021 3:00 PM
(none)
Menifee OFM
2
Rep. Name: HECTOR Co. Name: ----------------FSS
Phone#: 951-84 7-2908 Cell#: CrossSt: ROCKPORT
HYDRANT SYSTEM
Thrust block pre-pour
Underoround rough
Underground hydro
Flush
Final
SPRINKLER U.G.
Thrust block pre-pour
Underground rough
Underoround hydro
Flush
Final
FIRE SPRINKLER / Weld inspection / Overhead rough piping /
Overhead hydro / A/
UG flush / OK to connect /....,
Main drain/Inspect. Test / \. T -
High pile storage / �
In-rack sprinklers / FA'
Hose racks / u
X Final / -,
KITCHENJ('OOD EXTINGUISHING
Detectiol)Aystem
Funcfudfi Test
Gas7Electrical shut-off
Nozzle model/placement
Fire alarm connection
Final
SPRAY BOOTHS
Installation
Air flow test
Mechanical interlock
Extinguishing system
Fire alarm connection
Final
Start Time: I ::JfT fT I Finish Time:
Start Time: I -----------I Finish Time:
PASS FAIL � FIRE ALARM PASS
Roual:f-"wire inspection
Fi,v(ction test
..tJ'uct detectors/velocity / 24 hr. battery test
� Sprinkler monitoring
/ Final
/ SPECIAL SUPPRESSION , Door fan test / Abort test
/ Mechanical shutdown
/ Detector test
Deluge/pre-action
Final
UST/AST TANK
Installation
Removal
Emergency shut off
Primary pipino
Secondary piping
� Dispensers & shear valves X Final ..... MISC. INSPECTION
Spray booths
Hood/duct extinguishing
High pile rack storage
H.P. vents/access/corridors
Tract access/hydrant verification
Other:
KNOX SYSTEM
Building Knox box
Gate access Knox box/padlock
BUILDING INSPECTIONS
T/1 final
Shell final
Final for occupancy I ru � I � � ..-
37
FAIL
-711n
Iliana Gutierrez
Subject:
Location:
FIRE20-1545 TR37136 O/H ROUGH/HYDRO LOT 80
27615 ARDEN ST
Start:
End:
Recurrence:
Organizer:
Mon 2/8/2021 2:00 PM
Mon 2/8/2021 2:30 PM
(none)
Menifee OFM
Call Handling Mode 2: 2
Rep. Name: HECTOR Co. Name:----------------FSS
Phone#: 951-847-2908 Cell#: CrossSt: ROCKPORT ---------
HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS
Thrust block pre-pour Rough-wire inspection
Underground rough Function test
Underi:iround hydro Duct detectors/velocity
Flush 24 hr. battery test
Final Sprinkler monitorinQ
SPRINKLER U.G. Final
Thrust block pre-pour SPECIAL SUPPRESSION
Underi:iround rough Door fan test
Underground hydro Abort test
Flush Mechanical shutdown
Final Detector test
FIRE SPRINKLER Deluge/pre-action
Weld inspection Final
X Overhead rough piping I/ UST/AST TANK
X Overhead hydro '\J Installation
UG flush / OK to connect /" Removal
Main drain/Inspect. Test Emeri:iency shut off
High pile storage Primary piping
In-rack sprinklers Secondary pipinQ
Hose racks Dispensers & shear valves
Final Final
KITCHEN HOOD EXTINGUISHING MISC. INSPECTION
Detection system Spray booths
Function Test Hood/duct extini:iuishinQ
Gas/Electrical shut-off High pile rack storage
Nozzle model/placement H.P. vents/access/corridors
Fire alarm connection Tract access/hydrant verification
Final Other:
SPRAY BOOTHS KNOX SYSTEM
Installation BuildinQ Knox box
Air flow test Gate access Knox box/padlock
Mechanical interlock BUILDING INSPECTIONS
ExtinguishinQ system T/1 final
Fire alarm connection Shell final
Final Final for occupancy
Start Time: I ::c:: ""'==="= I Finish Time: I � -
Start Time: I I Finish Time: I II-I
29
FAIL
n