Loading...
27601 BEYER ST FIRE20-0574 ROCKPORT(liana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phone#: 951-847-2908 FIRE20-0574 TR37136 SPK FINAL LOT 67 27601 BEYER ST Mon 8/31/2020 9:30 AM Mon 8/31/2020 10:00 AM (none) Menifee OFM 2 Cell#: Co. Name: FS5 CrpgsSt: ROCKPORT HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to conne,oP IL V Removal Main drain/Inspect. Test Emergency shut off High pile storage. Primary piping In -rack sprinklers Secondary piping Hose racks • Dispensers & shear valves Final I Final KlT.CF4EN HOOD EXTINGUISHING MISC. INSPECTION De tion systern Spray booths Function Test Hood/duct extinguishing :1Gas/Electrical shut-off High pile rack storage tv Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: 9 (liana Gutierrez Subject: FIRE20-0574 TR37136 O/H ROUGH/HYDRO LOT 67 Location: 27601 BEYER ST Start: Thu 6/25/2020 9:30 AM End: Thu 6/25/2020 10:00 AM Recurrence: (none) Organizer: Menifee OFM Rep. Name: HECTOR Co. Name: Phone#: 951-847-2908 Cell#: FSS CrossSt: ROCKPORT HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X I Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: