27590 BEYER ST FIRE20-0578 ROCKPORT(liana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phone#: 951-847-2908
FIRE20-0578 TR37136 SPK FINAL LOT 71
27590 BEYER ST
Mon 8/31/2020 10:00 AM
Mon 8/31/2020 10:30 AM
(none)
Menifee OFM
2
Cell#:
Co. Name: FSS
CrossSt: ROCKPORT
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct deteGtars/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test,00, IL
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers'Ar I
Secondary piping
Hose racks ZZ i
Dispensers & shear valves
X
Final 01f ILFinal
KITCHEK HOOD EWINGUISHING
MISC. INSPECTION
Detec on system
Spray booths
Furj$on Test
Hood/duct extinguishing
s/Efectrfcal shut-off
High pile rack storage
ozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
13
Iliana Gutierrez
Subject:
FIRE20-0578 TR37136 O/H ROUGH/HYDRO LOT 71
Location:
27590 BEYER ST
Start:
Thu 6/25/2020 11:00 AM
End:
Thu 6/25/2020 11:30 AM
Recurrence:
(none)
Organizer:
Menifee OFM
Rep. Name: HECTOR
Co. Name: FSS
Phone#: 951-847-2908
Cell# CrossSt: ROCKPORT
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fad test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Rdmoval
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
j
Final for occupancy
Start Time:
Finish Time:
Start Time:
I Finish Time:
11