PC22-563RESOLUTION NO. PC 22.563
WHEREAS, on July 8, 2021, lhe applicant, Albert Womble, filed a formal
application with the City of Menifee for the approval of Tract Map No. (38219) PLN 21-
0238 for the subdivision of two (2) parcels for condominium purposes totaling 14.22
gross acres and the approval of Plot Plan No. PLN 21-0239 for development of a 198-
unit residential prqect consisting of detached townhomes and one (1) 2,800 square foot
recreation building located west of Bradley Road in between Potomac Drive and Lazy
Creek Road proposed under Plot Plan No. PLN21-0239.
WHEREAS, the thirty-(30)-day public review period for the lS/MND occurred
between May 9,2022 to June 8, 2022. The public review period was publicly noticed by
a publication in a newspaper of general circulation, notice to owners within 300 feet of
the Project site boundaries, and notice to related agencies and government agencies.
The proiect was also required to be transmitted to the State Clearinghouse for review by
State agencies.
WHEREAS, three (3) comment letters on the IS/MND were received during the
public review period from the following interested parties: (1) Santa Ana Regional Water
Control Board; (2) Mrs. Tomasek; and (3) Mrs. Powers.
WHEREAS, on June 22,2022, the Planning Commission held a duly noticed
public hearing on the proiect, considered all public testimony as well as all materials tn
the staff report and accompanying documents, which hearing was publicly noticed by a
publication in the newspaper of general circulation, an agenda posting, onsite sign
postings, and notice to property owners and occupants within 300 feet of the project
boundaries, and to persons requesting public notice; and
WHEREAS, the City has complied with CEQA and the IS/MND is an accurate
and objective statement that fully complies with CEQA, the CEQA Guidelines and
represents the independent judgment of the City; and
WHEREAS, no evidence of new significant impacts or increased severity of
environmental impacts, as defined by CEQA Guidelines Section 15088.5, have been
received by the City after circulation of the draft IS/MND which would require re-
circulation.
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
MENIFEE, CALIFORNIA ADOPTING A MITIGATED NEGATIVE
DECLARATTON FOR TENTATTVE TRACT MAp NO. (38219) pLN 21-
0238 AND PLOT PLAN NO. PLN 2I-0239 LOCATED ON THE
WESTSIDE OF BRADLEY ROAD IN BETWEEN POTOMAC DRIVE
AND LAZY CREEK ROAD (APNS: 338-150-031; 046)
WHEREAS, pursuant to the requirements of the California Environmental
Ouality Act (CEOA), an lnitial Study ("1S") and Mitigated Negative Declaration ("MND")
have been prepared to analyze and mitigate the project's potentially significant
environmental impacts.
NOW, THEREFORE, the Planning Commission of the City of Menifee makes the
following findings as established by the CEQA:
Section 1. The Planning Commission finds on the basis of the evidence presented and
lS/MND for Riverwalk
June 22, 2022
Section 2.
Section 3.
Section 5.
Attest
the whole record before it, including the Draft IS/MND, and any comments
received, that there is no substantial evidence that the project, as mitigated,
will have a significant effect on the environment.
The Planning Commission finds that the Mitigation IVlonitoring and
Reporting Plan ("MMRP"), which is incorporated into the project's
Conditions of Approval by reference, and a copy of which is attached hereto
as Exhibit "l" and incorporated herein by reference, will assure compliance
with the mitigation measures during project implementation.
The Planning Commission finds that the adoption of the IS/MND reflects the
Planning Commission's independent judgment and analysis.
The Planning Commission adopts an lS/MND for the project including but
not limited to the Mitigation and Monitoring Plan as attached to the lS/[/ND.
PASSED, APPROVED AND ADOPTED this 22nd ol June2022
Ur)
David e, Chairman
ante Roseen, Acting City Clerk
Approved as to form:
Th an, Assistant City Attorney
Section 4. The IS/MND, all documents referenced in the MND, and the record of
proceedings on which the Planning Commission's decision is based, are
located at City of Menifee City Hall al 29844 Haun Road, Menifee, CA
92586 and the custodian of record of proceedings is the City of Menifee
City Clerk.
MITIGATION MONITOR!NG AND REPORTING PROGRAM
RIVER WALK VILLAGE PROJECT
River Walk Villate Proiect
Tentative Tract Map Pt21-0238 and Plot Plan No. 21-0239
The program has been prepared in compliance with State law and the Mitigated Negative Declaration
(MND) prepared for the project by the City of Menifee (City).
The California Environmental Quality Act (CEQAI requires adoption of a reporting or monitoring
program for those measures placed on a project to mitigate or avoid significant effects on the
environment (Public Resource Code Section 21081.5). The law states the reporting or monitoring
program shall be designed to ensure compliance during project implementation.
The monitoring program contains the following elements:
1) The mitigation measures are recorded with the action and procedure necessary to ensure
compliance. ln some instances, one action may be used to verify implementation of several
mitigation measures.
2) A procedure for compliance and verification has been outlined for each action necessary. This
procedure designates who will take action, what action will be taken and when, and to whom and
when compliance will be reported.
3) The program has been designed to be flexible. As monitoring progresses, changes to compliance
procedures may be necessary based upon recommendations by those responsible for the
program. As changes are made, new monitoring compliance procedures and records will be
developed and incorporated into the program.
This Mitigation Monitoring and Reporting Program includes mitigation identified in the MND.
STANDARD CONDITIONS
Standard Conditions are presented in instances where the proposed Project would not create a
significant impact but would be required to adhere to regulatory requirements in order to ensure
impacts do not become significant. Standard Conditions outline compliance with various federal,
State, and/or local acts, laws, rules, regulations, municipalcodes, policies, etc.
1MitiBation Monitoring and Reporting Program
This Mitigation MonitorinB and Reporting Program has been prepared for use in implementing
mitigation for the:
MITIGATION MONITORING AND RESPONSIBILITIES
As the Lead Agency, the City is responsible for ensuring full compliance with the mitigation measures
adopted for the proposed Project. The City will monitor and report on all mitigation activities.
Mitigation measures will be implemented at different stages of development throughout the Project
site. ln this regard, the responsibilities for implementation have been assigned to the Applicant,
Contractor, or a combination thereof. lf, during the course of Project implementation, any of the
mitigation measures identified herein cannot be successfully implemented, the City shall be
immediately informed, and the City will then inform any affected responsible agencies. The City, in
coniunction with any affected responsible agencies, will then determine if modification to the Project
is required and/or whether alternative mitigation is appropriate.
MITIGATION MONITORING AND REPORTING PROGRAM
RIVER WALK VILTAGE PROJECT
THIS PAGE INTENTIONALI.Y LEFT BI.ANK
Mitigation Monitoring and Reporting Program 2
MITIGATION MONITORING AND REPORTING PROGRAM
RIVER WALK VILLAGE PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM CHECKTIST
Projed Name: River walk VillaSe Proiect Applicant:
Date:
Al Womble
May 9,2022
Biological Resources
lssuance of a
stop work
order.
Community
Development
Director or
designee
Prior to the
commencement oI
ground disturbance
activities.
Evidence to the City the
required pre-construction
survey has been
completed and, if
necessary, a burrowing owl
protection and relocation
plan is prepared and
applicable provisions of
the burrowinB owl
protection and relocation
proSram have been
satisfied.
MITIGATION MEASURE BIO-1: within 3 days prior to the
commencement of ground disturbance activities, a pre'
constrllction burrowing owl survey shall be conducted by a
qualified bioloBist. The results of the single one-day survey
shall be submitted to the City for review prior to
commencement of any ground disturbance activities on the
Project site. lf burrowing owl are not detected during the pre-
construction survey, no f!rther mitiSation is required.
lf burrowinS owl are detected during the pre-construction
survey or during construction activities at the Project site, a
burrowing owl protection and relocation plan Shall be
prepared by a qualified biologist and sLrbmitted to the
California Department of Fish and Wildlife (CDFW) and United
States Fish and Wildlife Service (USFWS) for review and
approval. The Applicant shall submit evidence to the City that
required and applicable provisions of the burrowing owl
protection and relocation program have been satisfied prior
to the start of any on-site tround disturbance activity.
Evidence to the City:
1) pre-construction
notification has been made
to the United States Army
Corps of Engineers
(usAcE);
2) LJSACE has issued a
Federal Clean WaterAct
Withhold
S.ading permit
or issuance of
a stop work
order.
MITIGATION MEASURE 8lO-2: Prior to the issuance of any
grading permit for ground disturbance in ,urisdictional
features, the Project Applicant shall provide to the City of
Menifee evid€nce that a pre-construction notification ha5
been made to the tjnited States Army Corps of Engineers
(USACE) Los Anteles District pursuanl to Nationwide Permit 7
and that the USACE has issued a tederal Clean Water Act
Section 404 permil and/or an Approved Jurisdictional
Determination. The type, amount, and location of any
Community
Development
Director or
desiBnee
Responsible
for
Monitoring Method of VerificationMitigation Measure No. / lmplementinB Action
Mitigation Monitoring and Reporting Program 3
Timing of
Verification
Veritied
Date/
lnitials
Sanctions for
Non-
Compliance
Prior to issuance of
Brading permit.
MITIGATION MONITORING AND REPORTING PROGRAM
RIVER WALK VILIAGE PROJECT
Project Name: River Walk Village Projed Applicant:
Date:
Al Womble
May 9,2022
required mititation (including payment of fees or purchase of
credits) shall be established by the USACE during the revie$/
of any required permit, and all applicable and required
conditions (if any) identified by the USACE shall be
implemented prior to commencing the activity. This measure
shall be implemented to the satisfaction of the City of
Menifee Community Development Department.
Section 404 permit and/or
an Approved .lurisdictional
Determination;
3) all applicable and
required conditions (if any)
identified by the USACE
shall be implemented prior
to commencing the
activity.
MITIGATION MEASURE BIO-3: Prior to the issuance of any
grading permit for ground disturbance in jurisdictional
features, the Project Applicant shall provide to the City of
Menifee evidenc. that a Federal Clean Water Act Section
401 permit from the Santa Ana Regional Water Quality
Control Soard (RWQCB) Regional Board 8 is issued for the
proposed Project. The type, amount, and location of any
required mitigation (including payment of fees or purchase
of credits) shall be established by the RWQCB during the
review of any required permit, and all applicable and
required conditions (if any) identified by the RWQCB shall
be implemented prior to commencing the activity. This
measure shall be implemented to the satisfaction ofthe City
of Menifee Community Development Department.
Community
Development
Director or
designee
Prior to issuance of
grading permit.
Evidence to the City:
1) a FederalClean Water
Act Section 401 permit
from the Santa Ana
Regional Water Quality
Control Board (RWQCB)
Regional Board 8 is issued
for the proposed Project;
2) all applicable and
required conditions (if any)
identified by the RWQCB
shall be implemented prior
to commencing the
activityj
Withhold
Erading permit
or iSsuance of
a stop work
order.
MITIGATION MEAsURE BIO-4i Prior to the issuance of any
grading permit for ground diiturbance in jurisdictional
features, the Project Applicant shall provide to the City of
Menifeeevidence thata Section 1602 Streambed Alteration
Agreement is issued from the CDFW for the proposed
Community
Development
Director or
designee
Prior to issuance of
grading permit.
Evidence to the City:
1) a Section 1602
Streambed Alteration
Agr€€ment is issued from
Withhold
grading permit
or issuance of
a stop work
order.
Responsible
for
Monitoring
verified
Dat€/
lnitials
Sanctions lor
Non-
ComplianceMethod of VerificationMitigation Measure No. / lmplementing Action
Mitigation Monitoring and Reporting Program 4
Timing of
Verification
MITIGATION MONITORING AND REPORTING PROGRAM
RIVER WAIK VIII.AGE PROJECT
Proied Name: Riwr Walk village Proiect Applicant:
Date:
Al womble
May 9,2022
2) all applicable and
required conditions (if any)
identified by the CDFW
shall be implemented prior
to commencing the
adivity;
the CDFW for the
proposed Project;
Project. The type, amount, and location of any required
mitigation (including payment of fees or purchase of
credits)shall be established bythe CDFWdurinSthe review
of any required permit, and all applicable and required
conditions (if any) identified by the CDFW 5hall be
implemented prior to commencing the activity. This
measure shall be implemented to the satisfaction ofthe City
of Meniree Community Development Department.
Withhold
gradinE permit
or issuance of
a stop work
order.
MITIGATION MEASURE BIO-5: Prior to on-site vegetation
clearance, the Project applicant shall retain a qualified
biologist to conduct a pre-construction nesting bird survey in
accordance with the followingl
. The survey shall be conducted no more than three days
prior to the initiation of clearance/construction work.
. lf pre-construction surveys indicate that bird nests are
not present or are inactive, or if potential habitat is
unoccupied, no funher mititation is required.
lf active nests of birds are found during the surveys, a
species-specific no-disturbance buffer zone shall be
established by a qualified biologist .round active nests
until said qualified bioloSist determiner that all young
have fledged (i.e., are no lon8er reliant upon the nest).
It is recommended that coordination among the
developer of the site, the City of Menifee, the Project
€ngineer, and the consultinB qualified biologist consider
ve8etation clearance outside of the normal bird nesting
season (usually February l through August 31) to avoid
impacts to nesting birds, which would potentially violate
the Migratory Bird Treaty Act. lt should be noted that
Community
Development
Director or
designee
Prior to on-site
vegetation clearance
Evidence to the City:
1) Project applicant retains
a qualifi€d biologist to
conduct a pre-construction
nesting bird surveyj
2) appropriate buffers are
established;
3)installation of
appropriale storm water
Pollution Prevention Plan
(SwPPP) measures;
Responsible
for
Monitoring
Timing of
Verification
Verified
Date/
lnitials
Sanctions for
Non-
ComplianceMitigation Measure No. / lmplementing Action Method of Verification
Mitigation Monitoring and Reporting Program 5
Proiect Name: River Walk Village Pro.iect
MITIGATION MEASURE CUL-I: Prior to issuance of grading
permits, the City of Menifee (City) shall verify that the
following note is included on all grading plans:
Community
Development
Director or
designee
Prior to issuance of
grading permit.
Applicant:
Date:
Evidence to the City
unanticipated cultural
resources diScovery
protocolis included on all
grading plans.
Alwomble
May 9,2022
Withhold
grading permit
or issuance of
a stop work
order.
bird nestingseason isincreasingly less definitive fo r some
year-round resident specieS, Such as hummingbirds and
raptors. Further, ground-dwelling birds such as
burrowing owl, can be affected nearly any time of the
year. lt is therefore advisable to conduct a pre-
construction bird survey no matter the time ofyear.
Removal of veSetation necessitates installation of
appropriate Storm Water Pollution Prevention Plan
(SWPPP) measures, particularly if grading is not
undertaken immediately; therefore, careful timint of the
Project schedule and implementation measures is
necessary to avoid impacts to water quality.
CUTTURAT RESOURCES
Responsible
lot
Monitoring
Verified
Datel
lnitialsMitigation Measure No. / lmplementing Action Method of Verification
Mitigation Monitoring and Reporting Program 6
MITIGATION MONITORING AND REPORTING PROGRAM
RIVER WALK VITLAGE PROJECT
Sanctions for
Non-
Compllance
Timing of
verification
"ln the event that cultural resources are discovered
during project activitier, all wo* in the immediate
vicinity of the find (within a 60-foot buffer) shall cease
and a qualified archaeolotist meeting Secretary of
lnterior standards shall be hired to assess the find. Work
on the other portions of the project outside of the
buffered area may continue during this as5essment
period. Additionally, Native American Tribe(s) who have
expressed interest in consultint on this Project p!rsuant
to Public Resources Code Statute 21080.3.1 shall be
contacted regarding any pre-contact and/or historic-era
finds so as to provide Tribal input with regards to
significance and treatment."
MITIGATION MONITOR!NG AND REPORTING PROGRAM
RIVER WALK VILTAGE PROJECT
This measure shall be implemented to the satisfaction of the
City of Menifee's Community Development Director or
designee.
Evidence to the Cityi
1) a qualilied
archaeological monitor has
been retained to prepare a
Monitorint and Treatment
Plan;
2) a qualified
archaeolotical monitor has
been retained to be
present during grading and
other significant Sround-
disturbint activities;
3) Native American T.ibe(s)who have expressed
interest in consulting on
this Project pursuant to
Public Resources Code
Statute 21080.3.1 are
egnaged.
l5suance of a
stop work
order
Community
Development
Director
designee
ol
Durin8 constructionMITIGATION MEASURE CUL-2: lf siSnificant pre-contact
and/or historic-era cultural resources, as defined by CEQA (as
amended,2015), are discovered and avoidance cannot be
ensured, the archaeoloSist shall develop a Monitoring and
Treatment Plan, the drafts of which shall be provided to
Native American Tribe(s) who have expressed interest in
consulting on this Project pursuant to Public Relources Code
Statute 21080.3.1 for reviewand comm€nt. The archaeologist
shall monitor the remainder of the project and implement the
Plan accordingly. This measure shall be implemented to the
satisfaction ofthe City of Menifee's Community Development
Director or designee.
GEOTOGY AND SOITS
Responsible
for
Monitoring
Verified
Oatel
lnitials
Sanctions for
Non-
Complianc€Mitigation Measure No. / lmplementing Action
Proiect Name: River Walk village Proiect
MITIGATION MEASURE GEO-1: As a portion ol the Project site
is located on land with a high sensitivity to paleontological
resources, the Project Applicant shall retain a qualified
paleontolo8ist to monitor Bround-di5turbing activity during
Project construction. Should any potentially significant fossil
resources be discovered, no further gradinB shall occur
around the discovery until the Community Development
Community
Development
Director
designee.
Prior to issuance of a
grading permit and
durinB construction.
withhold
gradint permit
and/or
issuance of a
stop work
order,
or
Applicant:
Datei
Evidence to the City:
1) Project Applicant retains
a qualified paleontologistj
2) appropriate buffer areas
have been established;
AlWomble
May 9,2022
Mitigation Monitoring and Reporting Program 7
Timing of
verification Method of verification
MITIGAT]ON MONITORING AND REPORTING PROGRAM
RIVER WATK VITIAGE PROJECT
Proiect Name: River Walk Village Proiect
Director is satisfled that adequate provisions are in place to
protect such discovered resources. Unanticipated discoveries
shall be evaluated for significance by the retained qualified
paleontologist. lf significance criteraa are met, then the
Project applicant shall be required to perform data recovery,
professional identification, radiocarbon datin& and other
applicable special studies; submit materials to a museum for
permanent curation; and provide a comprehensive final
report including catalog with museum numbers to the City of
Menifee Community Development Director.
Applicant:
Datei
3) adequate provisions ar€
in place to protect or
retrieve/record/evaluate
such discovered re5ources;
3) formal agreement
between the project
applicant and appropriate
repository for fosrils;
5) submittal of required
evaluation and report by a
qualifi ed paleontologist to
the City.
Al womble
May 9,2022
Responsible
lot
Monitoring
Timing of
Verification
verified
Date/
lnitialsMethod of VeriticationMitigation Measure No. / lmplementing Action
8
Sanctions for
Non-
Compliance
Mitigation Monitoring and Reporling Program
STANDARD CONDITIONS
Prorect Name: River walk Villate Ptoiect Applicant:
Date:
Al womble
May 9,2022
ENERGY
Community
Development
Director or
de5itnee,
and/or Buildint
Official, or
desitn€e.
Prior to the issuance of
grading and building
permits.
Evidence of incorporation of
Best Available Conlrol
Measures durinS
construction of the Project.
STANDARD CONDITION E-l: Prio. to issuance of trading
and building permits, the City of Menifee shall verify that
the Project Applicant and his/her contractor(s) submit
plans to the City indicatinS incorporation of Best
Available Control Measures during construction of the
Project. Best Available Control Mearures include, but are
not limited to, requirements that the Project Applicant
utilize only low-sulfur fuel havint a sulfur content of 15
parts per million by wei8ht or less; ensure off-road
vehicles (i.e., self-propelled diesel-fueled vehicles 25
horsepower and up that were not designed to be driven
on road) limit vehicle idling to five minutes or less;
register and label vehicles in accordance with the
California Air Resources Eoard (CARB) Diesel Off-Road
Online Reporting System; restrict the inclusion of older
vehicles into fleets; and retire, replace, or repower older
engines or install Verified Diesel Emlssion Control
Strategies {i.e., exhaust retrofits). Additionally, the
construction contractor must recycle/reuse at least 65
percent of the construction material (includin& but not
limited to, proposed atgretate base, soil, mulch,
vegetation, concrete, lumber, metal, and cardboard) and
use "Green Buildint Materials," such as those materials
that are rapidly renewable or resource efficient, and
recycled and manufactured in an environmentally
friendly way. for at least 10 percent of the project, in
accordance with CALGreen regulations. Thi5 condition
shall be implemented to the satisfaction oI the City of
Menifee Community Development Director or designee,
Responsible
for Monitoring
Timing of
VerificationStandard Condition No. / lmplementing Action
Mitigation Monitoring and Reporting Program 9
MITIGATION MONITORING AND REPORTING PROGRAM
RIVER WALK VIttAGE PROJECT
Method oI Verification
Verified
Date/ lnitials
Sanctions for
Non-
Compliance
Wilhhold
gradint or
building permit.
MITIGATION MONITORING AND REPORTING PROGRAM
RIVER WALK VITI-AGE PROJECT
Proiect Name: River Walk Village Proiect Applicant:
Date:
Al Womble
May 9,2022
and/or Building Official, or designee.
GEOTOGY AND 50II.5
STANDARD CONOITION G-1i Prior to itsuance ofgrading
and/or building permits, the Project Applicant shall
provide evidence to the Cityfor reviewand approvalthat
proposed structurea, Ieaturer, and facilities have been
designed and will be constructed in conformance with
applicable provisions of the most current edition of the
California Bullding Code in effect at the time of
development application 5ubmittal.
The City may require additional studies and/or
engineering protocols to meet its requirements prior to
issuance of grading and/or building permits. This
condition shall be implemented to the satisfaction of the
City Community Development Director or designee.
Additionally, the Proiect Applicant shall provide evidence
to the City that the recommendations cited in the
project-specific Geotechnical lnvestitations and any
additional studies/protocols are incorporated into
project plans and/or implemented as deemed
appropriate by the City. Geotechnical recommendations
may include, but are not limited to, removal of existint
vegetation, structural foundations, floor slabs, utilities,
and any other surface and subsurface improvement5 that
would not remain in place for use with the new
development. Remedial earthwork, overexcavation, and
ground improvement shall occur to depths specified in
the geotechnical investitations to provide a sufficient
layer of engineered fill or densified soil beneath the
structural footingsfoundations, aswell as propersurface
Diredor of
Building and
Safety or
designee.
Withhold
grading and/or
building
permits.
Prior to the issuance oI
gradint andlor building
permits.
Evidence to the City;
1) design-level plans comply
with Calilornia Euilding Code
in effect at the time of
development application
submittal;
2)design level
geotechnical/soils/geologic
report has been prepared
and recommendations are
incorporated as applicable.
Responsible
for MonitoringStandard Condition No. / lmplementing Action
Miligation Monitoring and Reporting Program '10
Timing of
Verification Method of Verification
Verified
Date/ lnitials
Sanctions for
Non-
Compliance
MITIGATION MONITORING AND REPORTING PROGRAM
RIVER WALK VILI.AGE PROJECT
Proiect Namer River walk Village Pro.ied Applicant:
Date:
Alwomble
May 9,2022
drainage devices and erosion control. Retaining wall
parameters shall be in accordance with the Seotechnical
investigation5 to protect against lateral spreading and
landslides. Construction of concr€te structures in contact
with subgrade soils determined to be corrosive shall
include measures to protect concrete, steel, and other
metals. Verification testing must be performed upon
completion of ground improvements to confirm that the
compressible soils have been sufficiently densified. The
structural engineer must determine the ultimate
thickness and reinforcement of the building floor slab5
based on the imposed slab loading. This condition shall
be implemented to the satisfaction of the Director of
Building and Safety or designee.
HYDROLOGY AND WATER QUAI.ITY
Withhold
grading permit
and/or issuance
of a stop work
order,
Planning
Mana8er of the
City of Menifee
Planning
Department.
Priorto the issuance of
grading permits
STANDARD CONDITION H-1: Prior to con5truction, the
Project Applicant shall prepare and implement a Final
Storm Water Pollution Prevention Plan {5WPPP), meeting
Construction General Permit requir€ments {Santa Ana
Regional Water Quality Control Board Order Number R8-
2010-0033, National Pollutant Discharte Elimination
Syst€m Permit No. CAS618033, as amended) and
designed to reduce potential adverse impacts to surface
water quality through the Project construction period.
The Final SWPPP shall be submitted to the Planning
Manager of the City of Menifee Planning Department for
review and approval prior to the issuance of any permits
for ground-disturbing activity.
The Final SwPPP shall be prepared by a qualified SWPPP
Developer in accordance with the requirements of the
Construction General Permit. Requirements inciude Best
Management Practices (BMPs) for erosion and sediment
Responsible
for Monitoring
Verified
Date/ lnitials
Sandions for
Non-
ComplianceMethod of VerificationStandard Condition No. / lmplementing Action
Mitigation Monitoring and Reporting Program 11
Timing of
Verification
Submittal to the City of a
Storm Water Pollution
Prevention Plan (SWPPP).
MITIGATION MONITORING AND REPORTING PROGRAM
RIVER WALK VILI.AGE PROJECT
Project Name: River Walk Village Project Applicant:
Date:
Alwomble
May 9,2022
control, site management/housekeeping/waste
mana8ement, management of non-storm water
discharges, run-on and runoff controls, and BMP
inspection/maintenance/repair activities. BMP
implementation shall be consistent with the BMP
requirements in the most recent version of the California
Stormwater Quality Association Stormwotet Best
M o nog e me n t H a n d b ook - Co n st ru ct i o n.
The Final SWPPP shall include a construction site
monitoring program that identifies requirements for dry
weather visual observations of pollutants at all discharge
locations and, as appropriate {depending on the Risk
Level), samplinB of the site effluent and receiving waters.
A Qualified SWPPP Practitioner shall be responsible for
implementing the BMPs at the site and performing all
required monitoring and inspection/maintenance/repair
activities.
STANDARD CONDITION H-2: The Project Applicant shall
comply with the Santa Ana Regional Water Quality
Control Board Storm Water permit requirements,
including the Chapter 15.01 (storm Water/Urban Runoff)
of the Menifee Municipal Code. The Project Applicant
shall prepare and implement a Final Water Quality
Management Plan (FWQMP)forthe Project. The FWQMP
shall be submitted to the Planning Manager of the City of
Menifee Planning Department for review and approval
prior to issuance of any permits for ground disturbing
activities. The FWQMP would act as the overall program
document d€signed to provide measures to mitigate
potential water quality impacts associated with the
operation of the proposed Project. At a minimum, the
FWQMP for the Project shall include:
withhold
grading permit
and/or issuance
of a stop work
order.
Prior to the issuance of
grading permit.
Submittal to City of a Final
Water Quality Management
Plan (Final WQMP).
Timing of
Verification
verified
Date/ lnitials
Mitigation Monitoring and Reporting Program 12
Responsible
Standard Condition No. / lmplementing Action for Monitoring Method of Verification
Sanctions for
Non-
Compliance
Planning
ManaEer of the
City of Menifee
Planning
Department.
MITIGATION MONITORING AND REPORT!NG PROGRAM
RIVER WALK VILLAGE PROJECT
Proje€t Name: River walk Village Proiect Applicant:
Date:
An inventory and accounting of existing and
proposed impervious areas.
Low lmpact Development (LlD) design details
incorporated into the Project. Specific LID desiSn
may include, but is not limited to usinE pervious
pavements and green roofs, dispersing runoff to
landscaped areas, and/or routing runoff to the
storm water detention/retention chamber system
that would be developed on site as part of the
Project design.
. Measures to address potential storm water
contaminants. These may include measures to
cover or control potential Sources of storm water
pollutants at the Proiect site.
A Final Storm water Facility Operation and Maintenance
Plan for the Project site, which shall include periodic
inspection and maintenance of the storm water drainage
system. Persons responsible for performing and funding
the requirements of this plan shall be identified. This plan
must befinalized priorto issuance ofbuilding permitsfor
the Project.
withhold
8radin8,
buildinE, or
occupancy
permits.
City of Menifee
Building and
Safety
Department.
Prior to the issuance of
grading, building, and
occupancy permits.
Evidence to City of
compliance with National
Flood lnsurance Program
Section 60.3.
Verified
Date/ lnitials
Sanctions for
Non-
ComplianceMethod of VerificationStandard Condition No. / lmplementing Action
Mitigation Monitoring and Reporting Program IJ
Responsible
for Monitoring
Timing of
Verification
STANDARD CONDITION H-3: Prior to issuance of grading
and building permits, the Project Applicant must show
proof that Project plans incorporate on-site drainage,
anchoring methods to prevent floatint structures.
elevation of buildings above flood levels, and flood
proofing, which requires buildings to be inspected and
certified by a professional engineer, surveyor or building
inspector in accordance with National Flood lnsurance
Program Section 60.3. Verification of compliance with
National flood lnsurance Program Section 60.3 i5
AlWomble
May 9,2022
MITIGATION MONITORING AND REPORTING PROGRAM
RIVER WALK VILTAGE PROJECT
Proiect Name: River Walk Village Proiect Applicant:
Date:
Alwomble
May 9,2022
STANDARD CONDITION H-4: Prior to issuance of grading
and building permits, the Project Applicant shall provide
evidence to the City that the grading and building plans
show the lowest floor (including basement) shall be built
above a predetermined base flood elevation (BFE) for
Flood Zone AE. Prior to grading plan approval, the Project
Applicant shall obtain a Conditional Letter of Map
Revision based on Fill (CLOMR,F) from the Federal
Emertency Management AEency (FEMA). Prior to
issuance of the first building permit, the Project Applicant
shall obtain a Letter of Map Revision based on Fill (LOMR
F) from FEMA. ln accordance with California Civil Code
Section 1103, notification must occur to those potentially
affected of the risk involved in locating within a flood
hazad or dam inundation area. This condition shall be
implemented to the satisfaction of the City of Menifee
Building and Safety Department.
City of Menifee
Building and
Safety
Department.
Prior to the issuance of
grading, and building
permits.
Evidence to City
1) grading and building plans
show the lowest floor
(includinE basement) shall
be built above a
predetermined ba5e flood
elevation {BFE) for Flood
Zone A€j
3) Project Applicant obtains
a Letter of Map Revision
based on Fill (LoMR-F)from
FE N4Aj
Timing ol
Verification
Sanctions for
Non-
ComplianceMethod ot Verification
Mitigation l\ilonitoring and Reporting Program 14
Responsible
Standard Condition No. / lmplementing Action for Monitoring
Verified
Date/ tnitials
required prior to issuance of occupancy permits. This
condition shall be implemented to the satisfaction ofthe
City of Menifee Building and Safety Department.
2) Applicant obtains a
Conditional Letter of Map
Revision based on Fill
(CLOMR-F) from the Federal
Emergency Management
Agency (FEMA);
4) Notification occurs to
those potentially affected of
the risk involved in locating
within a flood hazard or dam
inundation area.
Withhold
grading, or
building
permits.
MITIGATION MONITORING AND REPORTING PROGRAM
RIVER WALK VILLAGE PROJECT
Proiect Name: River walk village Proiect
TRANSPORTATION
withhold
occupancY
permit.
Evidence to City Project
Applicant installs a four-way
traffic sitnal at the Bradley
Road/Project Driveway-Rio
Vista Drive intersection.
Evidence to Cily Project
Applicant adds a
northbound through lane at
Bradley Road/Lazy Creek
Road and converts the
southbound right'turn lane
to a southbound throuSh-
right lane.
Withhold
occupancy
permit.
Prior to issuance of the
first occuPancy Permit.
STANOARD CONDITION T-2: Prior to issuance of the first
occupancy permit, the Project Applicant shall add a
northbound through lane at Bradley Road/Lazy Creek
Road and convert the southbound ritht-turn lane to a
southbound through-right lane. The Project Applicant
shall enter into a reimbursement aBreement with the
City of Menifee to receive credits lor this improvement
since it is part of the City's Development lmpact Fee
Program.
Evidence to City Project
Appli.ant adds a
northbound and
southbound through lane at
Bradley Road/Park Avenue.
withhold
occupancy
permit.
City of Menifee
Engineering
Departrnent.
Prior to issuance of the
first occuPancy Permit.
STANDARD CONOITION T-3: Prior to issuance ofthe fir5t
occupancy permit, the Project Applicant shall add a
northbound and southbound through lane at Bradley
Road/Park Avenue. The Projecl Applicant shallenter into
a reimbuGement atreement with the city of Menifee to
receive crediBforthis improvement since it is part ofthe
City's Development lmpact Fee Protram.
Evidence to City Projecl
Applicant adds a second
eastbound left-turn lane and
optimizes the siSnal timing
at the intersection of
Bradley Road/Newport
Road.
Withhold
occupancy
permit.
City of Menifee
€ngineering
Department.
Prior to issuance of the
first occupancy perfi it.
STANDARD coNDlTlON T{i Prior to issuance ofthe first
occupancy permit, the Project Applicant shall add a
second eastbound left-turn lane and optimize the signal
timing at the intersection of Bradley Road/Newport Road
and enter into a reimbursement agreement with the City
of Menifee to be reimbursed the cost of this
improvement minus the fair-share amount of 10.38
percent as identified in the Traffic Study for the Proiect.
Responsible
for Monitoring
TiminB of
Verification
Verified
Date/ lnitialsMethod of VerlficationStandard Condition No. / lmplementing Action
Mitigation Monitoring and Reporting Program 15
Applicant:
Date:
Al Womble
May 9,2022
Sanctions tor
Non-
Compliance
STANDARO COI{DITION T-1: Prio. to issuance ofthe first
occupancy permit, the Project Applicant shall install a
four-way traffic signal at the Bradley Road/Project
Driveway-Rio Vista Drive intersection and enter into a
reimbursement a8reement with the City of Menifee to
receive creditsforthis improvement since it i5 part ofthe
City's Development lmpact Fee Program.
City of Menifee
Engineering
Department.
Prior to issuance of the
first occupancy permit.
City of Menifee
Engineering
Department.
MITIGATION MONITORING AND REPORT!NG PROGRAM
R]VER WAIK VILTAGE PROJECT
Project Name: River Walk Village Project Applicant:
Date:
Al Womble
May 9, 2022
STANDARD CONDITION T-5. Prior to issuance of the first
occupancl permit, the P.oject Applicant shall optimize
the signal timing at Haun Road/Newport Road and enter
into a reimbursement atreement with the City of
Menifee to be re:mbursed the cost of this improvement
minus the fair-share amount of6.22 percent as identified
in the Traffic Study for the Project.
City of Menifee
Engineering
Department.
Evidence to City Project
Applicant optimizes the
signaltiming at Haun
Road/Newport Road.
Withhold
occupancy
permit.
STANOARD CONDITION T-5. Prior to i5suance ofthe first
occupancy permit, the Project Applicant shall convert
Bradley Road to a four-lane secondary road between Rio
Vista Drive and Lazy Creek Road. The Project includes
development of the Project site frontage and will
complete the second southbound throuth lane between
the intersections of Bradley Road/Project Driveway-Rio
Vista Drive and Bradley Road/Lazy Creek Road.
City of Menifee
En8ineering
Department.
Pior to issuance of the
first occupancy permit.
withhold
occupancy
permit.
STANDARO CONDITION T-7. Prior to ls5uance ol the first
occupancy permit, the Proiect Applicant shall convert
Bradley Road to a four,lane secoodary.oad between
[azy Creek Road and Park Avenue and enter into a
reimbursement agreement with the City of Menifee to
receive credits for this improvement since it is part ofthe
City's Development lmpact Fee Protram.
City of Menifee
Engineering
Department.
Prior to issuance of the
first occupancy permit.
Evidenc€ to City Project
Applicant converts B.adley
Road to a four-lane
secondary road between
Lazy creek Road and Park
withhold
occupancy
permit.
STANDARD CONDITION T-E. Prior to issuance of the first
occupancy permit, the Project Applicant shall restripe
Bradley Road north of Newport Road to accommodate
two northbound lanes up to a point where the existing
taper requires a merge back to one lane. The specific
design shall be approved by the City Engineer in the final
City of Menifee
Entineering
Department.
Prior to issuance of the
first occupancy permit.
Sanctions for
Non-
ComplianceMethod of Verification
Mitigation Monitoring and Reporting Program '16
Responsible
Standard Condition No. / lmplementing Action for Monitoring
Timin8 of
Verification
Verified
Date/ lnitials
Priorto issuance ofthe
first occupancy permit.
Evidence to City Project
Applicant converts Eradley
Road to a four-lane
secondary road between Rio
Vista Drive and Lazy Creek
Road and completes the
second southbound through
lane between the
intersections of Bradley
Road/Project Driveway-Rio
Vista Drive and Bradley
Road/Lazy creek Road.
Evidence to City Project
Applicant restripes Bradley
Road north of Newport
Road to accommodate two
northbound lanes up to a
point where the existing
Withhold
occupancy
permit.
Project Name: River Walk village Proiect Applicant:
Date:
Al womble
May 9,2022
taper require5 a merge back
to one lane.
engineering phase. Additionally, the Project applicant
shall pay the fair-share amount of 19.02 percent as
identified in the Traffic Study for the Project to convert
Bradley Road to a four-lane secondary road between
Park Avenue and Newport Road.
TRIBAT CULTURAT RESOURCES
lssuance of a
stop work
order.
City of Menifee
Community
Development
Department.
Evidence to City
unanticipated dircovery
protocol i! implemented for
Tribal Cultural Resources.
STANDARD CONDITION TCR-I: Coltu.al Resourcg
Disposition. ln the event that Native American cultural
resources are discovered during the course of tround-
disturbing activities (inadvertent discoveri€s), the
following procedures shall be carried out for final
dispo5ition of the discoveries:
A. One or more ofthe following treatments, in orderof
preference, shall b€ employed with the lribes.
Evidence of such shall be provided to lhe City of
Menifee Community Development Oepartment:
Preservation-ln-Place of the cultural
resources, if feasible. Preservation in place
means avoidintthe resources, leavint them in
the place where they were found with no
development affecting the integrity of the
resources.
Reburial of the resources on the Project
property. The measures for reburial shall
incllde, at least, thefollowing: Measures and
provisions to protect the future reburialarea
from any future impacts in perpetuity.
Reburial shall not occur until all legally
required cataloging and basic recordation
ii
sanctions tor
Non-
Compliance
MITIGATION MONITORING AND REPORTING PROGRAM
RIVER WALK VIL!.AGE PROJECT
Responsible
Standard Condition No. / lmplementing Action for Monitoring
Timing of
Verification Method of Verification
Verified
Date/ lnitials
i.
During construction.
Mitigation Monitoring and Reporting Program 17
MITIGATION MONITORING AND REPORTING PROGRAM
RIVER WALK VIttAGE PROJECT
Applicant:
Date:
have be€n completed, with an exception that
sacred items, burial goods and Native
American human remain5 are excluded. Any
reburial process shall be culturally
appropriate. Listing of contents and location
of the reburial shall be included in the
confidential Phase lV report. The Phase lV
Report shall be filed with the City under a
confidential cover and not subiect to Public
Records Request.
lf preservation in place or reburial is not
feasible then the resources shall be curated
in a culturally appropriale manner at a
Riverside County curation facility that meets
State Resources Department Office of
Historic PreseNation Guidelines for the
Curation of Archaeological Resources
ensuring access and use pursuant to the
Guidelinet. The collection and alsociated
records shall be transferred, includint title,
and are to be accompanied by payment of
the feer necessary for permanent curation.
Evidence of curation in the form of a letter
from the curatiod facility stating that subject
archaeological materials have been received
and that all fees have been paid, shall be
provid€d bythe landowherto the City. There
shall be no destructive or invasive testing on
sacred items, itemt oI Native American
Cultural Patrimony, burial goods, and Native
American human remains. Results
concerning finds of any inadvertent
Responsible
tor Monitoring
TiminE of
Verification
Verified
Date/ lnitials
Sanctions for
Non-
ComplianceStandard Condition No. / lmplementing Action
Mitigation Monitoring and Reporting Program 18
Proiect Name: Rivet Walk Village Project Al womble
May 9,2022
Method of Verification
MITIGAT]ON MONITORING AND REPORTING PROGRAM
RIVER WAIK VILIAGE PROJECT
Proiect Name: River Walk Village Project Applicant:
Date:
Al womble
May 9,2022
discoveriee shall be included in the Phase lV
monitorint report.
lssuance of a
stop work
order.
During con5truction Evidence to City
unanticipated discovery
protocol is implemented lor
Tribal Cultural Resources.
City of Menifee
Community
Development
Department.
STANDARO CONDITION TCR-2: lnadvenent
A.chaeological Find. lf during ground-disturbance
activities, unique cultural resources are discovered that
were not assessed by the archaeological report(s) and/or
environmental assessment conducted prior to proiect
approval, the following procedures shall be followed.
unique cultural resources are defined, for thi5 condition
only, as being multiple artifacts in close association with
each other, but may include fewer artifacts if the area of
the find is determined to be of siSnificance due to its
sacred or cultural impo(ance as determined in
consultation with the Native American Trib€(s).
A. All ground disturbance activities within 100 feet of
the discovered cultural resources shall be halted
until a meeting is convened between the developer,
the archaeologist, the tribal representative(s) and
the Community Development Director to discuss the
significance of the find.
At the meetinE, the significance of the discoveries
shall be discussed and after consultation with the
tribal representative(s) and the archaeolotist, a
decision shall be made, with the concurrence of the
Community Development Director, a5 to the
appropriate mitigation (documentation, recovery,
avoidance, etc.) for the cultural resources
C. Grading of further ground ditturbance lhall not
retume within the area of the discovery until an
agreement has been reached by all parties as to the
B
Responsible
for Monitoring
Timing of
verification Method ot VerificationStandard Condition No. / lmplementinB Action
Mitigation Monitoring and Reporting Program 19
Veritied
Date/ lnitials
Sanctions for
Non-
Compliance
MITIGATION MONITORING AND REPORTING PROGRAM
RIVER WALK VILTAGE PROJECT
Project Name: River Walk Villate Project Applicant:
Date:
Alwomble
May 9,2022
approp ate mitigation. Work sh.ll be allowed to
continue outride ot the buffer area and will be
monitored by additionalTrabal monitoG if needed.
D. Treatment and avoidance of the newly discovered
resources shall be consirtent with the Cultural
Resources Manatement Plan (CRMP) and
MonitorinE Agreements entered into with the
appropriate tribes. This may include avoidance of
the cultural resources throuSh project design, in-
place preservation of cultural resources located in
native soils and/or reburial on the Project property
so they are not subject to further disturbance in
perpetuity as identifi ed in Non-0isclosure of Reburial
Condition.
lf the find is determined to be significant and
avoidance of the site has not been achieved, a Phase
lll data recovery plan shall be prepared by the
Project archeologist, in consultation with the Tribe,
and shall be submitted to the City for review and
approval prior to implementation of the said plan.
Pursuant to Calif. Pub. Res. Code 6 21083.2(b) avoidanceis the preferred method of preservation for
archaeological resources and cultural resources. lf the
landowner and the Tribe(s) cannot atree on the
significance or the mitigation for the archaeological or
cultural resources, these issues will be prerented to the
City Community Development Director for decision. The
City Community Development oirector shall make the
determination based on the provisions of the California
Environmental Quality Act with respect to archaeological
E
Responsible
for Monitoring
Timing of
Verification
Sandions for
Non-
ComplianceMethod of VerificationStandard Condition No. / lmplementing Action
Mitigation Monitoring and Reporting Program
Verified
Date/ lnitials
MITIGATION MONITORING AND REPORTING PROGRAM
RIVER WALK VILTAGE PROJECT
Proiect Name: River walk Village Project Al womble
May 9,2022
Community
Development
Director or
designee
Durint ground-
disturbing a.tivities
Evidence to the City:
1) Appropriate buffer areat
have been established as
applicable;
2) Coordinate with County
Coroner a5 necessary.
lssuance of a
stop work
order.
STANDARD CONDITION TCR-3: Human Remains. lf
human remainsare encountered, Stale Health and Safety
Code Section 7050.5 states that no further disturbance
shall occur untilthe Riverside County Coroner has made
the necesSary findings as to origin. Further, pursuant to
Public Resource Code Section 5097.98(b) remains shall
be left in place and free from disturbance until a final
decision as to the treatment and disposition has been
made. lf the Riverside County Coroner determines the
remains to be Native American. lhe Native American
Heritage Commission shall be contacted within the
period specified by law (24 hours). Subsequently, the
Native American Heritage Commission thall identify the
"most likely descendant." The most likely descendant
shall then make recommendations and engage in
consultation concerning the treatment of the remains as
provided in Public Resources Code Section 5097.98-
Community
Development
Director or
designee
Throughout Project
conStruction,
Evidence to the City the site
of any reburial of Native
American human remains or
associated Srave goods shall
not be disclosed and shall
not be governed by public
disclosure requirements of
the California Public Records
lssuance of a
stop work
order.
STANDARD CONDITION TCR-4: Non-Disclosure of
Location Reburials. lt is understood by all parties that
unless otherwise required by law, the 5ite of any reburial
of Native Ameracan human remains or associated grave
goods shall not be disclosed and shall not be governed by
public disclosure requirement5 of the California Public
Records Act. The Coroner, pursuant to the specific
exemption set forth in California Government Code 6254
Responsible
for Monitoring
Timing of
Verilication
Verified
Date/ lnitialsStandard Condition No. / lmplementing Action
Mitigation Monitoring and Reporling Program
Applicant:
Date:
Method of verification
Sanctions for
Non-
Compliance
resources, recommendations oI the Project
archaeologist and 5halltake into account the cultural and
religious principles and practices of the Tribe.
Notwithstanding any other rithts available under the
law, the decision of the City Community Development
Director shall be appealable to the City Planning
Commission and/or City Council.
21
MITIGATION MONITORING AND REPORTING PROGRAM
RIVER WALK VILLAGE PROJECT
Applicant:
Date;
Al womble
May 9,2022
Act
withhold
Grading Permit
or issuance of a
stop work
order.
STANDARD CONDITION TCR-s: Archaeolotist Retained.
Prior to issuance of a grading permit the Project applicant
shall retain a Riverside County qualified archaeologist to
monitor all tround-disturbing activities in an effort to
identify any unknown archaeological resources-
The Project Archaeologist and the Tribal monitor(s) shall
manage and oversee monitorint for all initial ground-
disturbing activitie5 and excavation of each portion of the
Project site including clearing, grubbing, tree removals,
mass or rough grading, trenching, stockpiling of
materials, rock crushing, structure demolition, etc. The
Project Archaeologist and the Tribal monitor(s), shall
have the authority to temporarily divert, redirect or halt
the ground-disturbance activities to allow identification,
evaluation, and potential recovery of cultural resources
in coordination with any required 5pecial-interest or
tribalmonitors.
The developer/permit holder shall submit a fully
executed copy of the contract to the Community
Development Department to ensure compliance with
this condition of approval. Upon verification, the
Community Oevelopment Depa.tment shall clear this
condition.
ln addition, the Proiect Archaeolotist, in consultation
with the Consulting Tribe(s), the contractor, and the City,
shall develop a Cultural Resources Management Plan
Community
Development
Diredor or
desitnee
Prior to issuance of
grading permit and
during ground
disturbing activities
Evidence to the City:
1) Project applicant retains a
Riverside County qualifi ed
archaeologist to monitor all
gro u nd-distu rbing .ctivities;
2) Developer/permit holder
shall submit a fully executed
copy ofthe contract to the
Community Development
Department to ensure
compliance with this
condition of approval;
3) Preparation of a Cultural
Resources Management
Plan (CRMP);
Responsible
tor MonitoringStandard Condition No. / lmplementing Action
Mitigation Monitoring and Reporting Program 22
Proiect Name: River Walk Village Project
Timing of
Verification Method of Verification
Verified
Date/ lnitials
Sanctions for
Non-
Compliance
(r)., parties, and Lead Agencies, will be asked to wlthhold
public disclosure inlormation related to such reburial,
pursuant to the specific exemption set forth in California
Government Code 6254 (r).
MITIGATION MONITORING AND REPORTING PROGRAM
RIVER WAIK VITTAGE PROJECT
Projed Name: River Walk Village Proiect Applicant:
Date:
Alwomble
May 9,2022
{CRMP) in consultation pursuant to the definition in AB
52 to address the details, timing and responsibility of all
archaeological and cultural activities that will occur on
the Project site. A consulting tribe is delined as a tribe
that initiated the AB 52 tribalconsultation process for the
Project, has not opted out of the AB 52 consultation
process, and has completed AB 52 con5ultation with the
City as provided for in Cal Pub Res Code Section
21080.3.2(b)(1) of AB 52. Details in the PIan shall include:
A. Project grading and development scheduling
The Project archaeologist and the Consulting
Tribes(s) shall attend the pre-grading meeting with
the City, the construction manager and any
contractoas and will conduct a mandatory Cultural
Re$urces worker Sensitivity Trainint to those in
attendance. The Trainin8 will include a brief review
of the cultural sensitivity of the Proiect and the
surrounding area; what resources could potentially
be identified during earthmovint activities; the
requirements of the monitoring program; the
protocols that apply in the event inadvertent
discoveries of cultural resources are identified,
including who to contact and appropriate avoidance
measures untilthefind(5)can be properly eva luated;
and any other appropriate protocols. All new
construction personnel that will conduct earthwork
or grading activities that betin work on the Project
following the initial Training must take the Cultural
Sensitivltv Training prior to beginnint work and the
Project archaeoiogist and Consulting Tribe(s) shall
B
Verified
Date/ lnitials
Sanctions for
Non-
ComplianceMethod of Verification
i/itigation Monitoring and Reporting Program
Responsible
Standard Condition No. / lmplementing Adion tor Monitoring
Timing of
Verification
MITIGATION MONITOR!NG AND REPORTING PROGRAM
RIVER WAIK VILI.AGE PROJECT
Proiect Name: River Walk Village Proiect Applicant:
Date:
Alwomble
May 9,2022
make themselves available to provide the training on
an as-needed basis.
C. The protocol5 and stipulations that the contractor,
City, Consulting Tribe(s) and Pro.ied archaeolo8ist
will follow in the event of inadvertent cultural
resources discoveries, includint any newly
discovered cultural resource deposits that shall be
5ubject to a culturalresources evaluation.
STANDARO CONDITION TCR-5: Native Ame.ican
Monitoring (Pechanga Band of Luiseho lndiansl. Tribal
monitor(s) shall be required on site during all ground-
disturbing activities, including grading, stockpilint of
materials, engineered fill, rock crushing, etc. The land
divider/permit holder shall retain a qualified tribal
monitor(s) from the Pechan8a Band of l-uisefio tndians.
Prior to issuance of a grading permit, the developer shall
submit a copy of a signed contract between the above-
named Tribe and the land divider/permit holder for the
monitorint of the Project to the Community
Development Department and to the Engineering
Department. The Native American Monitor(s) shall have
the authority to temporarily divert, redirect or halt the
tround-disturbance activities to allow recovery of
cultural resource5, in coordination with the project
Archaeolotist.
Community
Development
and Engineerint
Directo6 or
designees.
Prior to issuance of a
grading permit and
during all ground-
dislurbing activities.
Evidence to the City land
divider/permit holder
retains a qualified trabal
monator(s) from the
Pechanga Band of Luiseffo
lndians. Prior to issuance of
a grading permit, the
developer shall submit a
copy of a signed contract
between the above-named
Tribe and the land
divider/permit holder for
the monitoring of the
Project to the Community
Development Department
and to the Engineering
Department.
withhotd
grading permit
or i5suance of a
stop work
order,
STANOARD CONOITION TCR-7: Native Anerican
Monito,ing (Soboba Band of Luiseho lndians). Tribat
monitor(s) shall be required on site during all ground-
disturbing activities, including grading, stockpiling of
materials, engineered fill, rock crushing, etc. The land
divider/permit holder shall retain a qualjfied tribal
Community
Development
and Engineering
Directors or
designees.
Prior to issuance of a
trading permit and
during all ground
disturbinB activities.
Evidence to the City land
divider/permit holder
retains a qualified tribal
monitor(s) from the Soboba
Band of Luiseffo lndians.
Prior to issuance of a
withhold
grading permit
or iSsuance of a
stop work
order.
Timing of
Verification
Verified
Date/ lnitials
Sanctions for
Non-
Compliance
Mitigation Monitoring and Reporting Program 24
Standard Condition No. / lmplementing Action
Responsible
for Monitoring Method of Verification
MITIGATION MONITORING AND REPORTING PROGRAM
RIVER WALK VILLAGE PROJECT
Proiect Name: River Walk village Project Applicant:
Date:
Al womble
Itay 9,2022
Srading permit, the
developer shall submit a
copy of a signed contract
between the above'named
Tribe and the land
divider/permlt holder for
the monitoring oI the
Project to the Community
Development Department
and to the EntineerinB
Department.
monitor(s) ,rom the Soboba Band of Luisefio lndians.
Prior to itsuance of a gradinS permit, the developer 5hall
submit a copy of a signed contract between the above'
named Tribe and the land divider/permit holder for the
monitoring of the Proiect to the Community
Development Department and to the Engineering
Department. The Native American Monitor(s) shall have
the authority to temporarily divert, redired or halt the
ground-disturbance activities to allow recovery of
cultural resources, in coordination with the Project
Archaeologist.
Submittalto the City two
copier of the Phase lll Data
Recovery report (if required
for the Project) and the
Phase lV Cultural Resources
Monitoring Report that
complies with the
Community Development
Deparlment's requirements
for such reports.
Two copies shall be
submitted to the Eastern
lnformation Center (€lc) at
the Univeriity of California
Riverside (I.JCR) and one
copy shall be submitted to
the Consulting Tribe(s)
Cultural Resources
Depanment(s).
Community
Developm€nt
Director or
designee.
Prior to final
in!pection.
STANDARD CONOITION TCR-8: ArchaeolotY Report -
Phase lll and lv. Prior to final inspection, the developer/
permit holder shall prompt the Project Archaeologist to
submit two copies of the Phase lll Data Recovery report
(if required for the Project) and the Phase lV Cultural
Resources Monitoring Report that complies with the
Community Development Department's requirements
for such reports- The Phase lV report shall include
evidence o, the required cultural/historical sensitivity
traininS for the construction staff held during the pre-
grade meeting. The Community Development
Department shall review the reports to determine
adequate mitigation compliance. Provided the reports
are adequate, the Community Development Department
shall clear this condition. Once the repon(5) are
determined to be adequate, two copies shall be
submitted to the Eastern lnformation Center (ElC) at the
University oI California Riverside {UCR) and one copy
shall be submitted to the Consulting Tribe(s) Cultural
Resources Department(s).
Responsible
for Monitoring
Sanctions Ior
Non-
Complian€eStandard Condition No. / lmplementing Action
Mitigation Monitoring and Reporting Program 25
Timing of
Verifi(ation
Verilied
Date/ lnitialsMethod of Verification
lssuance of a
stop work
order.
?+^
\#
gr1l
STATE OF CALIFORNIA
COUNTY OF RIVERSIDE
CITY OF MENIFEE
l, Stephanie Roseen, Acting City Clerk of the City of Menifee, do hereby certify that the foregoing
Planning Commission Resolution No. PC22-563 was duly adopted by the Planning Commission
of the City of Menifee at a meeting thereof held on the 22'd day of June 2022 by the following
vote:
)
)ss
)
Ayes:
Noes:
Absent:
Abstain:
Diederich, LaDue, Thomas, White
None
Madrid
None
nie Roseen, CMC