Loading...
29893 BRIDLEGATE WAY FIRE21-1710 JASPERIliana Gutierrez Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: FIRE21-1710 TR36485 SPK FINAL LOT 2 29893 BRIDLEGATE WAY Thu 3/10/2022 12:30 PM Thu 3/10/2022 1:00 PM (none) Meeting organizer Menifee OFM 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name: FSS �u•��r��rcti��ar HYDRANT SYSTEM PASS FAIL FIRE ALARM ASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Underground hydro Duct detectors/velocitv Flush 24 hr. battery test Final Sprinkler monitor' SPRINKLER U.G. Final Thrust block pre -pour SPEICIAL SUPPRESSION Underground rough Doorf4n test Underground hydro ort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Z Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTAGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical ut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alar connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM I tallation Building Knox box it flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 3 (liana Gutierrez Subject: FIRE21-1710 TR36485 O/H ROUGH HYDRO LOT 2 Location: 29893 BRIDLEGATE WAY Start: Mon 1/3/2022 2:30 PM End: Mon 1/3/2022 3:00 PM Recurrence: (none) Meeting Status: Meeting organizer Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name: FSS UrosSSt: JHSrtK HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 53