29885 BRIDLEGATE WAY FIRE21-1708 JASPERDavid Young
Subject: FIRE21-1708 TR36485 SPK FINAL LOT 3
Location: 29885 BRIDLEGATE WAY
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
Thu 3/10/2022 12:30 PM
Thu 3/10/2022 1:00 PM
(none)
Meeting organizer
Menifee OFM
2
Cell#:
Co. Name: FSS
Gross5t: JASPER
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
FAIL
Thrust block pre -pour
Rough -wire inspection /
_PASS
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitorin
SPRINKLER U.G.
Final
Thrust block pre -pour
SPEPAL SUPPRESSION
Underground rough
Door f est
Underground hydro
Ab test
Flush.Mechanical
shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINOUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shy -off
High pile rack storage
Nozzle model/cement
H.P. vents/access/corridors
Fire alarm c nection
Tract access/hydrant verification
Final ZOther:
SPRAY BOOTHS
KNOX SYSTEM
Instagation
Building Knox box
flow test
Gate access Knox box/padlock
AVIechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
1
Iliana Gutierrez
Subject: FIRE21-1708 TR36485 O/H ROUGH HYDRO LOT 3
Location: 29885 BRIDLEGATE WAY
Start: Mon 1/3/2022 3:00 PM
End: Mon 1/3/2022 3:30 PM
Recurrence: (none)
Meeting Status: Meeting organizer
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: JUAN
Phone#: 951-358-9783
Cell#:
Co. Name:
FSS
LAM5501: iA0rr-K
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block re -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
55