Loading...
29885 BRIDLEGATE WAY FIRE21-1708 JASPERDavid Young Subject: FIRE21-1708 TR36485 SPK FINAL LOT 3 Location: 29885 BRIDLEGATE WAY Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Thu 3/10/2022 12:30 PM Thu 3/10/2022 1:00 PM (none) Meeting organizer Menifee OFM 2 Cell#: Co. Name: FSS Gross5t: JASPER HYDRANT SYSTEM PASS FAIL FIRE ALARM FAIL Thrust block pre -pour Rough -wire inspection / _PASS Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitorin SPRINKLER U.G. Final Thrust block pre -pour SPEPAL SUPPRESSION Underground rough Door f est Underground hydro Ab test Flush.Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINOUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shy -off High pile rack storage Nozzle model/cement H.P. vents/access/corridors Fire alarm c nection Tract access/hydrant verification Final ZOther: SPRAY BOOTHS KNOX SYSTEM Instagation Building Knox box flow test Gate access Knox box/padlock AVIechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 1 Iliana Gutierrez Subject: FIRE21-1708 TR36485 O/H ROUGH HYDRO LOT 3 Location: 29885 BRIDLEGATE WAY Start: Mon 1/3/2022 3:00 PM End: Mon 1/3/2022 3:30 PM Recurrence: (none) Meeting Status: Meeting organizer Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name: FSS LAM5501: iA0rr-K HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block re -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 55