Loading...
29861 BRIDLEGATE WAY FIRE21-1571 JASPERJohnathan Baker Subject: FIRE21-1571 TR36485 SPK FINAL LOT 6 Location: 29861 BRIDLEGATE WAY Start: Thu 3/3/2022 9:30 AM End: Thu 3/3/2022 10:00 AM Recurrence: (none) Meeting Status: Meeting organizer Organizer: Johnathan Baker Call Handling Mode 2: 2 Rep. Name: JUAN Co. Name: FSS Phone#: 951-358-9783 Cell#: CrossSt: JASPER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitofrn SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort Ost Flush Mechanical shutdown Final ', Detector test FIRE SPRINKLER Veluge/pre-action Weld inspection !Final Overhead rough piping - /' UST/AST TANK Overhead hydro \ ` Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 41 Johnathan Baker Subject: FIRE21-1571 TR36485 O/H ROUGH/HYDRO LOT 6 Location: 29861 BRIDLEGATE WAY Start: Thu 12/9/2021 1:30 PM End: Thu 12/9/2021 2:00 PM Recurrence: (none) Organizer: Johnathan Baker Call Handling Mode 2: 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name: FSS L•u•NIrl�1;^».4all HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Underground hydro Duct detectors/velocitv Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping :k UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 17