29861 BRIDLEGATE WAY FIRE21-1571 JASPERJohnathan Baker
Subject: FIRE21-1571 TR36485 SPK FINAL LOT 6
Location: 29861 BRIDLEGATE WAY
Start: Thu 3/3/2022 9:30 AM
End: Thu 3/3/2022 10:00 AM
Recurrence: (none)
Meeting Status: Meeting organizer
Organizer: Johnathan Baker
Call Handling Mode 2: 2
Rep. Name: JUAN Co. Name: FSS
Phone#: 951-358-9783 Cell#: CrossSt: JASPER
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitofrn
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort Ost
Flush
Mechanical shutdown
Final
',
Detector test
FIRE SPRINKLER
Veluge/pre-action
Weld inspection
!Final
Overhead rough piping
-
/'
UST/AST TANK
Overhead hydro
\
`
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
41
Johnathan Baker
Subject: FIRE21-1571 TR36485 O/H ROUGH/HYDRO LOT 6
Location: 29861 BRIDLEGATE WAY
Start: Thu 12/9/2021 1:30 PM
End: Thu 12/9/2021 2:00 PM
Recurrence: (none)
Organizer: Johnathan Baker
Call Handling Mode 2: 2
Rep. Name: JUAN
Phone#: 951-358-9783
Cell#:
Co. Name: FSS
L•u•NIrl�1;^».4all
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Underground hydro
Duct detectors/velocitv
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
:k
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
17