Loading...
29853 BRIDLEGATE WAY FIRE21-1567 JASPERJohnathan Baker Subject: FIRE21-1567 TR36485 SPK FINAL LOT 7 Location: 29853 BRIDLEGATE WAY Start: Thu 3/3/2022 10:00 AM End: Thu 3/3/2022 10:30 AM Recurrence: (none) Meeting Status: Meeting organizer Organizer: Johnathan Baker Call Handling Mode 2: 2 Rep. Name: JUAN Co. Name: FSS Phone#: 951-358-9783 Cell#: CrossSt: JASPER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire insp)dction Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. ba4ery test Final j l Sprinklepmonitoring SPRINKLER U.G. F,fnal Thrust block pre -pour SPECIAL SUPPRESSION Underground rough \ Do,6r fan test Underground hydro \. Abort test Flush Mlechanical shutdown Final / \ Detector test FIRE SPRINKLER / J Deluge/pre-action Weld inspection / \ Final Overhead rough piping ( / i UST/AST TANK Overhead hydro Installation UG flush / OK to connect / Removal Main drain/Inspect. Test / Emergency shut off High pile storage \ % Primary piping In -rack sprinklers ! Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING / MISC. INSPECTION Detection system / Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS FJ Extinguishing system T/I final Fire alarm connection Shell final 13 Johnathan Baker Subject: FIRE21-1567 TR36485 O/H ROUGH/HYDRO LOT 7 Location: 29853 BRIDLEGATE WAY Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Thu 12/9/2021 1:30 PM Thu 12/9/2021 2:00 PM (none) Johnathan Baker 2 Cell#: Co. Name: FSS Grossbt: JA5PER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hvdrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 19