Loading...
29837 BRIDLEGATE WAY FIRE21-1568 JASPERJohnathan Baker Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-1568 TR36485 SPK FINAL LOT 9 29837 BRIDLEGATE WAY Thu 3/3/2022 10:00 AM Thu 3/3/2022 10:30 AM (none) Meeting organizer Johnathan Baker C�] Cell#: Co. Name: FSS CrossSt: JASPER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rou h-wjfe inspection Underground rough FunctioA test Underground hydro Duct detectors/veldcit Flush 24 . battery test Final S inkler mony%ring SPRINKLER U.G. inal Thrust block pre -pour SPKEIAL SUPPRESSION Underground rough Door farytest Underground hydro Abort tkst Flush a\ Mec) anical shutdown Final DOector test FIRE SPRINKLER I Velu e/ re -action Weld inspection , Final Overhead rough piping \ UST/AST TANK Overhead hydro ' Installation UG flush / OK to connect i Removal Main drain/Inspect. Test Emergency shut off High pile storage / Primary piping In -rack sprinklers / Secondary piping Hose racks / Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING ILMISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off / High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 11 Johnathan Baker Subject: FIRE21-1568 TR36485 O/H ROUGH/HYDRO LOT 9 Location: 29837 BRIDLEGATE WAY Start: Thu 12/9/2021 2:00 PM End: Thu 12/9/2021 2:30 PM Recurrence: (none) Organizer: Johnathan Baker Call Handling Mode 2: Rep. Name Phone#: JUAN 951-358-9783 Cell#: Co. Name: FSS CrossSt: JASPER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X7 Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 23