29837 BRIDLEGATE WAY FIRE21-1568 JASPERJohnathan Baker
Subject:
Location:
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
FIRE21-1568 TR36485 SPK FINAL LOT 9
29837 BRIDLEGATE WAY
Thu 3/3/2022 10:00 AM
Thu 3/3/2022 10:30 AM
(none)
Meeting organizer
Johnathan Baker
C�]
Cell#:
Co. Name: FSS
CrossSt: JASPER
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rou h-wjfe inspection
Underground rough
FunctioA test
Underground hydro
Duct detectors/veldcit
Flush
24 . battery test
Final
S inkler mony%ring
SPRINKLER U.G.
inal
Thrust block pre -pour
SPKEIAL SUPPRESSION
Underground rough
Door farytest
Underground hydro
Abort tkst
Flush
a\
Mec) anical shutdown
Final
DOector test
FIRE SPRINKLER
I Velu e/ re -action
Weld inspection
, Final
Overhead rough piping
\
UST/AST TANK
Overhead hydro
'
Installation
UG flush / OK to connect
i
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
/
Primary piping
In -rack sprinklers
/
Secondary piping
Hose racks
/
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
ILMISC.
INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
/
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
11
Johnathan Baker
Subject: FIRE21-1568 TR36485 O/H ROUGH/HYDRO LOT 9
Location: 29837 BRIDLEGATE WAY
Start: Thu 12/9/2021 2:00 PM
End: Thu 12/9/2021 2:30 PM
Recurrence: (none)
Organizer: Johnathan Baker
Call Handling Mode 2:
Rep. Name
Phone#:
JUAN
951-358-9783 Cell#:
Co. Name: FSS
CrossSt: JASPER
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X7
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
23