Loading...
29829 BRIDLEGATE WAY FIRE21-1572 JASPERJohnathan Baker Subject: FIRE21-1572 TR36485 SPK FINAL LOT 10 Location: 29829 BRIDLEGATE WAY Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Thu 3/3/2022 9:30 AM Thu 3/3/2022 10:00 AM (none) Meeting organizer Johnathan Baker 2 Cell#: Co. Name: FSS GrosSSt: JASFIEK HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hvdro Duct deWctors/velocity Flush 24/hr. Oattery test Final I �Xprir)kder monitoring SPRINKLER U.G. /Fir)61 Thrust block pre -pour SPECIAL SUPPRESSION Underground rough boor fan test Underground hydro Abort test Flush ! Mechanical shutdown Final Detector test FIRE SPRINKLER f Deluge/pre-action Weld inspection Final Overhead rough piping / UST/AST TANK Overhead hydro Installation UG flush / OK to connect / Removal Main drain/Inspect. Test Emergency shut off High pile storage \ Primary piping In -rack sprinklers Secondary piping Hose racks f Dispensers & shear valves Final / Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off / High pile rack storage Nozzle model/placement / H.P. vents/access/corridors Fire alarm connection Tract access/hvdrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 3 Johnathan Baker Subject: FIRE21-1572 TR36485 O/H ROUGH/HYDRO LOT 10 Location: 29829 BRIDLEGATE WAY Start: Thu 12/9/2021 1:00 PM End: Thu 12/9/2021 1:30 PM Recurrence: (none) Organizer: Johnathan Baker Call Handling Mode 2: 2 Rep. Name: JUAN Phonek 951-358-9783 Cell#: Co. Name: FSS CrossSt: JASPER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping �. UST/AST TANK X Overhead hydro =-. Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 13