29821 BRIDLEGATE WAY FIRE21-1570 JASPERJohnathan Baker
Subject:
Location:
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
FIRE21-1570 TR36485 SPK FINAL LOT 11
29821 BRIDLEGATE WAY
Thu 3/3/2022 9:30 AM
Thu 3/3/2022 10:00 AM
(none)
Meeting organizer
Johnathan Baker
2
Cell#:
Co. Name
FSS
I.rubboL: JA0rrZ M
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity/
Flush
24 hr. battery test
Final
Sprinkler monitorlyfg
SPRINKLER U.G.
Final/
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
1 \
Door fan tdst
Underground hydro
T/
,Abort t($t
Flush
MecWnical shutdown
Final
J
De)6ctor test
FIRE SPRINKLER
Iy'elu a/pre-action
Weld inspection
Final
Overhead rough piping
/'
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
/
Emergency shut off
High pile storage
\
/
Primary piping
In -rack sprinklers
/
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
!
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Johnathan Baker
Subject: FIRE21-1570 TR36485 O/H ROUGH/HYDRO LOT 11
Location: 29821 BRIDLEGATE WAY
Start: Thu 12/9/2021 1:00 PM
End: Thu 12/9/2021 1:30 PM
Recurrence: (none)
Organizer: Johnathan Baker
Call Handling Mode 2: 2
Rep. Name: JUAN
Phone#: 951-358-9783
Cel I#:
Co. Name: FSS
UrUSSOL. JHJI- r_M
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. batte test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
x
UST/AST TANK
X
Overhead hydro
X
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
15