Loading...
29813 BRIDLEGATE WAY FIRE21-1438 JASPERJohnathan Baker Subject: FIRE21-1438 TR36485 SPK FINAL LOT 12 Location: 29813 BRIDLEGATE WAY Start: Thu 1/20/2022 11:00 AM End: Thu 1/20/2022 11:30 AM Recurrence: (none) Meeting Status: Meeting organizer Organizer: Johnathan Baker Call Handling Mode 2: 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name: FSS CrossSt: JASPER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rou h-wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitorin SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush U Mechanical shutdown Final / Detector test FIRE SPRINKLER / ❑elu elpre-action Weld inspection \ / Final Overhead rough piping v / UST/AST TANK Overhead hydro Installation UG flush / OK to connect / Removal Main drainlinspect. Test It Emergency shut off High pile storage Prima piping In -rack sprinklers Secondary piping Hose racks / Dispensers & shear valves X Final dam/ Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system // Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle modellplacement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Johnathan Baker Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-1438 TR36485 O/H ROUGH/HYDRO LOT 12 29813 BRIDLEGATE WAY Tue 11/9/2021 11:00 AM Tue 11/9/2021 11:30 AM (none) Johnathan Baker 2 Cell#: Co. Name: FSS CrossSt: JASPER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 3