Loading...
29789 BRIDLEGATE WAY FIRE21-1440 JASPERJohnathan Baker Subject: FIRE21-1440 TR36485 SPK FINAL LOT 15 Location: 29789 BRIDLEGATE WAY Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Thu 1/20/2022 11:30 AM Thu 1/20/2022 12:00 PM (none) Meeting organizer Johnathan Baker 2 Cell#: Co. Name: FSS CrossSt: JASPER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour , SPECIAL SUPPRESSION Underground rough / Door fan test Underground hydro \ _ Abort test Flush \ Mechanical shutdown Final \ / Detector test FIRE SPRINKLER \ °/ Deluge/pre-action Weld inspection \_ / Final Overhead rough piping \ UST/AST TANK Overhead hydro \ r Installation UG flush / OK to connect // }G Removal Main drain/Inspect. Test �x i Emergency shut off High pile storage \ Primary piping In -rack sprinklers Secondary piping Hose racks / Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING / MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 17 Johnathan Baker Subject: FIRE21-1440 TR36485 O/H ROUGH/HYDRO LOT 15 Location: 29789 BRIDLEGATE WAY Start: Tue 11/9/2021 11:30 AM End: Tue 11/9/2021 12:00 PM Recurrence: (none) Organizer: Johnathan Baker Call Handling Mode 2: 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name: FSS CrossSt: JASPER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydros Installation UG flush / OK to connect Removal Main drain/inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 7