29773 BRIDLEGATE WAY FIRE21-1442 JASPERJohnathan Baker
Subject:
FIRE21-1442 TR36485 SPK FINAL LOT 17
Location:
29773 BRIDLEGATE WAY
Start:
Thu 1/20/2022 11:30 AM
End:
Thu 1/20/2022 12:00 PM
Recurrence:
(none)
Meeting Status:
Meeting organizer
Organizer:
Johnathan Baker
Call Handling Mode 2:
2
Rep. Name: JUAN
Co. Name: FSS
Phone#: 951-358-9783
Cell#: CrossSt: JASPER
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
/ / SPECIAL SUPPRESSION
Underground rough
N
_
0or fan test
Underground hydro
\*s/,
Abort test
Flush
\ \�
.
' Mechanical shutdown
Final
/
Detector test
FIRE SPRINKLER
'
Deluge/pre-action
Weld inspection
\ "
Final
Overhead rough piping
/
UST/AST TANK
Overhead hydro
\ /
Installation
UG flush / OK to connect
/
Removal
Main drain/Inspect. Test
/
Emergency shut off
High pile storage
/
Primary piping
In -rack sprinklers
/
Secondary piping
Hose racks
i
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
15
Johnathan Baker
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
FIRE21-1442 TR36485 O/H ROUGH/HYDRO LOT 17
29773 BRIDLEGATE WAY
Tue 11/9/2021 12:00 PM
Tue 11/9/2021 12:30 PM
(none)
Johnathan Baker
2
Cell#:
Co. Name:
FSS
VIUJJOI. J/1Jr-Cr[
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
13