Loading...
24603 BRAVERY CIRCLE FIRE22-0062 JASPERJohnathan Baker Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: FIRE22-0062 TR36485 SPK FINAL LOT 95 24603 BRAVERY CIRCLE Thu 3/31/2022 1:00 PM Thu 3/31/2022 1:30 PM (none) Meeting organizer Johnathan Baker 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name: FSS VrosSSt: JAbHEK HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough , Door fan test Underground hydro / Abort test Flush N , Mechanical shutdown Final / Detector test FIRE SPRINKLER 7 Deluge/pre-action Weld inspection ` _ \ / Final Overhead rough piping 1 UST/AST TANK Overhead hydro /' Installation UG flush / OK to connect / Removal Main drain/Inspect. Test Emergency shut off High pile storage \ / Primary piping In -rack sprinklers Seconda pipin Hose racks Dispensers & shear valves X Final x Final KITCHEN HOOD EXTINGUISHING / MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 17 (liana Gutierrez Subject: FIRE22-0062 TR36485 O/H ROUGH/HYDRO LOT 95 Location: 24603 BRAVERY CIR Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Thu 1/27/2022 9:30 AM Thu 1/27/2022 10:00 AM (none) Meeting organizer Menifee OFM 2 Co. Name: Cell#: FSS CrossSt: JASPER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 9