Loading...
24585 BRAVERY CIRCLE FIRE22-0065 JASPERJohnathan Baker Subject: FIRE22-0065 TR36485 SPK FINAL LOT 104 Location: 24585 BRAVERY CIRCLE Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name Phone#: JUAN Thu 3/31/2022 1:00 PM Thu 3/31/2022 1:30 PM (none) Meeting organizer Johnathan Baker 2 951-358-9783 Cell#: Co. Name: FSS GrossSt: JASPER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler rponitoring SPRINKLER U.G. Final / Thrust block pre -pour APECIAL SUPPRESSION Underground rough \ oor f46n test Underground hydro -AboA test Flush 7 Mechanical shutdown Final \ )Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping / UST/AST TANK Overhead hydro Installation UG flush / OK to connect / Removal Main drain/Inspect. Test / / Emergency shut off High pile storage / Primary piping In -rack sprinklers / Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING / MISC. INSPECTION Detection system / Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hvdrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 13 (liana Gutierrez Subject: FIRE22-0065 TR36485 O/H ROUGH/HYDRO LOT 104 Location: 24584 BRAVERY CIR Start: Thu 1/27/2022 9:00 AM End: Thu 1/27/2022 9:30 AM Recurrence: (none) Meeting Status: Meeting organizer Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name: FSS liIUJJ�7l. JM�7r-CR HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondarypping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 3