24579 BRAVERY CIRCLE FIRE22-0066 JASPERJohnathan Baker
Subject: FIRE22-0066 TR36485 SPK FINAL LOT 97
Location: 24579 BRAVERY CIRCLE
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name
Phone#:
JUAN
Thu 3/31/2022 1:30 PM
Thu 3/31/2022 2:00 PM
(none)
Meeting organizer
Johnathan Baker
2
951-358-9783 Cell#:
Co. Name
FSS
CrossSt: JASPER
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final /
Thrust block pre -pour
N
'SPECIAL SUPPRESSION
Underground rough
Dq F fan test
Underground hydro
— art test
Flush
echanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
/
/
Emergency shut off
High pile stora a
Primary piping
In -rack sprinklers
Seconds piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
/
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
19
Iliana Gutierrez
Subject: FIRE22-0066 TR36485 O/H ROUGH/HYDRO LOT 97
Location: 24579 BRAVERY CIR
Start: Thu 1/27/2022 10:00 AM
End: Thu 1/27/2022 10:30 AM
Recurrence: (none)
Meeting Status: Meeting organizer
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: JUAN
Phone#: 951-358-9783 Cell#:
Co. Name: FSS
l.rU5501'. JH0rr_M
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
1