Loading...
24561 ARROYO DR FIRE21-1734 NOBLE(liana Gutierrez Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JEFF Phone#: 702-355-3238 FIRE21-1734 TR 36485 SPK FINAL LOT 26 24561 ARROYO DR Mon 3/21/2022 8:30 AM Mon 3/21/2022 9:00 AM (none) Meeting organizer Menifee OFM 2 Cell#: Co. Name ON GUARD UFU55Ji: NVDLC HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test z Underground hydro Duct detectors/velocit Flush 24 hr. battery test Final Sprinklpf monitoring SPRINKLER U.G. Final/ Thrust block pre -pour SPECIAL SUPPRESSION Underground rough IDoor fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro j Installation UG flush / OK to connect , ' Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers W Seconda piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shirt -off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final I ►A Johnathan Baker Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JEFF Phone#: 702-355-3238 FIRE21-1734 TR36485 SPK FINAL LOT 26 24561 ARROYO DR Thu 2/17/2022 8:30 AM Thu 2/17/2022 9:00 AM (none) Meeting organizer Johnathan Baker 2 Cell#: Co. Name: ON GUARD uross5t: NUbLt HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final � �^� kae, , y� "�-t' s L a•�o� Scx� Johnathan Baker Subject: FIRE21-1734 TR36485 O/H ROUGH/HYDRO LOT 26 Location: 24561 ARROYO DR Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JEFF Phone#: 702-355-3238 Fri 12/17/2021 3:30 PM Fri 12/17/2021 4:00 PM (none) Johnathan Baker 2 Cell#: Co. Name: ON GUARD U1U550l: IVUDLC [WAIVIM HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping x UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In-racksprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 17