24549 ARROYO DR FIRE21-1733 NOBLEIliana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: JEFF
Phone#: 702-355-3238
FIRE21-1733 TR 36485 SPK FINAL LOT 25
24549 ARROYO DR
Mon 3/21/2022 8:00 AM
Mon 3/21/2022 8:30 AM
(none)
Meeting organizer
Menifee OFM
2
Cell#:
Co. Name:
ON GUARD
ICI 000C)L. I VvoLC
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test /
Under round hydro
Duct detectorslvelocit
Flush
24 hr. battery test
Final
Sprinkler monitoring_
SPRINKLER U.G.
Find'
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
,
Door fan test
Underground hydro
Abort test
Flush
/
Mechanical shutdown
Final
I _ DdVfor Jest
FIRE SPRINKLER
/
e-action
Weld inspection
'
Overhead rough pipin
/
UST/AST TANK
Overhead hydro
N
I Installation
UG flush / OK to connect
'
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage /'
Primary piping
In-racksprinklers
Seconda piping
Hose racks /
Dispensers & shear valves
x
Final /
Final
KITCHEN HOOD EXTINGJASHING
MISC. INSPECTION
Detections stem /
Spray booths
Function Test /
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/pla ement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extin ui hing system
T/I final
Fire alarm connection
Shell final
Johnathan Baker
Subject: FIRE21-1733 TR36485 SPK FINAL LOT 25
Location: 24549 ARROYO DR
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: JEFF
Phone#: 702-355-3238
Thu 2/17/2022 8:00 AM
Thu 2/17/2022 8:30 AM
(none)
Meeting organizer
Johnathan Baker
2
Cell#:
Co. Name: ON GUARD
CrossSt: NOBLE
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
1 No Qow'o-y AcoeS, +-ors, h,AVCr
Johnathan Baker
Subject: FIRE21-1733 TR36485 O/H ROUGH/HYDRO LOT 25
Location: 24549 ARROYO DR
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2
Rep. Name: JEFF
Phone#: 702-355-3238
Fri 12/17/2021 3:30 PM
Fri 12/17/2021 4:00 PM
(none)
Johnathan Baker
2
Cell#:
Co. Name: ON GUARD
U[U15JG IVIJDLC �C_VHIVIM
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
j Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
X
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In-racksprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
Start Time: Finish Time:
19