24514 WINTER CIRCLE FIRE21-1078 VALOR WESTJohnathan Baker
Subject: FIRE21-1078 TR36485 SPK FINAL LOT 18
Location: 24514 WINTER CIRCLE
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
Fri 12/10/2021 1:00 PM
Fri 12/10/2021 1:30 PM
(none)
Johnathan Baker
2
Cell#:
Co. Name
FSS
Urubbo : VALUM VVCJ I
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery/test
Final
Sprinkler n)6nitorin
SPRINKLER U.G.
Final /
Thrust block pre -pour
ECIAL SUPPRESSION
Underground rough
I DoOr,fan test
Under round hydro
MQft test
Flush
\
Wchanical shutdown
Final
etector test
FIRE SPRINKLER
`
i
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
/
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primapiping
In-racksprinklers
Secondary piping
Hose racks
7
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
/
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extin uishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
29
Iliana Gutierrez
Subject: FIRE21-1078 TR36485 O/H ROUGH/HYDRO LOT 18
Location: 24514 WINTER CIRCLE
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
Tue 8/24/2021 12:00 PM
Tue 8/24/2021 12:30 PM
(none)
Menifee OFM
2
Cell#:
Co. Name: FSS
CrossSt: VALOR WEST
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
_
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
J SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
31