24509 SABATON CIRCLE FIRE20-0428 VAQUERO(liana Gutierrez
Subject: FIRE20-0428 TR36485 SPK FINAL LOT 67
Location: 24509 SABATON CIRCLE
Start: Tue 8/18/2020 11:30 AM
End: Tue 8/18/2020 12:00 PM
Recurrence: (none)
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: DANIEL Co. Name: NP MECHANICAL
Phone#: 951-703-5210 Cellk CrossSt: VAQUERO
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
4 hr. battery test
Final
4
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
44P
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydra IL
Installation
UG flush / OK to connect ILI
Removal
Main drain/inspect. Tes
Emergency shut off
High pile Storage
Primary piping
In -rack sprinklers.jV
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCH.4N HOOD EXTINGUISHING
MISC. INSPECTION
Deter ' ri system
Spray booths
Fun on Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
17
Steven Fox
Subject: FIRE20-0428 TR36485 O/H ROUGH/HYDRO LOT 67
Location: 24509 SABATON CIRCLE
Start: Wed 6/10/2020 2:30 PM
End: Wed 6/10/2020 3:00 PM
Recurrence: (none)
Organizer: Steven Fox
Rep. Name: DANIEL Co. Name
Phone#: 951-703-5210 Cell#:
NP MECHANICAL
CrossSt: VAQUERO
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
C
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
27