24489 ARROYO DR FIRE21-1754 NOBLEJohnathan Baker
Subject:
Location:
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: ALFREDO
Phone#: 951-206-5781
FIRE21-1754 TR36485 SPK FINAL LOT 20
24489 ARROYO DR
Thu 4/7/2022 9:30 AM
Thu 4/7/2022 10:00 AM
(none)
Meeting organizer
Johnathan Baker
2
Cell#:
Co. Name: ON GUARD
UFUS501: NUr5LC
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door,fan test
Underground hydro
Abqft test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
\ \
/
Final
Overhead rough piping
\
UST/AST TANK
Overhead hydro
/ \
/
Installation
UG flush / OK to connect
/
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In-racksprinklers
Seconda pipin
Hose racks
Dispensers & shear valves
Final
u /
Final
KITCHEN HOOD EXTINGUISHING
7
MISC. INSPECTION
Detection system
%
Spray booths
Function Test
/
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
3
Johnathan Baker
Subject: FIRE21-1754 TR36485 O/H ROUGH/HYDRO LOT 20
Location: 24489 ARROYO DR
Start: Tue 1/18/2022 8:00 AM
End: Tue 1/18/2022 8:30 AM
Recurrence: (none)
Meeting Status: Meeting organizer
Organizer: Johnathan Baker
Call Handling Mode 2: 2
Rep. Name: JEFF
Phone#: 702-355-3238
Cell#:
Co. Name: ON GUARD
CrossSt: NOBLE
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitorin
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final