Loading...
24489 ARROYO DR FIRE21-1754 NOBLEJohnathan Baker Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: ALFREDO Phone#: 951-206-5781 FIRE21-1754 TR36485 SPK FINAL LOT 20 24489 ARROYO DR Thu 4/7/2022 9:30 AM Thu 4/7/2022 10:00 AM (none) Meeting organizer Johnathan Baker 2 Cell#: Co. Name: ON GUARD UFUS501: NUr5LC HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door,fan test Underground hydro Abqft test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection \ \ / Final Overhead rough piping \ UST/AST TANK Overhead hydro / \ / Installation UG flush / OK to connect / Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In-racksprinklers Seconda pipin Hose racks Dispensers & shear valves Final u / Final KITCHEN HOOD EXTINGUISHING 7 MISC. INSPECTION Detection system % Spray booths Function Test / Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 3 Johnathan Baker Subject: FIRE21-1754 TR36485 O/H ROUGH/HYDRO LOT 20 Location: 24489 ARROYO DR Start: Tue 1/18/2022 8:00 AM End: Tue 1/18/2022 8:30 AM Recurrence: (none) Meeting Status: Meeting organizer Organizer: Johnathan Baker Call Handling Mode 2: 2 Rep. Name: JEFF Phone#: 702-355-3238 Cell#: Co. Name: ON GUARD CrossSt: NOBLE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitorin SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final