24477 ARROYO DR FIRE21-1753 NOBLEJohnathan Baker
Subject: FIRE21-1753 TR36485 SPK FINAL LOT 19
Location: 24477 ARROYO DR
Start: Thu 4/7/2022 9:30 AM
End: Thu 4/7/2022 10:00 AM
Recurrence: (none)
Meeting Status: Meeting organizer
Organizer: Johnathan Baker
Call Handling Mode 2: 2
Rep. Name: ALFREDO Co. Name: ON GUARD
Phone#: 951-206-5781 Cell#: CrossSt: NOBLE
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
D)6or fan test
Underground hydro
Abort test
Flush
n
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
\
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
A\
/
Installation
UG flush / OK to connect
" /
Removal
Main drain/Inspect. Test
/
Emergency shut off
High pile storage
%
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
/
Dispensers & shear valves
X
Final
/
Final
KITCHEN HOOD EXTINGUISHING
/
MISC. INSPECTION
Detection system
/
Spraybooths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Johnathan Baker
Subject: FIRE21-1753 TR36485 O/H ROUGH/HYDRO LOT 19
Location: 24477 ARROYO DR
Start: Tue 1/18/2022 8:00 AM
End: Tue 1/18/2022 8:30 AM
Recurrence: (none)
Meeting Status: Meeting organizer
Organizer: Johnathan Baker
Call Handling Mode 2: 2
Rep. Name: JEFF
Phone#: 702-355-3238 Cell#:
Co. Name: ON GUARD
CrossSt: NOBLE
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
3