Loading...
24477 ARROYO DR FIRE21-1753 NOBLEJohnathan Baker Subject: FIRE21-1753 TR36485 SPK FINAL LOT 19 Location: 24477 ARROYO DR Start: Thu 4/7/2022 9:30 AM End: Thu 4/7/2022 10:00 AM Recurrence: (none) Meeting Status: Meeting organizer Organizer: Johnathan Baker Call Handling Mode 2: 2 Rep. Name: ALFREDO Co. Name: ON GUARD Phone#: 951-206-5781 Cell#: CrossSt: NOBLE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough D)6or fan test Underground hydro Abort test Flush n Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection \ Final Overhead rough piping UST/AST TANK Overhead hydro A\ / Installation UG flush / OK to connect " / Removal Main drain/Inspect. Test / Emergency shut off High pile storage % Primary piping In -rack sprinklers Secondary piping Hose racks / Dispensers & shear valves X Final / Final KITCHEN HOOD EXTINGUISHING / MISC. INSPECTION Detection system / Spraybooths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Johnathan Baker Subject: FIRE21-1753 TR36485 O/H ROUGH/HYDRO LOT 19 Location: 24477 ARROYO DR Start: Tue 1/18/2022 8:00 AM End: Tue 1/18/2022 8:30 AM Recurrence: (none) Meeting Status: Meeting organizer Organizer: Johnathan Baker Call Handling Mode 2: 2 Rep. Name: JEFF Phone#: 702-355-3238 Cell#: Co. Name: ON GUARD CrossSt: NOBLE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 3