28959 CATTLEMAN CIRCLE FIRE20-0721 TRAILHEAD(liana Gutierrez
Subject: FIRE20-0721 TR31098 SPK FINAL LOT 112
Location: 28959 CATTLEMAN CIRCLE
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phone#: 951-847-2908
Tue 12/22/2020 2:00 PM
Tue 12/22/2020 2:30 PM
(none)
Menifee OFM
2
Cell#:
Co. Name:
FSS
CrossSt: TRAILHEAD
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test le
Underground hydro
I Duct detectors/velo '
Flush
1 24 hr. battery t
Final
I Sprinkler mgWoring
SPRINKLER U.G.
Final
Thrust block pre -pour
PECIAL SUPPRESSION
Underground rough
or fan test
Underground hydro
A'
Abort test
Flush
&40
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
V
Final
Overhead rough piping
&A&
UST/AST TANK
Installation
Overhead hydro
UG flush / OK to connect
F,1
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD QffINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test 4Hood/duct
extinguishing
Gas/E:Iectri shut-off
High pile rack storage
Nozzle aAellplacement
H.P. vents/access/corridors
Fire al rm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time: Finish Time:
27
Marla Gutierrez
Subject:
FIRE20-0721 TR31098 O/H ROUGH/HYDRO LOT 112
Location:
28959 CATTLEMAN CIRCLE
Start:
Wed 9/9/2020 9:00 AM
End:
Wed 9/9/2020 9:30 AM
Recurrence: (none)
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: HECTOR
Phone#: 951-847-2908
Cell#:
Co. Name: FSS
CrossSt: TRAILHEAD MODELS
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
/
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
7