Loading...
28959 CATTLEMAN CIRCLE FIRE20-0721 TRAILHEAD(liana Gutierrez Subject: FIRE20-0721 TR31098 SPK FINAL LOT 112 Location: 28959 CATTLEMAN CIRCLE Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phone#: 951-847-2908 Tue 12/22/2020 2:00 PM Tue 12/22/2020 2:30 PM (none) Menifee OFM 2 Cell#: Co. Name: FSS CrossSt: TRAILHEAD HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test le Underground hydro I Duct detectors/velo ' Flush 1 24 hr. battery t Final I Sprinkler mgWoring SPRINKLER U.G. Final Thrust block pre -pour PECIAL SUPPRESSION Underground rough or fan test Underground hydro A' Abort test Flush &40 Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection V Final Overhead rough piping &A& UST/AST TANK Installation Overhead hydro UG flush / OK to connect F,1 Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD QffINGUISHING MISC. INSPECTION Detection system Spray booths Function Test 4Hood/duct extinguishing Gas/E:Iectri shut-off High pile rack storage Nozzle aAellplacement H.P. vents/access/corridors Fire al rm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: 27 Marla Gutierrez Subject: FIRE20-0721 TR31098 O/H ROUGH/HYDRO LOT 112 Location: 28959 CATTLEMAN CIRCLE Start: Wed 9/9/2020 9:00 AM End: Wed 9/9/2020 9:30 AM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: HECTOR Phone#: 951-847-2908 Cell#: Co. Name: FSS CrossSt: TRAILHEAD MODELS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect / Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: 7