Loading...
28894 CATTLEMAN CIRCLE FIRE20-0111 WESTWARDIliana Gutierrez Subject: FIRE20-0111 TR31098 SPK FINAL LOT 123 Location: 28894 CATTLEMAN CIRCLE Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phone#: 951-847-2908 Tue 8/11/2020 10:00 AM Tue 8/11/2020 10:30 AM (none) Menifee OFM 2 Cell#: Co. Name: FSS CrossSt: WESTWARD MODELS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitori SPRINKLER U.G. Final Thrust block pre -pour SPE SUPPRESSION Underground rough I Door faoAst Underground hydro I Abo st Flush I rAg'hanical shutdown Final Detector test FIRE SPRINKLER elu re -action Weld inspection Overhead rough piping AF W11116UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In-racksprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUIS G MISC. INSPECTION Detections stem ZSpray booths Function Test le Hood/duct extinguishing Gas/Electrical shut-off geHigh pile rack storage Nozzle model/placenot H.P. vents/access/corridors Fire alarm connec ' Tract access/hydrant verification Final Z Other: SPAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extingui hing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 9 (liana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Rep. Name Phone#: FIRE20-0111 TR31098 O/H ROUGH/HYDRO LOT 123 28894 CATTLEMAN CIRCLE Tue 5/12/2020 11:30 AM Tue 5/12/2020 12:00 PM (none) Menifee OFM HECTOR 951-847-2908 Cell#: Co. Name: FSS CrossSt: TRAILHEAD MODELS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping , UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: