Loading...
27269 HIDEOUT CT FIRE21-1476 WESTWARD(liana Gutierrez Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-1476 TR31098 SPK FINAL LOT 205 27269 HIDEOUT CT Thu 2/3/2022 10:30 AM Thu 2/3/2022 11:00 AM (none) Meeting organizer Menifee OFM 2 Cell#: Co. Name: FSS lrfU550l: VVCJ I VVAMU HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspectWn Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler rKbnitoring SPRINKLER U.G. Final Thrust block pre -pour /SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro 9cfiort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER 6 Deluge/pre-action Weld inspection / Final Overhead rough piping / UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test / Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system / Spray booths Function Test / Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 7 (liana Gutierrez Subject: FIRE21-1476 TR31098 O/H ROUGH/HYDRO LOT 205 Location: 27269 HIDEOUT CT Start: Mon 10/25/2021 2:00 PM End: Mon 10/25/2021 2:30 PM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: Rep. Name: Phone#: JUAN 951-358-9783 Cell#: Co. Name: FSS CrossSt: WESTWARD HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 25