27259 HIDEOUT CT FIRE21-1483 WESTWARD(liana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
FIRE21-1483 TR31098 SPK FINAL LOT 206
27259 HIDEOUT CT
Thu 2/3/2022 11:30 AM
Thu 2/3/2022 12:00 PM
(none)
Meeting organizer
Menifee OFM
2
Cell#:
Co. Name: FSS
CrossSt: WESTWARD
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rou h-wire inspection
Underground rough
F,nction test
Underground hydro
Ouct detectors/velocity
Flush
i
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
/
Final
Thrust block pre -pour
/
SPECIAL SUPPRESSION
Underground rough
/
Door fan test
Underground hydro
Abort test
Flush 5wMechanical
shutdown
Final Nr.
Detector test
FIRE SPRINKLER
Delu a/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In-racksprinklers /
Secondary piping
Hose racks
Dispensers & shear valves
X
Final /
Final
KITCHEN HOOD EXTING ISHING
MISC. INSPECTION
Detections stem /
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/ adlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
19
Iliana Gutierrez
Subject: FIRE21-1483 TR31098 O/H ROUGH/HYDRO LOT 206
Location: 27259 HIDEOUT CT
Start: Mon 10/25/2021 2:00 PM
End: Mon 10/25/2021 2:30 PM
Recurrence: (none)
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: JUAN
Phone#: 951-358-9783
Cell#:
Co. Name: FSS
%rWbbJL.yyCJ IyyFV[L)
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluqe/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
23