27238 HIDEOUT CT FIRE21-1486 WESTWARDIliana Gutierrez
Subject: FIRE21-1486 TR31098 SPK FINAL LOT 201
Location: 27238 HIDEOUT CT
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name
Phone#:
JUAN
Thu 2/3/2022 12:00 PM
Thu 2/3/2022 12:30 PM
(none)
Meeting organizer
Menifee OFM
2
951-358-9783 Cell#:
Co. Name
FSS
CrossSt: WESTWARD
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
I Rough -wire ira6ection
Under round rough
Function te$t
Underground hydro
Duct detpbtors/velocit
Flush
24 hr. Vattery test
Final
Sprigfder monitoring
SPRINKLER U.G.
Fipfil
Thrust block pre -pour
/ SPECIAL SUPPRESSION
Underground rough
�- --
Door fan test
Underground hydro
/
Abort test
Flush
Mechanical shutdown
Final
/
Detector test
FIRE SPRINKLER
/
Deluge/pre-action
Weld inspection
/
Final
Overhead rough piping
/
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
/
Removal
Main drain/Inspect. Test
/
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
/
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
23
(liana Gutierrez
Subject: FIRE21-1486 TR31098 O/H ROUGH/HYDRO LOT 201
Location: 27238 HIDEOUT CT
Start: Mon 10/25/2021 1:00 PM
End: Mon 10/25/2021 1:30 PM
Recurrence: (none)
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: JUAN
Phone#: 951-358-9783
Cell#:
Co. Name: FSS
%al 0000L. VVCJ I vvr%rxu
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
15