Loading...
27227 OLD MINE CIRCLE FIRE21-1607 WESTWARDJohnathan Baker Subject: FIRE21-1607 TR31098 SPK FINAL LOT 197 Location: 27227 OLD MINE CIRCLE Start: Fri 2/25/2022 9:30 AM End: Fri 2/25/2022 10:00 AM Recurrence: (none) Meeting Status: Meeting organizer Organizer: Johnathan Baker Call Handling Mode 2: 2 Rep. Name: OMAR Phone#: 909-213-7329 Cell#: Co. Name: FSS urossbt: WESTWARD HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block re -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. I Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rou h D96r fan test Underground hydro J #bort test Flush Qechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping / UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test / Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dis ensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING / MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off / High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 11 Johnathan Baker Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2 Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-1607 TR31098 O/H ROUGH/HYDRO LOT 197 27227 OLD MINE CIRCLE Wed 11/24/2021 2:30 PM Wed 11/24/2021 3:00 PM (none) Johnathan Baker 2 Cell#: Co. Name: FSS VI VJAJL. vv CJ I vvrAr[LJ HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Buildinq Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time. 27