Loading...
27226 OLD MINE CIRCLE FIRE21-1606 WESTWARDJohnathan Baker Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: OMAR Phone#: 909-213-7329 FIRE21-1606 TR31098 SPK FINAL LOT 188 27226 OLD MINE CIRCLE Fri 2/25/2022 10:00 AM Fri 2/25/2022 10:30 AM (none) Meeting organizer Johnathan Baker 2 Cell#: Co. Name: FSS UrOSSJI: VVt6 I VVAKU HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour / SPECIAL SUPPRESSION Underground rough Dbor fan test Underground hydro .Abort test Flush \ /i Mechanical shutdown Final �_ Detector test FIRE SPRINKLER J Deluge/pre-action Weld inspection ` Final Overhead rough piping UST/AST TANK Overhead hydro / Installation UG flush / OK to connect / Removal Main drain/Inspect. Test / Emergency shut off High pile storage / Primary piping In -rack sprinklers \. Secondary piping Hose racks Dispensers & shear valves Final ,L Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 21 Johnathan Baker Subject: FIRE21-1606 TR31098 O/H ROUGH/HYDRO LOT 188 Location: 27226 OLD MINE CIRCLE Start: Wed 11/24/2021 2:00 PM End: Wed 11/24/2021 2:30 PM Recurrence: (none) Organizer: Johnathan Baker Call Handling Mode 2: 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name: FSS CrossSt: WESTWARD HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test i Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 21