27224 ENDION CT FIRE21-1602 WESTWARDJohnathan Baker
Subject: FIRE21-1602 TR31098 SPK FINAL LOT 176
Location: 27224 ENDION CT
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: OMAR
Phone#: 909-213-7329
Fri 2/25/2022 9:30 AM
Fri 2/25/2022 10:00 AM
(none)
Meeting organizer
Johnathan Baker
2
Cell#:
Co. Name: FSS
Urossbt: VVEb I WAKU
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test'
Flush
,
Mdchafiical shutdown
Final
`
-DeVctor test
FIRE SPRINKLER
\ \
[Au e/pre-action
Weld inspection
\
final
Overhead rough piping
/
UST/AST TANK
Overhead hydro
/
\ U
Installation
UG flush / OK to connect
/
/
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
\
/
Primary piping
In -rack sprinklers
r /
Secondary piping
Hose racks
Dispensers & shear valves
Final
/
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
/
Spray booths
Function Test
/
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
15
Johnathan Baker
Subject: FIRE21-1602 TR31098 O/H ROUGH/HYDRO LOT 176
Location: 27224 ENDION CT
Start: Wed 11/24/2021 1:00 PM
End: Wed 11/24/2021 1:30 PM
Recurrence: (none)
Organizer: Johnathan Baker
Call Handling Mode 2: 2
Rep. Name: JUAN
Phone#: 951-358-9783
Cell#:
Co. Name: FSS
CrossSt: WESTWARD
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
I Finish Time:
13