27217 OLD MINE CIRCLE FIRE21-1608 WESTWARDJohnathan Baker
Subject: FIRE21-1608 TR31098 SPK FINAL LOT 198
Location: 27217 OLD MINE CIRCLE
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: OMAR
Phone#: 909-213-7329
Fri 2/25/2022 10:00 AM
Fri 2/25/2022 10:30 AM
(none)
Meeting organizer
Johnathan Baker
2
Cell#:
Co. Name
FSS
CrossSt: WESTWARD
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door f;Rh test
Underground hydro
Aborftest
Flush
/Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
\
i
Final
Overhead rough piping
\ \
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
/•/
/
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondant pipin
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
%
MISC. INSPECTION
Detection system
/
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
/
High pile rack storage
Nozzle model/placement
/,
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
19
Johnathan Baker
Subject:
FIRE21-1608 TR31098 O/H ROUGH/HYDRO LOT 198
Location:
27217 OLD MINE CIRCLE
Start:
Wed 11/24/2021 2:30 PM
End:
Wed 11/24/2021 3:00 PM
Recurrence:
(none)
Organizer:
Johnathan Baker
Call Handling Mode 2:
2
Rep. Name: JUAN
Phone#: 951-358-9783
Cell#:
Co. Name: FSS
%i[UbbOL. VVL:O I VV/i1RLJ
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rou h-wire inspection
Underground rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
jL
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In-racksprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
25