Loading...
27215 ENDION CT FIRE21-1604 WESTWARDJohnathan Baker Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: OMAR Phone#: 909-213-7329 FIRE21-1604 TR31098 SPK FINAL LOT 186 27215 ENDION CT Fri 2/25/2022 10:00 AM Fri 2/25/2022 10:30 AM (none) Meeting organizer Johnathan Baker 4 Cell#: Co. Name FSS k_AU550l: VVCJ I VVFMMLJ HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkle(r monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro /Abort test Flush \ \ Mechanical shutdown Final \ \ / Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping \ / UST/AST TANK Overhead hydro i Installation UG flush / OK to connect / / Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks JDispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off V High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 25 Johnathan Baker Subject: FIRE21-1604 TR31098 O/H ROUGH/HYDRO LOT 186 Location: 27215 ENDION CT Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Wed 11/24/2021 1:30 PM Wed 11/24/2021 2:00 PM (none) Johnathan Baker 2 Cell#: Co. Name: FSS UrU550l: VVCJ 1 VV/AMU HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping I><UST/AST TANK X Overhead hydro f` Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 17