27175 ENDION CT FIRE21-1150 WESTWARDJohnathan Baker
Subject:
Location:
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phone#: 951-847-2908
FIRE21-1150 TR31098 SPK FINAL LOT 214
27175 ENDION CT
Wed 1/19/2022 11:30 AM
Wed 1/19/2022 12:00 PM
(none)
Meeting organizer
Johnathan Baker
If
Cell#:
Co. Name
FSS
UFUSSJL: VVCJ 1 vvt-xmU
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSJON
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Vechapfical shutdown
Final
,
aetegfor test:
FIRE SPRINKLER
DdtG a/pre=action
Weld inspection
Einal
Overhead rough piping
UST/AST TANK
Overhead hydro
k1stallation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
\
i
Emergency shut off
High pile storage
Primary piping
In-racksprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
/
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
19
(liana Gutierrez
Subject: FIRE21-1150 TR31098 O/H ROUGH/HYDRO LOT 214
Location: 27175 ENDION CT
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2
Rep. Name: HECTOR
Phone#: 951-847-2908
Wed 10/13/2021 1:00 PM
Wed 10/13/2021 1:30 PM
(none)
Menifee OFM
2
Cell#:
Co. Name:
FSS
%a[U55.7t. VVCJ I VV/AMU
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
' ::'
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
29