Loading...
27120 LASSO WAY FIRE21-1396 TRAILHEADJohnathan Baker Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-1396 TR31098 SPK FINAL LOT 50 27120 LASSO WAY Fri 2/18/2022 8:30 AM Fri 2/18/2022 9:00 AM (none) Meeting organizer Johnathan Baker 2 Cell#: Co. Name: FSS UrU550l: I MAILMLAU HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Poor fan test Underground hydro Abort test Flush MbchaDrcal shutdown Final �peteofor test FIRE SPRINKLER 1. Delir a/pre-action Weld inspection Yinal Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test i Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final / Final KITCHEN HOOD EXTINGUISHING / MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Johnathan Baker Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-1396 TR31098 O/H ROUGH/HYDRO LOT 50 27120 LASSO WAY Tue 11/2/2021 1:30 PM Tue 11/2/2021 2:00 PM (none) Johnathan Baker 2 Cell#: Co. Name: FSS CrossSt: TRAILHEAD HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block re -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocit Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro ,yam Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: I I Finish Time: 37