27105 LASSO WAY FIRE21-1399 TRAILHEADJohnathan Baker
Subject:
Location:
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
FIRE21-1399 TR31098 SPK FINAL LOT 61
27105 LASSO WAY
Fri 2/18/2022 9:00 AM
Fri 2/18/2022 9:30 AM
(none)
Meeting organizer
Johnathan Baker
2
Cell#:
Co. Name:
FSS
UrOSSJt: I KAILHtAU
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
A460-test
Flush
,�
.1Aeohanical shutdown
Final
06tector test
FIRE SPRINKLER
/Delu a/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
/• \
Removal
Main drain/Inspect. Test
/ /
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping_
Hose racks
`'
Dispensers & shear valves
Final
x/
Final
KITCHEN HOOD EXTINGUISHING
/
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
15
Johnathan Baker
Subject: FIRE21-1399 TR31098 O/H ROUGH/HYDRO LOT 61
Location: 27105 LASSO WAY
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name; JUAN
Phone#: 951-358-9783
Tue 11/2/2021 2:30 PM
Tue 11/2/2021 3:00 PM
(none)
Johnathan Baker
2
Cell#:
Co. Name: FSS
CrossSt: TRAILHEAD
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondwy piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
BuildingKnox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
47