Loading...
27105 LASSO WAY FIRE21-1399 TRAILHEADJohnathan Baker Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-1399 TR31098 SPK FINAL LOT 61 27105 LASSO WAY Fri 2/18/2022 9:00 AM Fri 2/18/2022 9:30 AM (none) Meeting organizer Johnathan Baker 2 Cell#: Co. Name: FSS UrOSSJt: I KAILHtAU HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro A460-test Flush ,� .1Aeohanical shutdown Final 06tector test FIRE SPRINKLER /Delu a/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect /• \ Removal Main drain/Inspect. Test / / Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping_ Hose racks `' Dispensers & shear valves Final x/ Final KITCHEN HOOD EXTINGUISHING / MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 15 Johnathan Baker Subject: FIRE21-1399 TR31098 O/H ROUGH/HYDRO LOT 61 Location: 27105 LASSO WAY Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name; JUAN Phone#: 951-358-9783 Tue 11/2/2021 2:30 PM Tue 11/2/2021 3:00 PM (none) Johnathan Baker 2 Cell#: Co. Name: FSS CrossSt: TRAILHEAD HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondwy piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation BuildingKnox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 47