Loading...
27096 LASSO WAY FIRE21-1393 TRAILHEADJohnathan Baker Subject: FIRE21-1393 TR31098 SPK FINAL LOT 47 Location: 27096 LASSO WAY Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Fri 2/18/2022 8:00 AM Fri 2/18/2022 8:30 AM (none) Meeting organizer lohnathan Baker 2 Cell#: Co. Name: FSS Aff*T*T*� i ttttt■ I U-0 IN; I ad1 a; HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro %bort t I Flush Machardcal shutdown Final Dete or test FIRE SPRINKLER DQfG e/ re -action Weld inspection \ 1 coal Overhead rough piping UST/AST TANK Overhead hydro / Installation UG flush / OK to connect i \ Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In-racksprinklers 4 Secondary piping Hose racks Dispensers & shear valves X Final >G Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem 7 Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS FT Extinguishing system T/I final Fire alarm connection Shell final Johnathan Baker Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-1393 TR31098 O/H ROUGH/HYDRO LOT 47 27096 LASSO WAY Tue 11/2/2021 1:00 PM Tue 11/2/2021 1:30 PM (none) Johnathan Baker 2 Cell#: Co. Name: FSS \oIUJJJL. I rwILnCr%U HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Under round hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: I Finish Time: 35