2022-05-18 City Council Item No. 10.6 Fiscal Year 2022/2023 Senate Bill 1 List of Projects Presentation Regular MEETING - Additional Meeting MaterialsConsent Item 10.6 Fiscal Year 2022/23 Senate Bill 1 List of Projects Nick Fidler Public Works Director May 18, 2022 •Senate Bill 1, Road Repair and Accountability Act of 2017 Funded through: •Fuel excise Tax •Sales Tax •Vehicle Registration fees •Annually, apportionments of funding are given to eligible cities and counties for: •Road Maintenance •Rehabilitation •Critical safety Projects Background •Prior to receipt of funds, Cities must adopt a list (via resolution) of proposed project list prior to July 1st . •List must include: •Project description •Location •Proposed schedule •Estimated useful life SB1 Requirements FY 2022-23 SB1 Proposed Projects Casablanca Neighborhood Resurfacing Willows Neighborhood Murrieta Road Resurfacing This project proposes to grind and overlay with Asphalt Rubber Hot Mix (ARHM) 1.5 inches of existing asphalt in one portion of the project area and a rubberized emulsion-aggregate slurry (REAS) on the remaining streets of the project area. Additionally, the project proposes to upgrade existing curb ramps to current standards, and restriping to match existing road. Construction will begin on April 2023 and be completed by June 2023. This project will have a useful life of 15 years for areas receiving ARHM overlay, and 7 years for areas receiving a REAS seal. Proposed Project ListCasablanca Neighborhood Resurfacing Willows Neighborhood This project proposes to grind and overlay with Asphalt Rubber Hot Mix (ARHM 1.5 inches of existing asphalt. Additionally, the project will upgrade existing curb ramps to current standards and restripe the roadway. Construction will begin on March 2023 and be completed by June 2023. This project will have a useful life of 15 years. Murrieta Road Resurfacing This project proposes to reconstruct the entire roadway surface through Cold-in-Place Recycling (CIR) method which will grind up to 6” of the existing asphalt pavement and mix it with additives to rejuvenate the existing asphalt. The rejuvenated asphalt will serve as the base course. Additionally, the project will upgrade existing curb ramps to current standards and restripe to match the existing roadway. Construction will begin on September 2022 and be completed by November 2022. This project will have a useful life of 20 years. Questions? 66