Loading...
2021-05-05 City Council Item No. 4.1 Capital Improvement Program Workshop #2 Presentation Special MEETING - Additional Meeting MaterialsFY 21-22 Capital Improvement Program Workshop #2 May 5, 2021 Workshop #1 Overview •Capital Improvement Program (CIP) Overview •Considerations / Priorities / Funding Source •Completed FY 20/21 Projects •In Progress FY 20/21 Projects •Proposed FY 21/22 Projects •Discussion on suggested projects & review of priorities from Council 2 Workshop #2 Overview •Brief overview of In Progress FY 20/21 Projects & Proposed FY 21/22 Projects •Review each CIP section with suggested projects proposed by City Council during Workshop #1 •Discussion & review of priorities from City Council for project consensus •After workshop –staff will confirm available funding for prioritized projects and provide recommendations during Budget Workshop 3 Discussion •Goals of the CIP •Plan for the City’s long-term capital improvement. •Determine financing requirements. •Provides means for the City Council to determine priorities & continuity in carrying them out. •Identify projects for future years in the program that might be allocated funding in a future capital budgets. 4 In Progress Summary FY20-21 35 Projects in Progress 10 Projects currently under construction & 2 Studies. •6 Street Improvement Projects •1 Drainage Project •3 Community Services Department Projects •2 Report Studies (PMP update and MDP) 23 Projects under design. •6 Transportation Projects •4 Traffic Signal Projects •3 Street Improvement Projects •2 Facilities Projects •8 Community Services Department Projects 5 PROPOSED FY 21-22 CIP PROJECTS Project Category Priority Project Name Proposed FY 20-21 Estimated Total Cost Transportation 1 *Holland Road Overpass $10,415,368 $30,685,177 Transportation 1 *Bradley Bridge over Salt Creek $1,439,665 $14,489,512 Transportation 1 *Scott Road/Bundy Canyon Road Widening $2,978,640 $30,541,178 Transportation 1 *Valley Boulevard Widening and Missing Link $1,300,000 $7,700,000 Transportation 1 *McCall Boulevard Widening (Oakhurst Ave. to Menifee Road)$2,517,000 $3,444,000 Transportation 1 *Bailey Road Improvements $2,057,000 $2,230,000 Traffic Signal 1 Menifee Road and Garbani Road Traffic Signal $1,140,000 $1,433,690 Pavement 1 PMP: Tradewinds Community (Romoland)$1,179,663 Pavement 1 Menifee Rd Resurfacing-Holland Rd to Newport Road $1,500,000 St. Improvement 1 Normandy Road Pedestrian Improvements $410,000 St. Improvement 1 *HSIP -Menifee Road (Hwy 74 to North City Limits)$100,000 $550,000 Facilities 1 Purchase of Police Headquarters $4,950,000 Facilites 2 Police Station Upgrades -Wall, Carports, Lighting $250,000 Faciites 3 Police Station Parking Lot Upgrades -Resurfacing $390,000 Facilities 1 Fuel Station $750,000 Facilities 2 Council Chambers Window Upgrades $200,000 Facilities 1 Park & Facility Multi Use Trailers $500,000 C.S.2 Park Amenity Enhancements $50,000 C.S.2 Sports Court Resurfacing $80,000 C.S.1 Parking Lot Resurfacing $50,000 C.S.2 Park Lighting $150,000 C.S.2 Shade Structures $45,000 Fleet 1 PW Equipment & Vehicles $432,000 $32,844,329 6*Contribution towards total project cost Capital Projects: Priorities •Priority levels are assigned to projects within each CIP. •Projects are ranked in accordance with requirements of the City Council. •Process for ranking reviewed annually & priorities may be adjusted. •Priority Levels are intended to guide City Council & City Manager in CIP discussions. •Factors considered: -Risk to health,safety &environment.-Existing infrastructure condition. -Legal requirements or mandates.-Funding availability &grants. -City Council priorities &requests.-Project readiness. -Master plans. 7 Capital Projects: Priorities PRIORITY 1:Urgent & must be completed ASAP. Failure to address impacts health, safety, or welfare of the community or has a potential significant impact on the financial wellbeing of the City. The project must be initiated, or financial opportunity losses may result. PRIORITY 2:Important and addressing it is necessary. The project impacts safety, law enforcement, health, welfare, economic base, and quality of life. PRIORITY 3:Enhances quality of life & will provide a benefit to the community such as cultural, recreational, and/or aesthetic value, or is deemed as a necessary improvement to a public facility. PRIORITY 4:Improvement to the community, but does not necessarily need to be completed within a five-year capital improvement program time frame. 8 Suggested Project Proposals from CIP Workshop #1 *Suggested Transportation Projects Project Description Proposed Status Originator Study Areas for Round-About Intersections Review possibility with new and proposed intersections. LS Holland & Murrieta Intersection Re-alignment Project identified in CIP. LS Briggs Road -Improvement projects for area due to Liberty High School. Project identified in CIP. LS Paving of Briggs Road near Liberty High School Project identified in CIP. ML Infrastructure Study for Romoland Area Project identified in CIP. ML 10 *Pending City Council Consensus Transportation Projects 11 *Suggested Traffic Signal Projects Project Description Proposed Status Originator Review need for McCall / Gross Pointe After additional traffic engineering review of mitigation measures implemented since 2016 & updated accident data, propose for future CIP BK MSJC Main Entrance / Antelope RD Project identified in CIP. BZ Briggs Road / Garbani Project identified in CIP. ML 12 *Pending City Council Consensus Traffic Signal Projects 13 $600,000 available unallocated from McCall Rd/Grosse Pointe *Suggested Street Improvement Projects Project Description Proposed Status Originator Review Citywide Neighborhood Paving Projects / Needs A new pavement management study is underway plan to present to City Council by Fall 2021.LS Study Traffic Newport Road – Antelope to Briggs Project identified in CIP. LS 14 *Pending City Council Consensus Street Improvement Projects 15 *Suggested Pavement Management Projects Project Description Proposed Status Originator Raised Median Menifee Rd North of Newport Added to scope for Menifee Road Resurfacing Project Proposed for FY 21-22 DD Peacock Community Resurfacing (Project in Design FY20-21) Recommend final funding for project from available CDBG Funds for FY 21-22 Staff Neighborhood East of Bradley From Potomoc to El Rancho (Sun City) Project identified in CIP. BK Lake Ridge Estates (Menifee Lakes)Project identified in CIP. LS Willows Neighborhood (Menifee Lakes)Project identified in CIP. LS Menifee Road Simpson to train tracks Project identified in CIP. DD 16 *Pending City Council Consensus Pavement Management Projects 17 *Suggested Drainage Projects Project Description Proposed Status Originator Ethanac & Byers Drainage Project identified in CIP. BK 18 *Pending City Council Consensus Drainage Projects 19 *Suggested New Street Lighting Projects Project Description Proposed Status Originator Street Light Program for Rural Areas Projects identified in CIP. BZ 20 *Pending City Council Consensus Street Lighting Projects 21 *Suggested Public Facilities Projects Project Description Proposed Status Originator Additional Fuel Stations First fuel station proposed for FY 21-22 and noted to explore additional stations in future CIP.DD Old Fire Station #5 Renovation for future use Project identified for future CIP after new fire station is completed. ML 22 *Pending City Council Consensus Public Facilities Projects 23 *Suggested Community Services Projects Project Description Proposed Status Originator Evans Regional Multi-Use Park Pump Track underway on 6 acres south of Craig Ave. Remaining 20 acres identified for future CIP. LS Salt Creek Trail Parking near Antelope Road Project identified in CIP. DD Salt Creek Trail Parking near Normandy Road Project identified in CIP. BK 24 *Pending City Council Consensus Community Services Projects 25 Questions? FY 20/21 Projects in Progress CIP Projects –Under Design Projects in BLUE received funding in FY20-21 Project Category Project Number Project Name Anticipated Construction Start Transportation CIP 13-03 Holland Road Overpass Apr-22 Transportation CIP 13-04 Bradley Bridge over Salt Creek TBD Transportation CIP 14-01 McCall Blvd/I-215 Interchange TBD Transportation CIP 20-01 Scott Road/Bundy Canyon Road Widening TBD Transportation CIP 20-05 Garbani Rd/I-215 Interchange TBD Transportation CIP 20-13 Paloma Wash Pedestrain Bridge TBD St. Improvement CIP 21-02 Haun Road Bus Shelter May-21 St. Improvement CIP 21-16 Rancho LaVita Resurfacing Aug-21 St. Improvement CIP 21-17 Peacock Community Resurfacing Aug-21 Traffic Signal CIP 21-07 Menifee Road / La Piedra Road Traffic Signal Aug-21 Traffic Signal CIP 21-09 Murrieta Road/Sun City Blvd Traffic Signal Aug-21 Traffic Signal CIP 21-10 Murrieta Road / Rouse Road Traffic Signal Aug-21 Traffic Signal CIP 21-11 Menifee Road / Garbani Road Traffic Signal Sep-21 Facilities CIP 21-03 Fire Station #68 Interior Improvements Aug-21 Facilities CIP 21-04 New Quail Valley Fire Station #5 Dec-21 C.S.CIP 17-01 Evans Park Design & Construction (Phase 1 -Pump Track) C.S.CIP 19-15 Central Park Amphitheatre C.S.CS007 Park Amenity Enhancements C.S.CS009 Irrigation Upgrades and Control Systems C.S.CS022 IT Network Upgrades C.S.CS030 Central Park Amenities C.S.CS032 Lyle Marsh Permanent Restroom C.S.CS032 Evans Park Permanent Restroom 28 CIP Projects Bidding /Under Construction Projects in BLUE received funding in FY20-21 Project Category Project Number Project Name Anticipated Construction End Master Drainage Plan (MDP)Apr-21 Pavement Management Program (PMP) Update May-21 St. Improvement CIP 19-03 Antelope Road Safety Medians –HSIP 9 Jul-21 St. Improvement CIP 20-04 Paloma Wash Trail Improvements Sep-21 St. Improvement CIP 20-12 Adams Street Improvements from 3rd street to Watson Road Apr-21 St. Improvement CIP 20-10 Leon Rd and Road Rd Intersection Improvements (County)Oct-21 St. Improvement CIP 21-13 McCall Boulevard AC Resurfacing (Encanto Dr to Antelope Rd)Aug-21 St. Improvement CIP 21-15 Premiere and Menifee Lakes resurfacing Jul-21 Drainage CIP 21-14 Ashdale Way Drainage Improvements May-21 C.S.CIP 19-16 Lazy Creek Campus Improvements Oct-21 29 FY 21/22 Proposed Projects PROPOSED FY 21-22 CIP PROJECTS Project Category Project Number Project Name Amount Requested Transportation CIP 13-03 Holland Road Overpass $10,015,368 Transportation CIP 13-04 Bradley Bridge over Salt Creek $1,439,665 Transportation CIP 20-01 Scott Road/Bundy Canyon Road Widening $2,978,640 Transportation CIP 22-02 Valley Boulevard Widening and Missing Link $1,300,000 Transportation CIP 22-03 McCall Boulevard Widening (Oakhurst Ave. to Menifee Road)$2,517,000 Transportation CIP 22-04 Bailey Road Improvements $2,057,000 Traffic Signal CIP 21-11 Menifee Road and Garbani Road Traffic Signal $1,140,000 Traffic Signal PW-TS-01 McCall Blvd. and Grosse Pointe Traffic Signal $600,000 St. Improvement PMP PMP: Tradewinds Community (romoland)$969,663 St. Improvement CIP 22-06 Menifee Rd Resurfacing-Holland Rd to Newport Road $1,500,000 St. Improvement PW-IMP-01 Normandy Road Pedestrian Improvements $410,000 St. Improvement PW-IMP-02 HSIP -Menifee Road (Hwy 74 to North City Limits)$100,000 Facilities Purchase of Police Headquarters $4,950,000 Facilites Police Station Upgrades -Wall, Carports, Lighting $250,000 Faciites Police Station Parking Lot Upgrades -Resurfacing $390,000 Facilities New Financial Software $1,125,000 Facilities Fuel Station $750,000 Facilities Council Chambers Window Upgrades $200,000 C.S.Park & Facility Multi Use Trailers $750,000 C.S.CS007 Park Amenity Enhancements $50,000 C.S.CS042 Sports Court Resurfacing $80,000 C.S.CS021 Parking Lot Resurfacing $50,000 C.S.CS014 Park Lighting $150,000 C.S.CS047 Shade Structures $45,000 Fleet PW Equipment & Vehicles $432,000 24 Projects $34,249,336 31 CIP 13-03 HOLLAND ROAD/ I-215 OVERPASS 1 Transportation Engineering Apr-22 18 months 2,3 Design 1,538,190$ 1,277,361$ Environmental 800,000$ 780,000$ Right of Way 3,110,000$ 2,652,381$ Construction Management 2,940,000$ -$ Construction 22,296,987$ -$ Total Project Costs 30,685,177$ 4,709,742$ Estimated Maintenance Cost: Proposed Fund #2021-22 2022-23 2023-24 2024-25 2025-26 Future Years 100 -$ 2,000,000$ -$ -$ -$ -$ -$ 2,000,000$ 105 2,167,663$ -$ -$ -$ -$ -$ -$ 2,167,663$ 310 552,000$ 5,903,000$ -$ -$ -$ -$ -$ 6,455,000$ 320 4,573,449$ 112,368$ -$ -$ -$ -$ -$ 4,685,817$ 415 8,905,011$ 1,000,000$ -$ -$ -$ -$ -$ 9,905,011$ 509 2,055,744$ 1,000,000$ -$ -$ -$ -$ -$ 3,055,744$ 510 241,797$ -$ -$ -$ -$ -$ -$ 241,797$ 526 1,723,638$ -$ -$ -$ -$ -$ -$ 1,723,638$ 527 485,941$ -$ -$ -$ -$ -$ -$ 485,941$ 20,705,243$ 10,015,368$ -$ -$ -$ -$ -$ 30,720,611$ Target Construction Start: Construction Duration: Priority: Category: Department: Project Description, Purpose, and Need: PROJECT BUDGET DETAILS TOTALFuture Funding EstimatesApproved Funding to date TOTALS General Fund DIF Citywide - Storm Drain Facilities DIF Citywide - Circulation DIF 17 - Signals DIF 17 - Roads Menifee Valley RBBD Capital Projects TUMF Measure DD Fund Name Council District (s): 2022 Target Year Estimates Project Cost by Phase Project Map Fund Source Expenditures to-date The project is located on Holland Road between Haun Road and Hanover Road. The project will construct a four lane bridge over the I-215 which will include dedicated bike lanes, sidewalks, traffic signals at Haun Rd. and Hannover Rd., lighting, signing and striping. The project is needed due to the increase in residential and commercial development on both sides of the I-215 which creates traffic congestion at the existing Newport Road and Scott Road interchanges. In addition, the project will create a much needed east-west connection for motorists and pedestrians. Street maintenance over a 5 year period will consist of a Slurry seal treatment at year 5 and 10, and AC overlay at year 15. Maintenance cost over a 15 year period is estimated to be $860,000. Street Maintenance is typically funded by Gas Tax, Measure A, Measure DD, and SB1 funds.https://cityofmenifee.maps.arcgis.com/apps/Shortlist/index.html?appid=8604e81f1bb14fd3bda909f8ca27a5ea ROW acquisition/Final DesignStatus: 39 CIP 13-04 Bradley Bridge over Salt Creek 1 Transportation Engineering Jul-23 12 months 1,2 Design 529,512$ 512,596$ Environmental 300,000$ 280,000$ Right of Way -$ Construction Management 1,460,000$ Construction 12,200,000$ Total Project Costs 14,489,512$ 792,596$ Estimated Maintenance Cost: Funding to date Proposed Fund #Fund Name 2021-22 2022-23 2023-24 2024-25 2025-26 Future Years 105 500,000$ -$ 2,200,000$ -$ -$ -$ -$ 2,700,000$ 220 558,721$ -$ 891,297$ -$ -$ -$ -$ 1,450,018$ 509 292,256$ 420,713$ -$ -$ -$ -$ -$ 712,969$ 520 -$ -$ 278,222$ -$ -$ -$ -$ 278,222$ 526 194,349$ 700,000$ 2,200,000$ -$ -$ -$ -$ 3,094,349$ 527 -$ 318,952$ 368,660$ -$ -$ -$ -$ 687,612$ -$ -$ 2,000,000$ -$ -$ -$ -$ 2,000,000$ -$ -$ 3,245$ -$ -$ -$ -$ 3,245$ -$ -$ -$ -$ -$ -$ 3,563,097$ 3,563,097$ 1,545,326$ 1,439,665$ 7,941,424$ -$ -$ -$ 3,563,097$ 14,489,512$ TOTALS Project Description, Purpose, and Need: The project is located on Bradley Road between Rio Vista Drive and Potomac Street. The project will construct a bridge over the Salt Creek Channel with capacity for four lanes replacing the existing at grade two-lane road. The project will also construct sidewalks, relocate utilities, and improve drainage. Due to the existing at grade crossing, Bradley road experiences frequent flooding and closures which affect the north-west connection and also affects emergency response time. The proposed bridge will provide a year-round crossing and improve mobility to motorists and pedestrians. Design, Resource Agency permits 2023 Target Year Estimates Expenditures to-date Project Map Construction Duration: Target Construction Start: Project Cost by Phase Department: Category: Priority: Council District (s): Project Status: DIF Citywide - Circulation Street maintenance over a 15 year period will consist of a Slurry seal treatment at years 5 and 10, and AC overlay at year 15. Maintenance cost over a 15 year period is estimated to be $380,000. PROJECT BUDGET DETAILS Fund Source Future Funding Estimates https://cityofmenifee.maps.arcgis.com/apps/Shortlist/index.html?appid=8604e81f1bb14fd3bda909f8ca27a5ea Street Maintenance is typically funded by Gas Tax, Measure A, Measure DD, and SB1 funds. DIF Citywide - Public Use & Comm. Fac. DIF 17 - Roads Measure A Measure DD UNFUNDED Developer Deposits Other: Riverside County Flood Control DIF Citywide - Storm Drain Facilities TOTAL 40 CIP 20-01 Scott Road/Bundy Canyon Road 1 Transportation Engineering TBD 14 months 2 Design 2,472,940$ 1,512,883$ Environmental 300,000$ 150,000$ Right of Way 3,900,000$ Construction Management 2,656,125$ Construction 21,212,113$ Total Project Costs 30,541,178$ 1,662,883$ Estimated Maintenance Cost: Proposed Fund #2021-22 2022-23 2023-24 2024-25 2025-26 Future Years 105 -$ -$ -$ -$ -$ 3,230,000$ -$ 3,230,000$ 220 -$ -$ -$ -$ -$ 951,297$ -$ 951,297$ 310 2,370,000$ 2,809,000$ -$ -$ -$ 7,729,000$ -$ 12,908,000$ 320 -$ -$ -$ -$ -$ 2,500,000$ -$ 2,500,000$ 410 601,794$ 169,640$ -$ -$ -$ 624,926$ -$ 1,396,360$ 527 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 9,555,521$ 9,555,521$ 2,971,794$ 2,978,640$ -$ -$ -$ 15,035,223$ 9,555,521$ 30,541,178$ 2,971,794$ 5,950,434$ 5,950,434$ 5,950,434$ 5,950,434$ 20,985,657$ 30,541,178$ Priority: Project Status: Construction Duration: Target Construction Start: Department: CUMULATIVE TOTALS Category: Project Cost by Phase TOTALS UNFUNDED Developer Deposits DIF Citywide - Storm Drain Facilities Scott Road RBBD Capital Projects TUMF Measure A Measure DD Fund Name Council District (s): PROJECT BUDGET DETAILS Fund Source Approved Funding to date Future Funding Estimates TOTAL Project Description, Purpose, and Need: Current Year Estimates Expenditures to-date Project Map Design and Environmental https://cityofmenifee.maps.arcgis.com/apps/Shortlist/index.html?appid=8604e81f1bb14fd3bda909f8ca27a5ea The project is located on Scott Road from Hun Road to Sunset Avenue (limit with City of Wildomar). The project will widen the existing two lane road to four lanes with an additional 14 foot wide median and 10 foot wide shoulders on both sides which will be used for buffered bike lanes. In addition, the project will construct and/or modify traffic signals along the project. 41 CIP 22-02 Valley Boulevard Widening 1 Transportation Engineering Jul-23 12 months 2 Design 520,000$ Environmental 90,000$ Right of Way 500,000$ Construction Management 590,000$ Construction 6,000,000$ Total Project Costs 7,700,000$ -$ Estimated Maintenance Cost: Proposed Fund #2021-22 2022-23 2023-24 2024-25 2025-26 Future Years 105 Measure DD -$ -$ -$ 1,000,000$ -$ 1,000,000$ 220 Measure A -$ -$ -$ 703,333$ -$ 703,333$ 415 Menifee Valley RBBD -$ -$ -$ 1,934,642$ -$ 1,934,642$ 526 DIF Citywide - Circulation -$ 1,300,000$ -$ 2,319,631$ -$ 3,619,631$ 527 DIF Citywide - Storm Drain Facilities -$ -$ -$ 442,394$ -$ 442,394$ UNFUNDED -$ -$ -$ -$ -$ -$ -$ 1,300,000$ -$ 6,400,000$ -$ 7,700,000$ Project Description, Purpose, and Need:Priority: Design Project Cost by Phase Project Status: Construction Duration Target Construction Start: The project will construct a 4-lane road and two uncompleted sections of Valley Boulevard between Murrieta Road and Chamabers Avenue. In addition, the project will also install Traffic Signals, street lighting, sidewalks, and ADA ramps. This project is needed to mitigate traffic congestion due to increasing development on the north side of the City and provide a necessary connection to Murrieta Road. Council District (s): Project Map https://cityofmenifee.maps.arcgis.com/apps/Shortlist/index.html?appid=8604e81f1bb14fd3bda909f8ca27a5ea Category: Current Year Estimates TOTALS Fund Name Department: PROJECT BUDGET DETAILS Fund Source Approved Funding to date Future Funding Estimates TOTAL Expenditures to-date 42 CIP 22-03 McCall Boulevard Widening 1 Transportation Engineering Aug-22 7 months 4 Design 340,000$ Environmental 100,000$ Right of Way 75,000$ Construction Management 306,000$ Construction 2,623,000$ Total Project Costs 3,444,000$ -$ Estimated Maintenance Cost: Proposed Fund #2021-22 2022-23 2023-24 2024-25 2025-26 Future Years 105 Measure DD -$ -$ 927,000$ 927,000$ 310 TUMF -$ 2,517,000$ -$ 2,517,000$ UNFUNDED -$ -$ -$ -$ -$ -$ -$ 2,517,000$ 927,000$ 3,444,000$ https://cityofmenifee.maps.arcgis.com/apps/Shortlist/index.html?appid=8604e81f1bb14fd3bda909f8ca27a5ea PROJECT BUDGET DETAILS Fund Source Approved Funding to date Future Funding Estimates TOTALFund Name Project Cost by Phase Project Map Current Year Estimates Expenditures to-date TOTALS Project Description, Purpose, and Need:Priority: The project is located on McCall Boulevard between Oakhurst Avenue (Hospital Entrance) and Menifee Road. The project will widen the existing two-lane road to four lanes including a 12' center median. The project will also relocate utilities, install sidewalks and ADA ramps, and modify two existing traffic signals. The project is needed in order to mitigate increase traffic through the area due to residential and commercial development . Category: Department: Target Construction Start: Construction Duration Project Status:Preliminary Engineering Council District (s): McCall Blvd.Menifee Rd.43 CIP 22-04 Bailey Park Boulevard Widening 1 Transportation Engineering Apr-22 4 months 2 Design 150,000$ Environmental 50,000$ Right of Way 150,000$ Construction Management 80,000$ Construction 1,800,000$ Total Project Costs 2,230,000$ -$ Estimated Maintenance Cost: Proposed Fund #2021-22 2022-23 2023-24 2024-25 2025-26 Future Years 105 Measure DD 450,000$ 113,583$ -$ -$ -$ -$ 563,583$ 220 Measure A 657,000$ -$ -$ -$ -$ -$ 657,000$ 320 Capital Projects 950,000$ -$ -$ -$ -$ -$ 950,000$ Developer Deposits -$ 59,417$ -$ -$ -$ -$ UNFUNDED -$ -$ -$ -$ -$ 0$ -$ 2,057,000$ 172,999.71$ -$ -$ -$ 0$ 2,230,000$ https://cityofmenifee.maps.arcgis.com/apps/Shortlist/index.html?appid=8604e81f1bb14fd3bda909f8ca27a5ea Fund Name TOTALS PROJECT BUDGET DETAILS Fund Source Approved Funding to date Future Funding Estimates TOTAL Priority: Category: Department: Project Description, Purpose, and Need: The project will construct approximately 1,400 linear feet of industrial collector road, curb and gutter, sidewalks, steet lighting, ADA ramps, street lighting and drainage inlets. The project will address road safety and traffic efficiency due to the lack of roads and illumination in the area. In addition, the project will promote economic development in this area of the City. Council District (s): Current Year Estimates Expenditures to-date Project Map Target Construction Start: Construction Duration Project Status:Preliminary Engineering Project Cost by Phase 44 CIP 21-11 Menifee Rd / Garbani Rd Traffic Signal Description: Re-align and widen existing intersection. Install new Traffic signal. Construct ADA ramps. District: 3 Estimated Cost: $1,433,690 Funding Source: General Fund, DIF Citywide Circulation PW-TS-01 McCall Blvd / Grosse Pointe Traffic Signal Description:Install new Traffic signal. Upgrade ADA ramps. District: 1 Estimated Cost: $600,000 Funding Source: DIF Citywide Circulation 38 PMP: Tradewinds Community Resurfacing Description: Resurface existing pavement. Install ADA ramps as allowed by ROW. District: 4 Estimated Cost: $969,663 Funding Source: Gas Tax, RMRA (SB1), Measure A CIP 22-06 Menifee Road Resurfacing (Holland Rd to Newport Rd) Description: Resurface existing pavement. Upgrade ADA ramps. Re-stripe for bicycle lanes, signage. District: 3 Estimated Cost: $1,500,000 Funding Source: RMRA (SB1 39 PW-IMP-01: Normandy Rd. Pedestrian Improvements Description: Widen existing road shoulder (North side) to accommodate multi-use trail. District: 1 Estimated Cost: $410,000 Funding Source: Measure DD, Measure A PW-IMP-13: HSIP –Menifee Road Description: Improve existing signal hardware, striping, signs, and intersection improvements as needed. District: 4 Estimated Cost: $100,000 Funding Source: Measure DD 40 Proposed Projects CS049 Fuel Station Description: Installation of an above ground fueling station at a TBD location. Installing an above ground fuel station and purchasing the fuel in bulk, would save an estimated cost of 50% a year. Right now, the City fleet spends an average of $300,000 annually on fuel, we could reduce that cost to $150,000 annually by purchasing in bulk. Our own fueling station would become a regional asset by allowing our emergency vehicles to get fuel in the case of a natural disaster where a regular gas station would be shut down. It will take an estimated 5 years to recoup the cost of the station. Location: TBD Estimated Cost: $750,000 Funding Source: General $150,000 annually in savings Regional Asset 5-year cost recovery 41 Proposed Projects CS050 Police Station Parking lot Description: Replace back gravel parking lot with permeable surface. Asphalt front dirt parking lot Location: Police Station Estimated Cost: $390,000 Funding Source: General CS051 Police Station Upgrades Description: Completion of the perimeter wall, carports for detectives, and additional security lighting in the parking lots Location: Police Station Estimated Cost: $250,000 Funding Source: General 42 Proposed Projects CS052 Park &Facility Multi-Use Building Description: Rehab the existing manufactures building behind Station 7 to create locker rooms for parks staff, Rangers as well as conference/training room and possibly sleeping quarters. Location: Station 7 Estimated Cost: $500,000 Funding Source: General CS053 Council Chambers Window Upgrades Description: Replace Council Chambers exterior windows with safety glass Location: City Hall Estimated Cost: $200,000 Funding Source: General 43 Proposed Projects CS042 Sports Court Resurfacing Description: Renovation of the sports courts, basketball and tennis courts as well as volleyball courts Location: Hidden Hills Park, John Denver Park Estimated Cost: $80,000 Funding Source: City Wide DIF, CSA 33 reserves CS047 Shade Structure Description: Free standing shade structures to cover existing playgrounds Location: John Denver Park Estimated Cost: $45,000 Funding Source: CSA 33 reserves CS007 Park Amenity Enhancements Description: Replace and install new park furnishings: picnic tables, park benches, trash and coal receptacles and dog bag dispensers. Location: Lazy Creek, Mayfield, Central Estimated Cost: $50,000 Funding Source: 620 Quimby 44 Proposed Projects CS021 Parking Lot Resurfacing Description: Slurry seal, curb/gutter and striping of existing parking lot Location: Lazy Creek Estimated Cost: $50,000 Funding Source: City Wide DIF CS014 Park Lighting Description: Replace or add new LED lighting at various parks Location: Evans Pump Track, Calle Tomas Estimated Cost: $150,000 Funding Source: City Wide DIF, 2015-2 Parks DIF 45 Fleet Services: Public Works Equipment & Vehicles Description: New or Replacement Equipment and Vehicles Estimated Cost: $415,000 Funding Source: Measure DD Funds REQUEST TYPE DESCRIPTION PURPOSE COST REPLACEMENT Asphalt Patch Truck (5 CUYD Capacity)•Assigned to Asphalt •Replace existing smaller Asphalt Patch Truck (2 CUYD Capacity) to increase staff’s pothole production capacity. •Vehicle will be auctioned off. $240,000 REPLACEMENT Skid-Steer Loader (75 HP)•Assigned to Asphalt and Concrete •Replace existing smaller (50 HP) Skid-Steer Loader (MY. 2015) •re-purpose to PARKS Dept $ 75,000 NEW Public Works Truck •Assigned to Street Maintenance •Used for lane striping, traffic legends and stencils $ 60,000 NEW Traffic Arrowboard Truck •Assigned to Traffic Control and Special Events •Will have dedicated traffic arrowboard and ability to carry traffic cones, delineators and barricades $ 40,000 46