2021-04-19 City Council Item No. 4.1 CIP Workshop Presentation Special MEETING - Additional Meeting MaterialsFY 21-22 Capital Improvement Program Workshop April 19, 2021 1 Workshop Overview 1 •Capital Improvement Program (CIP) Overview •Considerations / Priorities / Funding Source •Completed FY 20/21 Projects •In Progress FY 20/21 Projects •Proposed FY 21/22 Projects •Discussion on additional projects & review of priorities from Council Capital Project Considerations •CIP Projects: •Exceed $50,000 in cost. •Long-term life spans of 5+ years (Roads, traffic signals, parks, playgrounds, etc.). •Generally non-recurring project expense. •Projects evaluated by: •Economic feasibility, community enhancement, infrastructure needs, safety & community needs. •Funding &timing. •Fiscal impacts,including maintenance &operational costs. •Revenues:considers applicable funding sources,state of local economy,&historical trends for 5-year projections. 2 Discussion •Goals of the CIP •Plan for the City’s long-term capital improvement. •Determine financing requirements. •Provides means for the City Council to determine priorities & continuity in carrying them out. •Identify projects for future years in the program that might be allocated funding in a future capital budgets. 3 Discussion: CIP and the General Plan •General Plan designates land uses & corresponding building intensities, open space, public facilities and circulation networks. •CIP projects &corresponding budget must also be in conformance with the General Plan (California Government Code Section 65401). •Location •Purpose &necessity to facilitate implementation of General Plan •Orderly development patterns •Timely extension &provision of public facilities 4 Capital Projects: Priorities •Priority levels are assigned to projects within each CIP. •Projects are ranked in accordance with requirements of the City Council. •Process for ranking reviewed annually & priorities may be adjusted. •Priority Levels are intended to guide City Council & City Manager in CIP discussions. •Factors considered: -Risk to health,safety &environment.-Existing infrastructure condition. -Legal requirements or mandates.-Funding availability &grants. -City Council priorities &requests.-Project readiness. -Master plans. 5 Capital Projects: Priorities PRIORITY 1:Urgent & must be completed ASAP. Failure to address impacts health, safety, or welfare of the community or has a potential significant impact on the financial wellbeing of the City. The project must be initiated, or financial opportunity losses may result. PRIORITY 2:Important and addressing it is necessary. The project impacts safety, law enforcement, health, welfare, economic base, and quality of life. PRIORITY 3:Enhances quality of life & will provide a benefit to the community such as cultural, recreational, and/or aesthetic value, or is deemed as a necessary improvement to a public facility. PRIORITY 4:Improvement to the community, but does not necessarily need to be completed within a five-year capital improvement program time frame. 6 Funding Sources The City’s CIP Program is funded by a variety of sources, including the General Fund, Capital Project Fund,Gas Tax, Development Fees,Park Development Fees,and Grant funding and others.Of these funding sources,the General Fund and Gas Tax can be used on the widest array of projects. Other funding sources,such as Development Fees and Grant Funds,have specific,legally restricted uses. 7 Gas Tax Grant Funds DIF Funds Measure A TUMF Funds Measure DD SB 1 General Fund 8 $2,492,000 $8,452,733 $28,526,973 $43,421,254 $46,974,747 $1,905,861 $6,672,747 $11,488,387 $20,255,061 $6,713,254 $- $5,000,000 $10,000,000 $15,000,000 $20,000,000 $25,000,000 $30,000,000 $35,000,000 $40,000,000 $45,000,000 $50,000,000 FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Historical CIP Program Budgeted/Expenditures Total Budget Expenditures - 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000 12,000,000 14,000,000 16,000,000 18,000,000 Total 4 Year Average CIP Historical Revenue Sources By Top Revenue Source (FY2016/17 to FY20/21) The Grant Fund (Fund 301) represents one of the most variable Revenue Sources for CIP, affected by the number available grants (federal, state, local) and the City’s successful application process. 9 Fiscal Year 2021/22 Projected Revenues By Funding Source $11,585,958 $0 $2,000,000 $4,000,000 $6,000,000 $8,000,000 $10,000,000 $12,000,000 $14,000,000 Available For FY21/22 TUMF (Fund 310) is Projected Revenue Source to be the largest Revenue Source due to various successful reimbursement agreement executed or in process with WRCOG. FY 20/21 Completed Projects FY20-21 Project List •5 Transportation Projects. •4 Traffic Signal Projects •9 Street Improvement Projects •3 Facilities Projects •12 (twelve) Community Services Projects 11 Project Category Project Number Project Name FY 20-21 Allocation Status Transportation CIP 13-03 Holland Road Overpass $4,781,016 Design Transportation CIP 13-04 Bradley Road Bridge over Salt Creek $444,349 Design Transportation CIP 14-01 McCall Boulevard/I-215 Interchange $700,000 Design Transportation CIP 20-05 Garbani Road/ I-215 Interchange $662,189 Prel. Engineering Transportation CIP 20-13 Paloma Wash Pedestrian Bridge $1,266,273 Prel. Engineering Traffic Signal CIP 21-07 Menifee Road/La Piedra Road $500,000 Design Traffic Signal CIP 21-09 Murrieta Road/ Sun City Boulevard $700,000 Design Traffic Signal CIP 21-10 Murrieta Rd/Rouse Road $500,000 Design Traffic Signal CIP 21-11 Menifee Road/Garbani Road $300,000 Design St. Improvement PMP -Peacock Place, Rancho La Vita, Premiere Lakes $2,954,378 Design/Bidding St. Improvement CIP 20-04 Paloma Wash Trail Improvements $750,000 Bidding St. Improvement CIP 20-11 Scott Road and Menifee Road Sidewalk $266,737 Completed St. Improvement CIP 20-12 Adams Avenue Improvements -Phase 2 $448,953 Completed St. Improvement CIP 21-01 Murrieta Road -McCall Boulevard to Salt Creek $1,237,589 Completed St. Improvement CIP 21-02 Haun Road Bus Shelter $40,000 Design St. Improvement CIP 21-08 Leon Road and Scott Road Intersection Improv.$230,000 Under Construciton St. Improvement CIP 21-12 Hillpointe Community Street Resurfacing $976,443 Completed St. Improvement CIP 21-13 McCall Boulevard -Encanto Road to Antelope Road $1,217,192 Bidding Facilities CIP 21-03 Fire Station #68 -Interior Improvements $500,000 Design Facilities CIP 21-04 New Quail Valley Fire Station #5 -Design $5,770,000 Design Facilities CIP 21-05 New City Hall –Feasibility Study Update $200,000 Prel. Engineering C.S.CIP 19-15 Central Park Amphitheatre $2,573,729 Design C.S.CIP 19-16 Lazy Creek Campus Improvements $517,080 Under Construction C.S.CS007 Park Amenity Enhancements $113,000 On-going C.S.CS009 Irrigation Upgrades and Control Systems $25,000 Prel. Engineering C. S.CIP 17-01 Evans Park Design/Construction $350,000 Design C. S.CS014 Park Lighting $50,000 Completed C. S.CS015 Sports Field Lighting $250,000 Design C.S.CS022 IT Network Upgrades $75,000 Design C. S.CS023 Trails Connectivity and Enhancements $170,000 Completed C.S.CS030 Central Park Ammenities $900,000 Design C. S.CS042 Sports Court Resurfacing $100,000 Completed C. S.CS047 Shade Structures $320,000 Under Construction 33 Projects TOTAL $29,888,928 CIP Projects Completed in FY 20-21 Projects in BLUE received funding in FY20-21 12 Project Category Project Number Project Name Cost Transportation CIP 14-03 Scott Road/I-215 Interchange $14,280,000 Transportation Menifee Active Transportation Plan $286,110 St. Improvement CIP 20-02 Sherman Rd and Ethanac Rd Street Resurfacing $1,295,258 St. Improvement CIP 20-11 Scott Road/Menifee Road Missing Sidewalks $421,182 St. Improvement CIP 21-01 Murrieta Road Resurfacing (McCall to Salt Creek)$1,015,290 St. Improvement CIP 21-12 Hillpointe Community Street Resurfacing $626,012 Traffic Signal CIP 16-07 Traffic Signal Interconnect (West) HSIP 7 $560,668 Traffic Signal CIP 16-08 Traffic Signal Interconnect (East) HSIP 7 $551,914 Traffic Signal CIP 17-05 Citywide ADA improvements at Signalized Intersection –HSIP 8 $756,063 Traffic Signal CIP 19-06 Scott Road/Murrieta Road Traffic Signal $746,756 Traffic Signal CIP 20-06 Menifee/Holland Traffic Signal $474,800 Traffic Signal CIP 20-07 Menifee/Camino Cristal Traffic Signal $478,904 Facilities CIP 19-18 Menifee Police Headquarters -Security Wall $238,777 Facilities CIP 16-13 Menifee Operations Center (MOC)$309,290 C.S.CIP16-03 Trail Conectivity & Enhancement $84,641 C.S.CS014 Park Lighting $34,812 C.S.CS042 Sports Court Resurfacing $69,018 C.S.CS047 Shade Structures $302,867 C.S.CS015 Sports Field lighting $876,000 C.S.CS007 Park Amenity Enhancements $98,660 $23,507,022 CIP 14-03: Scott Road Interchange Status: •Project Completed: Sept. 2020. •Construction Cost: $42,014,000 (Estimated) •City Contribution: $14,280,000 •City Funding Sources: Measure DD ($4.2M), DIF, Scott Road RBBD, Capital Projects BEFORE AFTER 13 Active Transportation Plan Status: •Completed: Nov. 2020 •Budget: $292,630 •Cost: $286,110 •SB1 Grant funds (RMRA -SC): $244,147 https://www.cityofmenif ee.us/687/Menifee- Active-Transportation- Plan Bikeway ProjectsPedestrian Projects 14 CIP 20-02 Sherman/Ethanac/Mathews Resurfacing Status: •Completed: Sept. 2020 •Budget: $1,405,762 •Construction Cost: $1,295,258 •Scope: Asphalt reconstruction, Minor drainage improvements 15 CIP 20-11: Scott Road / Menifee Road Sidewalk Status: •Completed: Jan. 2021 •Budget: $531,920 •Construction Cost: $498,386 •Grant Funds: $183,263 (SB 821 Bicycle and Pedestrian Facilities Program) •Scope: Concrete Sidewalks, 5 ADA ramps, minor drainage improvements.16 CIP 21-01 Murrieta Road Resurfacing (McCall Boulevard to Salt Creek) Status: •Completed: Jan. 2021 •Budget: $1,398,780 •Construction Cost: $1,015,290 •Scope: Asphalt reconstruction, ADA ramps, striping 17 CIP 21-12 Hillpointe Community Resurfacing Status: •Completed: Feb. 2021 •Budget: $703,640 •Construction Cost: $653,232 •Scope: Asphalt overlay, ADA ramps 18 CIP 16-07 Traffic Signal Interconnect (West) Status: •Completed: Mar. 2020 •Construction Cost: $560,668 •HSIP 7 Grant: $496,700 •Scope: Install wireless communication equipment at 28 locations 19 CIP 16-08 Traffic Signal Interconnect (East) Status: •Completed: Dec. 2020 •Budget: $551,953 •Construction Cost: $551,914 •HSIP 7 Grant: $494,900 •Scope: Install wireless communication equipment at 34 locations 20 CIP 17-05 Citywide ADA Improvements Status: •Completed: Oct. 2020 •Budget: $843,160 •Construction Cost: $756,063 •HSIP 8 Grant: $725,419 •Scope: Install ADA pedestrian push buttons, countdown signal heads, ADA ramps, striping at 44 locations 21 CIP 19-06 Traffic Signal: Murrieta Rd / Scott Rd Status: •Completed: Jan. 2021 •Budget: $821,980 •Construction Cost: $795,980 •Scope: Road Widening, Install Traffic Signal, ADA ramps, striping 22 CIP 20-06 Traffic Signals: Menifee Rd / Holland Rd Status: •Completed: Dec. 2020 •Budget: $531,929 •Construction Cost: $470,800 •Scope: Install Traffic Signal, ADA ramps, striping. 23 CIP 20-07 Traffic Signals: Menifee Rd / Cam. Crystal Status: •Completed: Dec. 2020 •Budget: $531,929 •Construction Cost: $478,904 •Scope: Install Traffic Signal, ADA ramps, striping. 24 CIP 16-13 Maintenance & Operations Center –Phase 2 Status: •90% completed (erecting pre-fab structures) •Scope: Exterior Improvements, trash enclosure, landscape screening, equipment and material bays. •Construction end: April 2021 25 CIP 19-18 Menifee Police HQ. Security Wall Status: •Completed: Feb. 2021 •Budget: $263,627 •Construction Cost: $238,777 •Scope: Install 8’ high block wall, sliding gate. 26 CS007 Park Amenity Enhancements Status: •Project Completed: March 2021. •Construction Cost: $70,458.28 •City Contribution: $70,458.28 •City Funding Sources: Local Park Quimby Nova Park 27 CS007 Park Amenity Enhancements AMR Skate Park La Ladera , Lyle Marsh, John Denver & AMR Status: •Project Completed: October 2020. •Construction Cost: $41,673 •City Contribution: $41,673 •City Funding Sources: CFD Reserves, Local Quimby 28 CS014 Park Lighting Status: •Project Completed: April 2021. •Construction Cost: $33,326 •City Contribution: $33,326 •City Funding Sources: Park DIF Nova Park & Lyle Marsh Park 29 CS023 Trail Connectivity & Enhancements Status: •Project Completed: April 2021. Nova Park 30 CS023 Trail Connectivity & Enhancements Calle Tomas Status: •Project Completed: November 2020. •Construction Cost: $84,641 •City Contribution: $84,641 •City Funding Sources: Trails DIF 31 CS042 Sports Court Resurfacing Status: •Project Completed: November 2020. •Construction Cost: $69,018 •City Contribution: $69,018 •City Funding Sources: CFD Resrves Spirit Park & Audie Murphy Park 32 FY 20/21 Projects in Progress CIP Projects Bidding /Under Construction Projects in BLUE received funding in FY20-21 34 Project Category Project Number Project Name Anticipated Construction End Master Drainage Plan (MDP)Apr-21 Pavement Management Program (PMP) Update May-21 St. Improvement CIP 19-03 Antelope Road Safety Medians –HSIP 9 Jul-21 St. Improvement CIP 20-04 Paloma Wash Trail Improvements Sep-21 St. Improvement CIP 20-12 Adams Street Improvements from 3rd street to Watson Road Apr-21 St. Improvement CIP 20-10 Leon Rd and Road Rd Intersection Improvements (County)Oct-21 St. Improvement CIP 21-13 McCall Boulevard AC Resurfacing (Encanto Dr to Antelope Rd)Aug-21 St. Improvement CIP 21-15 Premiere and Menifee Lakes resurfacing Jul-21 Drainage CIP 21-14 Ashdale Way Drainage Improvements May-21 C.S.CIP 19-16 Lazy Creek Campus Improvements Oct-21 CIP Projects –Under Design Projects in BLUE received funding in FY20-21 35 Project Category Project Number Project Name Anticipated Construction Start Transportation CIP 13-03 Holland Road Overpass Apr-22 Transportation CIP 13-04 Bradley Bridge over Salt Creek TBD Transportation CIP 14-01 McCall Blvd/I-215 Interchange TBD Transportation CIP 20-01 Scott Road/Bundy Canyon Road Widening TBD Transportation CIP 20-05 Garbani Rd/I-215 Interchange TBD Transportation CIP 20-13 Paloma Wash Pedestrain Bridge TBD St. Improvement CIP 21-02 Haun Road Bus Shelter May-21 St. Improvement CIP 21-16 Rancho LaVita Resurfacing Aug-21 St. Improvement CIP 21-17 Peacock Community Resurfacing Aug-21 Traffic Signal CIP 21-07 Menifee Road / La Piedra Road Traffic Signal Aug-21 Traffic Signal CIP 21-09 Murrieta Road/Sun City Blvd Traffic Signal Aug-21 Traffic Signal CIP 21-10 Murrieta Road / Rouse Road Traffic Signal Aug-21 Traffic Signal CIP 21-11 Menifee Road / Garbani Road Traffic Signal Sep-21 Facilities CIP 21-03 Fire Station #68 Interior Improvements Aug-21 Facilities CIP 21-04 New Quail Valley Fire Station #5 Dec-21 C.S.CIP 17-01 Evans Park Design & Construction (Phase 1 -Pump Track) C.S.CIP 19-15 Central Park Amphitheatre C.S.CS007 Park Amenity Enhancements C.S.CS009 Irrigation Upgrades and Control Systems C.S.CS022 IT Network Upgrades C.S.CS030 Central Park Amenities C.S.CS032 Lyle Marsh Permanent Restroom C.S.CS032 Evans Park Permanent Restroom CIP Projects Summary FY20-21 17 projects completed in FY20-21 (to-date). •2 Transportation Projects •6 Traffic Signal Projects •4 Street Improvement Projects •2 Facilities Projects •3 Park and Recreation projects 12 Projects currently under construction / 2 Studies. •6 Street Improvement Projects •1 Drainage Project •3 Community Services Department Projects •2 Report Studies (PMP update and MDP) 23 Projects under design. •6 Transportation Projects •4 Traffic Signal Projects •3 Street Improvement Projects •2 Facilities Projects •8 Community Services Department Projects 36 FY 21/22 Proposed Projects PROPOSED FY 21-22 CIP PROJECTS 38 Project Category Project Number Project Name Amount Requested Transportation CIP 13-03 Holland Road Overpass $10,015,368 Transportation CIP 13-04 Bradley Bridge over Salt Creek $1,439,665 Transportation CIP 20-01 Scott Road/Bundy Canyon Road Widening $2,978,640 Transportation CIP 22-02 Valley Boulevard Widening and Missing Link $1,300,000 Transportation CIP 22-03 McCall Boulevard Widening (Oakhurst Ave. to Menifee Road)$2,517,000 Transportation CIP 22-04 Bailey Road Improvements $2,057,000 Traffic Signal CIP 21-11 Menifee Road and Garbani Road Traffic Signal $1,140,000 Traffic Signal PW-TS-01 McCall Blvd. and Grosse Pointe Traffic Signal $600,000 St. Improvement PMP PMP: Tradewinds Community (romoland)$969,663 St. Improvement CIP 22-06 Menifee Rd Resurfacing-Holland Rd to Newport Road $1,500,000 St. Improvement PW-IMP-01 Normandy Road Pedestrian Improvements $410,000 St. Improvement PW-IMP-02 HSIP -Menifee Road (Hwy 74 to North City Limits)$100,000 Facilities Purchase of Police Headquarters $4,950,000 Facilites Police Station Upgrades -Wall, Carports, Lighting $250,000 Faciites Police Station Parking Lot Upgrades -Resurfacing $390,000 Facilities New Financial Software $1,125,000 Facilities Fuel Station $750,000 Facilities Council Chambers Window Upgrades $200,000 C.S.Park & Facility Multi Use Trailers $750,000 C.S.CS007 Park Amenity Enhancements $50,000 C.S.CS042 Sports Court Resurfacing $80,000 C.S.CS021 Parking Lot Resurfacing $50,000 C.S.CS014 Park Lighting $150,000 C.S.CS047 Shade Structures $45,000 Fleet PW Equipment & Vehicles $432,000 24 Projects $34,249,336 CIP 13-03 HOLLAND ROAD/ I-215 OVERPASS 1 Transportation Engineering Apr-22 18 months 2,3 Design 1,538,190$ 1,277,361$ Environmental 800,000$ 780,000$ Right of Way 3,110,000$ 2,652,381$ Construction Management 2,940,000$ -$ Construction 22,296,987$ -$ Total Project Costs 30,685,177$ 4,709,742$ Estimated Maintenance Cost: Proposed Fund #2021-22 2022-23 2023-24 2024-25 2025-26 Future Years 100 -$ 2,000,000$ -$ -$ -$ -$ -$ 2,000,000$ 105 2,167,663$ -$ -$ -$ -$ -$ -$ 2,167,663$ 310 552,000$ 5,903,000$ -$ -$ -$ -$ -$ 6,455,000$ 320 4,573,449$ 112,368$ -$ -$ -$ -$ -$ 4,685,817$ 415 8,905,011$ 1,000,000$ -$ -$ -$ -$ -$ 9,905,011$ 509 2,055,744$ 1,000,000$ -$ -$ -$ -$ -$ 3,055,744$ 510 241,797$ -$ -$ -$ -$ -$ -$ 241,797$ 526 1,723,638$ -$ -$ -$ -$ -$ -$ 1,723,638$ 527 485,941$ -$ -$ -$ -$ -$ -$ 485,941$ 20,705,243$ 10,015,368$ -$ -$ -$ -$ -$ 30,720,611$ Target Construction Start: Construction Duration: Priority: Category: Department: Project Description, Purpose, and Need: PROJECT BUDGET DETAILS TOTALFuture Funding EstimatesApproved Funding to date TOTALS General Fund DIF Citywide - Storm Drain Facilities DIF Citywide - Circulation DIF 17 - Signals DIF 17 - Roads Menifee Valley RBBD Capital Projects TUMF Measure DD Fund Name Council District (s): 2022 Target Year Estimates Project Cost by Phase Project Map Fund Source Expenditures to-date The project is located on Holland Road between Haun Road and Hanover Road. The project will construct a four lane bridge over the I-215 which will include dedicated bike lanes, sidewalks, traffic signals at Haun Rd. and Hannover Rd., lighting, signing and striping. The project is needed due to the increase in residential and commercial development on both sides of the I-215 which creates traffic congestion at the existing Newport Road and Scott Road interchanges. In addition, the project will create a much needed east-west connection for motorists and pedestrians. Street maintenance over a 5 year period will consist of a Slurry seal treatment at year 5 and 10, and AC overlay at year 15. Maintenance cost over a 15 year period is estimated to be $860,000. Street Maintenance is typically funded by Gas Tax, Measure A, Measure DD, and SB1 funds.https://cityofmenifee.maps.arcgis.com/apps/Shortlist/index.html?appid=8604e81f1bb14fd3bda909f8ca27a5ea ROW acquisition/Final DesignStatus: 39 CIP 13-04 Bradley Bridge over Salt Creek 1 Transportation Engineering Jul-23 12 months 1,2 Design 529,512$ 512,596$ Environmental 300,000$ 280,000$ Right of Way -$ Construction Management 1,460,000$ Construction 12,200,000$ Total Project Costs 14,489,512$ 792,596$ Estimated Maintenance Cost: Funding to date Proposed Fund #Fund Name 2021-22 2022-23 2023-24 2024-25 2025-26 Future Years 105 500,000$ -$ 2,200,000$ -$ -$ -$ -$ 2,700,000$ 220 558,721$ -$ 891,297$ -$ -$ -$ -$ 1,450,018$ 509 292,256$ 420,713$ -$ -$ -$ -$ -$ 712,969$ 520 -$ -$ 278,222$ -$ -$ -$ -$ 278,222$ 526 194,349$ 700,000$ 2,200,000$ -$ -$ -$ -$ 3,094,349$ 527 -$ 318,952$ 368,660$ -$ -$ -$ -$ 687,612$ -$ -$ 2,000,000$ -$ -$ -$ -$ 2,000,000$ -$ -$ 3,245$ -$ -$ -$ -$ 3,245$ -$ -$ -$ -$ -$ -$ 3,563,097$ 3,563,097$ 1,545,326$ 1,439,665$ 7,941,424$ -$ -$ -$ 3,563,097$ 14,489,512$ TOTALS Project Description, Purpose, and Need: The project is located on Bradley Road between Rio Vista Drive and Potomac Street. The project will construct a bridge over the Salt Creek Channel with capacity for four lanes replacing the existing at grade two-lane road. The project will also construct sidewalks, relocate utilities, and improve drainage. Due to the existing at grade crossing, Bradley road experiences frequent flooding and closures which affect the north-west connection and also affects emergency response time. The proposed bridge will provide a year-round crossing and improve mobility to motorists and pedestrians. Design, Resource Agency permits 2023 Target Year Estimates Expenditures to-date Project Map Construction Duration: Target Construction Start: Project Cost by Phase Department: Category: Priority: Council District (s): Project Status: DIF Citywide - Circulation Street maintenance over a 15 year period will consist of a Slurry seal treatment at years 5 and 10, and AC overlay at year 15. Maintenance cost over a 15 year period is estimated to be $380,000. PROJECT BUDGET DETAILS Fund Source Future Funding Estimates https://cityofmenifee.maps.arcgis.com/apps/Shortlist/index.html?appid=8604e81f1bb14fd3bda909f8ca27a5ea Street Maintenance is typically funded by Gas Tax, Measure A, Measure DD, and SB1 funds. DIF Citywide - Public Use & Comm. Fac. DIF 17 - Roads Measure A Measure DD UNFUNDED Developer Deposits Other: Riverside County Flood Control DIF Citywide - Storm Drain Facilities TOTAL 40 CIP 20-01 Scott Road/Bundy Canyon Road 1 Transportation Engineering TBD 14 months 2 Design 2,472,940$ 1,512,883$ Environmental 300,000$ 150,000$ Right of Way 3,900,000$ Construction Management 2,656,125$ Construction 21,212,113$ Total Project Costs 30,541,178$ 1,662,883$ Estimated Maintenance Cost: Proposed Fund #2021-22 2022-23 2023-24 2024-25 2025-26 Future Years 105 -$ -$ -$ -$ -$ 3,230,000$ -$ 3,230,000$ 220 -$ -$ -$ -$ -$ 951,297$ -$ 951,297$ 310 2,370,000$ 2,809,000$ -$ -$ -$ 7,729,000$ -$ 12,908,000$ 320 -$ -$ -$ -$ -$ 2,500,000$ -$ 2,500,000$ 410 601,794$ 169,640$ -$ -$ -$ 624,926$ -$ 1,396,360$ 527 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 9,555,521$ 9,555,521$ 2,971,794$ 2,978,640$ -$ -$ -$ 15,035,223$ 9,555,521$ 30,541,178$ 2,971,794$ 5,950,434$ 5,950,434$ 5,950,434$ 5,950,434$ 20,985,657$ 30,541,178$ Priority: Project Status: Construction Duration: Target Construction Start: Department: CUMULATIVE TOTALS Category: Project Cost by Phase TOTALS UNFUNDED Developer Deposits DIF Citywide - Storm Drain Facilities Scott Road RBBD Capital Projects TUMF Measure A Measure DD Fund Name Council District (s): PROJECT BUDGET DETAILS Fund Source Approved Funding to date Future Funding Estimates TOTAL Project Description, Purpose, and Need: Current Year Estimates Expenditures to-date Project Map Design and Environmental https://cityofmenifee.maps.arcgis.com/apps/Shortlist/index.html?appid=8604e81f1bb14fd3bda909f8ca27a5ea The project is located on Scott Road from Hun Road to Sunset Avenue (limit with City of Wildomar). The project will widen the existing two lane road to four lanes with an additional 14 foot wide median and 10 foot wide shoulders on both sides which will be used for buffered bike lanes. In addition, the project will construct and/or modify traffic signals along the project. 41 CIP 22-02 Valley Boulevard Widening 1 Transportation Engineering Jul-23 12 months 2 Design 520,000$ Environmental 90,000$ Right of Way 500,000$ Construction Management 590,000$ Construction 6,000,000$ Total Project Costs 7,700,000$ -$ Estimated Maintenance Cost: Proposed Fund #2021-22 2022-23 2023-24 2024-25 2025-26 Future Years 105 Measure DD -$ -$ -$ 1,000,000$ -$ 1,000,000$ 220 Measure A -$ -$ -$ 703,333$ -$ 703,333$ 415 Menifee Valley RBBD -$ -$ -$ 1,934,642$ -$ 1,934,642$ 526 DIF Citywide - Circulation -$ 1,300,000$ -$ 2,319,631$ -$ 3,619,631$ 527 DIF Citywide - Storm Drain Facilities -$ -$ -$ 442,394$ -$ 442,394$ UNFUNDED -$ -$ -$ -$ -$ -$ -$ 1,300,000$ -$ 6,400,000$ -$ 7,700,000$ Project Description, Purpose, and Need:Priority: Design Project Cost by Phase Project Status: Construction Duration Target Construction Start: The project will construct a 4-lane road and two uncompleted sections of Valley Boulevard between Murrieta Road and Chamabers Avenue. In addition, the project will also install Traffic Signals, street lighting, sidewalks, and ADA ramps. This project is needed to mitigate traffic congestion due to increasing development on the north side of the City and provide a necessary connection to Murrieta Road. Council District (s): Project Map https://cityofmenifee.maps.arcgis.com/apps/Shortlist/index.html?appid=8604e81f1bb14fd3bda909f8ca27a5ea Category: Current Year Estimates TOTALS Fund Name Department: PROJECT BUDGET DETAILS Fund Source Approved Funding to date Future Funding Estimates TOTAL Expenditures to-date 42 CIP 22-03 McCall Boulevard Widening 1 Transportation Engineering Aug-22 7 months 4 Design 340,000$ Environmental 100,000$ Right of Way 75,000$ Construction Management 306,000$ Construction 2,623,000$ Total Project Costs 3,444,000$ -$ Estimated Maintenance Cost: Proposed Fund #2021-22 2022-23 2023-24 2024-25 2025-26 Future Years 105 Measure DD -$ -$ 927,000$ 927,000$ 310 TUMF -$ 2,517,000$ -$ 2,517,000$ UNFUNDED -$ -$ -$ -$ -$ -$ -$ 2,517,000$ 927,000$ 3,444,000$ https://cityofmenifee.maps.arcgis.com/apps/Shortlist/index.html?appid=8604e81f1bb14fd3bda909f8ca27a5ea PROJECT BUDGET DETAILS Fund Source Approved Funding to date Future Funding Estimates TOTALFund Name Project Cost by Phase Project Map Current Year Estimates Expenditures to-date TOTALS Project Description, Purpose, and Need:Priority: The project is located on McCall Boulevard between Oakhurst Avenue (Hospital Entrance) and Menifee Road. The project will widen the existing two-lane road to four lanes including a 12' center median. The project will also relocate utilities, install sidewalks and ADA ramps, and modify two existing traffic signals. The project is needed in order to mitigate increase traffic through the area due to residential and commercial development . Category: Department: Target Construction Start: Construction Duration Project Status:Preliminary Engineering Council District (s): McCall Blvd.Menifee Rd.43 CIP 22-04 Bailey Park Boulevard Widening 1 Transportation Engineering Apr-22 4 months 2 Design 150,000$ Environmental 50,000$ Right of Way 150,000$ Construction Management 80,000$ Construction 1,800,000$ Total Project Costs 2,230,000$ -$ Estimated Maintenance Cost: Proposed Fund #2021-22 2022-23 2023-24 2024-25 2025-26 Future Years 105 Measure DD 450,000$ 113,583$ -$ -$ -$ -$ 563,583$ 220 Measure A 657,000$ -$ -$ -$ -$ -$ 657,000$ 320 Capital Projects 950,000$ -$ -$ -$ -$ -$ 950,000$ Developer Deposits -$ 59,417$ -$ -$ -$ -$ UNFUNDED -$ -$ -$ -$ -$ 0$ -$ 2,057,000$ 172,999.71$ -$ -$ -$ 0$ 2,230,000$ https://cityofmenifee.maps.arcgis.com/apps/Shortlist/index.html?appid=8604e81f1bb14fd3bda909f8ca27a5ea Fund Name TOTALS PROJECT BUDGET DETAILS Fund Source Approved Funding to date Future Funding Estimates TOTAL Priority: Category: Department: Project Description, Purpose, and Need: The project will construct approximately 1,400 linear feet of industrial collector road, curb and gutter, sidewalks, steet lighting, ADA ramps, street lighting and drainage inlets. The project will address road safety and traffic efficiency due to the lack of roads and illumination in the area. In addition, the project will promote economic development in this area of the City. Council District (s): Current Year Estimates Expenditures to-date Project Map Target Construction Start: Construction Duration Project Status:Preliminary Engineering Project Cost by Phase 44 CIP 21-11 Menifee Rd / Garbani Rd Traffic Signal Description: Re-align and widen existing intersection. Install new Traffic signal. Construct ADA ramps. District: 3 Estimated Cost: $1,433,690 Funding Source: General Fund, DIF Citywide Circulation PW-TS-01 McCall Blvd / Grosse Pointe Traffic Signal Description:Install new Traffic signal. Upgrade ADA ramps. District: 1 Estimated Cost: $600,000 Funding Source: DIF Citywide Circulation 45 PMP: Tradewinds Community Resurfacing Description: Resurface existing pavement. Install ADA ramps as allowed by ROW. District: 4 Estimated Cost: $969,663 Funding Source: Gas Tax, RMRA (SB1), Measure A CIP 22-06 Menifee Road Resurfacing (Holland Rd to Newport Rd) Description: Resurface existing pavement. Upgrade ADA ramps. Re-stripe for bicycle lanes, signage. District: 3 Estimated Cost: $1,500,000 Funding Source: RMRA (SB1 46 PW-IMP-01: Normandy Rd. Pedestrian Improvements Description: Widen existing road shoulder (North side) to accommodate multi-use trail. District: 1 Estimated Cost: $410,000 Funding Source: Measure DD, Measure A PW-IMP-13: HSIP –Menifee Road Description: Improve existing signal hardware, striping, signs, and intersection improvements as needed. District: 4 Estimated Cost: $100,000 Funding Source: Measure DD 47 Proposed Projects CS049 Fuel Station Description: Installation of an above ground fueling station at a TBD location. Installing an above ground fuel station and purchasing the fuel in bulk, would save an estimated cost of 50% a year. Right now, the City fleet spends an average of $300,000 annually on fuel, we could reduce that cost to $150,000 annually by purchasing in bulk. Our own fueling station would become a regional asset by allowing our emergency vehicles to get fuel in the case of a natural disaster where a regular gas station would be shut down. It will take an estimated 5 years to recoup the cost of the station. Location: TBD Estimated Cost: $750,000 Funding Source: General $150,000 annually in savings Regional Asset 5-year cost recovery 48 Proposed Projects CS050 Police Station Parking lot Description: Replace back gravel parking lot with permeable surface. Asphalt front dirt parking lot Location: Police Station Estimated Cost: $390,000 Funding Source: General CS051 Police Station Upgrades Description: Completion of the perimeter wall, carports for detectives, and additional security lighting in the parking lots Location: Police Station Estimated Cost: $250,000 Funding Source: General 49 Proposed Projects CS052 Park &Facility Multi-Use Building Description: Rehab the existing manufactures building behind Station 7 to create locker rooms for parks staff, Rangers as well as conference/training room and possibly sleeping quarters. Location: Station 7 Estimated Cost: $500,000 Funding Source: General CS053 Council Chambers Window Upgrades Description: Replace Council Chambers exterior windows with safety glass Location: City Hall Estimated Cost: $200,000 Funding Source: General 50 Proposed Projects CS042 Sports Court Resurfacing Description: Renovation of the sports courts, basketball and tennis courts as well as volleyball courts Location: Hidden Hills Park, John Denver Park Estimated Cost: $80,000 Funding Source: City Wide DIF, CSA 33 reserves CS047 Shade Structure Description: Free standing shade structures to cover existing playgrounds Location: John Denver Park Estimated Cost: $45,000 Funding Source: CSA 33 reserves CS007 Park Amenity Enhancements Description: Replace and install new park furnishings: picnic tables, park benches, trash and coal receptacles and dog bag dispensers. Location: Lazy Creek, Mayfield, Central Estimated Cost: $50,000 Funding Source: 620 Quimby 51 Proposed Projects CS021 Parking Lot Resurfacing Description: Slurry seal, curb/gutter and striping of existing parking lot Location: Lazy Creek Estimated Cost: $50,000 Funding Source: City Wide DIF CS014 Park Lighting Description: Replace or add new LED lighting at various parks Location: Evans Pump Track, Calle Tomas Estimated Cost: $150,000 Funding Source: City Wide DIF, 2015-2 Parks DIF 52 Fleet Services: Public Works Equipment & Vehicles Description: New or Replacement Equipment and Vehicles Estimated Cost: $415,000 Funding Source: Measure DD Funds REQUEST TYPE DESCRIPTION PURPOSE COST REPLACEMENT Asphalt Patch Truck (5 CUYD Capacity)•Assigned to Asphalt •Replace existing smaller Asphalt Patch Truck (2 CUYD Capacity) to increase staff’s pothole production capacity. •Vehicle will be auctioned off. $240,000 REPLACEMENT Skid-Steer Loader (75 HP)•Assigned to Asphalt and Concrete •Replace existing smaller (50 HP) Skid-Steer Loader (MY. 2015) •re-purpose to PARKS Dept $ 75,000 NEW Public Works Truck •Assigned to Street Maintenance •Used for lane striping, traffic legends and stencils $ 60,000 NEW Traffic Arrowboard Truck •Assigned to Traffic Control and Special Events •Will have dedicated traffic arrowboard and ability to carry traffic cones, delineators and barricades $ 40,000 53 City Council Discussion on Proposed Projects