Loading...
29975 BLUE RIDGE CT FIRE21-1770 MERIT@BANNER PARKJohnathan Baker Subject: FIRE21-1770 TR32102 SPK FINAL LOT 24 Location: 29975 BLUE RIDGE CT Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Fri 3/25/2022 8:30 AM Fri 3/25/2022 9:00 AM (none) Meeting organizer Johnathan Baker 2 HYDRANT SYSTEM Thrust block pre -pour Under round rough Under round hydro Flush Final SPRINKLER U.G. Thrust block pre-nour Under round rough Under round h dro Flush Final FIRE SPRINKLER Weld inspection Overhead rou h piping Overhead hydro UG flush / OK to connect Main drain/Ins ect. Test High pile storage In -rack sprinklers Hose racks Final KITCHEN HOOD EXTINGUISHING Detection system Function Test Gas/Electrical shut-off Nozzle model/placement Fire alarm connection Final SPRAY BOOTHS Installation Air flow test Mechanical interlock Extinguishing system Fire alarm connection Cell#: PASS FAIL Co. Name: FSS CrossSt: MERIT @BANNER PARK FIRE ALARM PASS FAIL Rough -wire inspection Function test Duct detectorslvelocit 24 hr, batte test Sprinkler monitoring Final SPECIAL SUPPRESSION Door fan test Abort test Mechanical shutdown Detector test Delugelpre-action Final UST/AST TANK Installation Removal Emergency shut off Primary piping Secondary piping Dispensers & shear valves Final MISC. INSPECTION Spray booths Hood/duct extinguishing High pile rack storage H.P. vents/access/corridors Tract accessthydrant verification Other: KNOX SYSTEM Building Knox box Gate access Knox box/padlock BUILDING INSPECTIONS T/I final Shell final 11 Johnathan Baker Subject: FIRE21-1770 TR 32102 O/H ROUGH/HYDRO LOT 24 Location: 29975 BLUE RIDGE CT Start: Thu 12/23/2021 8:00 AM End: Thu 12/23/2021 8:30 AM Recurrence: (none) Organizer: Johnathan Baker Call Handling Mode 2: 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name: FSS l..russot: IyICKI I �CSHIVIVCK HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping.: UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary pipin In -rack sprinklers Secondwy piping Hose racks Dis ensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: L Finish Time: 3