29974 BLUE RIDGE CT FIRE21-1771 MERIT@BANNER PARKJohnathan Baker
Subject: FIRE21-1771 TR32102 SPK FINAL LOT 25
Location: 29974 BLUE RIDGE CT
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2
Rep. Name: JUAN
Phone#: 951-358-97R�
Fri 3/25/2022 8:30 AM
Fri 3/25/2022 9:00 AM
(none)
Meeting organizer
Johnathan Baker
2
HYDRANT SYSTEM
Thrust block re -pour
Underground rough
—Underground hydro
Flush
Final
SPRINKLER U.G.
Thrust block pre -pour
Underground rough
Underground hydro
Flush
Final
FIRE SPRINKLER
Weld inspection
Overhead rough piping
Overhead hydro
UG flush / OK to connect
Main drain/Inspect. Test
High pile story e
In -rack sprinklers
Hose racks
Final
KITCHEN HOOD EXTINGUISHING
Detection system
Function Test
Gas/Electrical shut-off
Nozzle model/placement
Fire alarm connection
Final
SPRAY BOOTHS
Installation
Air flow test
Mechanical interlock
Extinguishing system
Fire alarm connection
Cell#:
PASS
FAIL
Co. Name: FSS
CrossSt: MERIT @BANNER PARK
FIRE ALARM PASS FAIL
Rauh wire inspection
Function test
Duct detectors/velocit
24 hr. batte test
Sprinkler„monitoring
Final
SPECIAL SUPPRESSION
1 Door fan test
Abort test
Mechanical shutdown
Detector test
Delu a/pre-action
Final
UST/AST TANK
Installation
Removal
shut off
Dispensers & shear valves
Final
MISC. INSPECTION
Spray booths
Hood/duct extin guishin
High pile rack storage
H.P. vents/access/corridors
Tract access/hydrant verification
Other:
KNOX SYSTEM
Building Knox box
Gate access Knox box/padlock
BUILDING INSPECTIONS
T/I final
Shell final
9
Johnathan Baker
Subject: FIRE21-1771 TR 32102 O/H ROUGH/HYDRO LOT 25
Location: 29974 BLUE RIDGE CT
Start: Thu 12/23/2021 8:30 AM
End: Thu 12/23/2021 9:00 AM
Recurrence: (none)
Meeting Status: Meeting organizer
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: JUAN
Phone#: 951-358-9783
Cell#:
Co. Name: FSS
CrossSt: MERIT@ BANNER
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Under round rou h
Door fan test
Underground h dro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
Y1
UST/AST TANK
X
Overhead hydro
-
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary giping
In-racksprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING i
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
7