Loading...
29951 BLUE RIDGE CT FIRE21-1769 MERIT@BANNER PARKJohnathan Baker Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-1769 TR32102 SPK FINAL LOT 22 29951 BLUE RIDGE CT Thu 3/3/2022 11:00 AM Thu 3/3/2022 11:30 AM (none) Meeting organizer Johnathan Baker K Cell#: Co. Name: FSS uroSSSt: MLKI I (CVbANNLK HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocitv Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough 1\ Door fan test Underground hydro Ll(kbort.test Flush \ Mechanical shutdown Final \ Detector test FIRE SPRINKLER \\ U Deluge/pre-action Weld inspection FiuAl Overhead rough piping \ \ UST/AST TANK Overhead hydro \ Installation UG flush / OK to connect / Removal Main drain/Inspect. Test i/ Emergency shut off High pile storage \ / Primary piping In -rack sprinklers \ / Seconda piping Hose racks Dis ensers & shear valves Final / Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off / High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation BuildingKnox box Air flow test Gate access Knox box/Dadlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 15 Johnathan Baker Subject: FIRE21-1769 TR32102 O/H ROUGH/HYDRO LOT 22 Location: 29951 BLUE RIDGE CT Start: Tue 12/21/2021 3:00 PM End: Tue 12/21/2021 3:30 PM Recurrence: (none) Organizer: lohnathan Baker Call Handling Mode 2: 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name: FSS uras5JL: IVICKI I (QJ t5AIVIVtK HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 40