Loading...
29950 BLUE RIDGE CT FIRE21-1774 MERIT@BANNER PARKJohnathan Baker Subject: FIRE21-1774 TR32102 SPK FINAL LOT 27 Location: 29950 BLUE RIDGE CT Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Fri 3/25/2022 9:00 AM Fri 3/25/2022 9:30 AM (none) Meeting organizer Johnathan Baker 2 HYDRANT SYSTEM Thrust block re -pour Underground rough Under round h dra Flush Final SPRINKLER U.G. Thrust block pre -pour Underground rough Under round hydro Flush Final FIRE SPRINKLER Weld inspection Overhead rough piping Overhead hydro UG flush / OK to connect Main drain/Inspect. Test High pile storage In -rack sprinklers Hose racks Final KITCHEN HOOD EXTINGUISHING Detection system Function Test Gas/Electrical shut-off Nozzle model/placement Fire alarm connection Final SPRAY BOOTHS Installation Air flow test Mechanical interlock Extinguishing system Fire alarm connection Cell#: PASS i FAIL Co. Name: FSS CrossSt: MERIT @BANNER PARK FIRE ALARM PASS FAIL Rough -wire inspection Function test Duct detedtors/velacit 24 hr. battery test Sprinkler monitoring Final SPECIAL SUPPRESSION 06or fan test -Abort test Mechanical shutdown Detector test Deluge/pre-action Final UST/AST TANK Installation Removal shut off / Dispensers & shear valves / Final / MISC. INSPECTION / Spray booths Hood/duct extinguishing High pile rack storage H.P. vents/access/corridors Tract access/hydrant verification Other: KNOX SYSTEM Building Knox box Gate access Knox box/padlock BUILDING INSPECTIONS T/I final Shell final 13 Johnathan Baker Subject: FIRE21-1774 TR32102 O/H ROUGH/HYDRO LOT 27 Location: 29950 BLUE RIDGE CT Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Tue 1/4/2022 2:00 PM Tue 1/4/2022 2:30 PM (none) Johnathan Baker 2 Cell#: Co. Name FSS CrossSt: MERIT @ BANNER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. baftwy test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hvdro 1':. Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time Finish Time: 19