Loading...
29941 BOLIVIAN CT FIRE21-1390 CREST@BANNER PARKJohnathan Baker Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-1390 TR32102 SPK FINAL LOT 40 29941 BOLIVIAN CT Tue 12/21/2021 8:00 AM Tue 12/21/2021 8:30 AM (none) Meeting organizer Menifee OFM 2 Co. Name Cell#: FSS CrossSt: CREST 0 BANNER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block re -pour Rough -wire inspection Under round rouoh Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monit dying SPRINKLER U.G. Final Thrust block pre -pour \ / \SPECIAL SrUPPRESSION Underground rough D,,ODr fan test Underground hydro ` AboPrtest Flush lMechanicAl shutdown Final \ ` Detector test FIRE SPRINKLER Del a/pre-action Weld inspection I Firfal Overhead rough piping \ ,/ UST/AST TANK Overhead hydro Installation UG flush / OK to connect _ Removal Main drain/Inspect. Test / Emergency shut off High pile storage / Primary piping In -rack sprinklers Secondary piping Hose racks i Dispensers & shear valves Final % Final KITCHEN HOOD EXTINGUISHING / MISC. INSPECTION Detection system / Spray booths Function Test % Hood/duct extinguishing Gas/Electrical shut-off i High pile rack storage Nozzle model/placement ' H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 1 Iliana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phone#: 951-847-2908 FIRE21-1390 TR32102 O/H ROUGH/HYDRO LOT 40 29941 BOLIVIAN CT Thu 10/7/2021 11:30 AM Thu 10/7/2021 12:00 PM (none) Menifee OFM 2 Cel I#: Co. Name: FSS VI V0017l. lrf%CJ I `w 0P1IVIVCr[ HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro — Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: F