Loading...
29929 BOLIVIAN CT FIRE21-1389 CREST@BANNER PARKJohnathan Baker Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-1389 TR32102 SPK FINAL LOT 39 29929 BOLIVIAN CT Tue 12/21/2021 8:00 AM Tue 12/21/2021 8:30 AM (none) Meeting organizer Menifee OFM 2 Co. Name: Cell#: FSS LZOSSZA: UlltJ 1 (CVbANNtK HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block re -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring_ SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough / Door fan test Underground hydro Abort test Flush \ Mechanical shutdown Final N Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping Z, UST/AST TANK Overhead hydro ,� IrAallation UG flush / OK to connect \ /Removal Main drain/Inspect. Test / Emergency shut off High pile storage Primary piping In -rack sprinklers i Seconda piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off L ' High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 3 Iliana Gutierrez Subject: FIRE21-1389 TR32102 O/H ROUGH/HYDRO LOT 39 Location: 29929 BOLIVIAN CT Start: Thu 10/7/2021 11:30 AM End: Thu 10/7/2021 12:00 PM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: HECTOR Phone#: 951-847-2908 Cell#: Co. Name: FSS CrossSt: CREST @ BANNER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final I Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 7