29928 BOLIVIAN CT FIRE21-1391 CREST@BANNER PARKJohnathan Baker
Subject: FIRE21-1391 TR32102 SPK FINAL LOT 41
Location: 29928 BOLIVIAN CT
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
Tue 12/21/2021 8:30 AM
Tue 12/21/2021 9:00 AM
(none)
Meeting organizer
Menifee OFM
2
Co. Name
Cell#:
FSS
GrossSt: GRES I (cDBANNER
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. batt test
Final
Sprinklevfnonitoring
SPRINKLER U.G.
Final /
Thrust block pre -pour
n
\..
SPECIAL SUPPRESSION
Underground rough
Door,fan test
Underground hydro
Ab4 test
Flush
chanical shutdown
Final
I6etector test
FIRE SPRINKLER
\\
Deluge/pre-action
Weld inspection
Final
Jig
Overhead rough piping
UST/AST TANK
Overhead hydro
/
\ /
Installation
UG flush / OK to connect
/
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
\
Primary piping
In -rack sprinklers
\.
Seconds piping
Hose racks
Dispensers & shear valves
Final
J<_ %
Final
KITCHEN HOOD EXTINGUISHING
/
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
9
(liana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phone#: 951-847-2908
FIRE21-1391 TR32102 O/H ROUGH/HYDRO LOT 41
29928 BOLIVIAN CT
Thu 10/7/2021 11:30 AM
Thu 10/7/2021 12:00 PM
(none)
Menifee OFM
2
Cell#:
Co. Name:
FSS
liIUJJJI. I�RC�71 ,_V DfAIVIVCR
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
I
I Finish Time:
3