Loading...
29928 BOLIVIAN CT FIRE21-1391 CREST@BANNER PARKJohnathan Baker Subject: FIRE21-1391 TR32102 SPK FINAL LOT 41 Location: 29928 BOLIVIAN CT Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Tue 12/21/2021 8:30 AM Tue 12/21/2021 9:00 AM (none) Meeting organizer Menifee OFM 2 Co. Name Cell#: FSS GrossSt: GRES I (cDBANNER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. batt test Final Sprinklevfnonitoring SPRINKLER U.G. Final / Thrust block pre -pour n \.. SPECIAL SUPPRESSION Underground rough Door,fan test Underground hydro Ab4 test Flush chanical shutdown Final I6etector test FIRE SPRINKLER \\ Deluge/pre-action Weld inspection Final Jig Overhead rough piping UST/AST TANK Overhead hydro / \ / Installation UG flush / OK to connect / Removal Main drain/Inspect. Test Emergency shut off High pile storage \ Primary piping In -rack sprinklers \. Seconds piping Hose racks Dispensers & shear valves Final J<_ % Final KITCHEN HOOD EXTINGUISHING / MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 9 (liana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phone#: 951-847-2908 FIRE21-1391 TR32102 O/H ROUGH/HYDRO LOT 41 29928 BOLIVIAN CT Thu 10/7/2021 11:30 AM Thu 10/7/2021 12:00 PM (none) Menifee OFM 2 Cell#: Co. Name: FSS liIUJJJI. I�RC�71 ,_V DfAIVIVCR HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: I I Finish Time: 3