29916 BOLIVIAN CT FIRE21-1392 CREST@BANNER PARKJohnathan Baker
Subject:
Location:
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
FIRE21-1392 TR32102 SPK FINAL LOT 42
29916 BOLIVIAN CT
Tue 12/21/2021 8:30 AM
Tue 12/21/2021 9:00 AM
(none)
Meeting organizer
Menifee OFM
2
Cell#:
Co. Name
FSS
UrOSS61: L;Kt51 (CD IJANNtK
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler mgNtoring
SPRINKLER U.G.
Final
Thrust block pre -pour
F'ECIAL SUPPRESSION
Underground rough
`
j
Door test
Underground hydro
Abort/test
Flush
We.chanical shutdown
Final
CAtector test
FIRE SPRINKLER
/belu a/pre-action
Weld inspection
\
Final
Overhead rough piping
,
%
UST/AST TANK
Overhead hydro
/
/
Installation
UG flush / OK to connect
/ /
/
Removal
Main drain/Inspect. Test
M /
/
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
✓
Dispensers & shear valves
Final
/
Final
KITCHEN HOOD EXTINGUISHING
/
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
7
Iliana Gutierrez
Subject: FIRE21-1392 TR32102 O/H ROUGH/HYDRO LOT 42
Location: 29916 BOLIVIAN CT
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phone#: 951-847-2908
Thu 10/7/2021 12:30 PM
Thu 10/7/2021 1:00 PM
(none)
Menifee OFM
2
Cell#:
Co. Name: FSS
%-AUS,JL. k mr-01 %_v CSHIVIVCK
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rou h-wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
A
UST/AST TANK
X
Overhead hydro
%
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
Start Time: Finish Time:
15